Loading…
Loading…
21,059 results • Best match
CONSTRUCTION OF BOUNDARY WALL AND PAINTING OF PARTONA FP SCHOOL AT SRIHARIPUR (BOOTH NO- 89) AT GOPE GANTAR-I GP UNDER MEMARI-I PS , FUND- APAS
Construction of pump house, Boundary Wall, Tube well Boring (ODEX-165 method), rising main of 3rd TW site of Rahimabad WSS under Alipurduar Division, PHE Dte.
Installation of RBT over boundary wall located from Paediatric building to Hospital Morgue and repair of adjacent drain of Burdwan Medical College and Hospital, Purba Bardhaman.
Boundary Wall at Fuslatanr Primary School at PS 121 AC 239 Balarampur within Chatuhansa Gram Panchayat under Arsha Dev. Block ID- APAS/01/239/121/0002
Boundary Wall at Mudali Primary School at PS 121 AC 239 Balarampur within Chatuhansa Gram Panchayat under Arsha Dev. Block ID- APAS/01/239/121/0003
REPAIR TO BOUNDARY WALL, GATE LEAKAGE/ SEEPAGE TO ROOF, JOINERY PLASTER WORK AND MISC WORK, ROAD PATH AND CULVERT AT HALDIA UNDER GE (I) (CGN) KOLKATA
Boundary wall at 124 no ICDS centre at Gopalpur Paschim para (Length 45FT Hight 6FT). 170 nos people will be benefited,APAS/01/259/243/0002
Thorough Repair and Maintenance and Painting of Boundary Wall, Painting of Fencing and tit bit maintenance works at Alipurduar 220KV Substation under Alipurduar Area Office, WBSETCL
Construction of Boundary wall at Khelaghar Club at sansad no- 8 under Dhubulia -I Gram Panchayat under 15th CFC Un Tied for the year 2025-2026
Repairing and maintenance work of RCC Elevated Reservoir, Boundary Wall, Land development and other allied works at Gopalpur, Block Kanksa under RCFA Division-I PHE Dte.
Repairing of wall floor roof construction of stair room plaster of boundary wall slide at Dakshinbasudebpur Pry School under Amdahara G.P under Bhagwangola-II Panchayat Samity.
Construction of Kaludiar Khuajepara Idgha boundary wall on plot no 271/359 Jl No 48 at mouza Tartipur under MA ME fund of Hariharpara Development Block.
Renovation of control room building, switchyard and boundary wall along with Construction of control cable trench of Chakchaka 33/11 KV substation under Coochbehar Division WBSEDCL
Construction of Boundary wall of Old Baserkuthi SC Primary School at Baniadah under Kishamat dasgram Gram Panchayat within Dinhata-II Panchayat Samity, Sahebganj.Cooch Behar. Sl- 02
Construction of Boundary wall , laying of Paver block, surface drain and other alied works at the premises of Consumer Affairs Department at KSTP Secter H Asansol
Construction of drain raising, widening and repairing of existing surface drain adjacent to North side boundary wall at Indian Maritime University, Taratala campus, Kolkata (Balance work).
Fully upgradation work in Type III, Qtrs No 144 and painting work of Pump House boundary wall at AF Block Salt Lake Kolkata during 2026-27.
Re-Construction of Boundary Wall, Guard room and Sentry post in front of Residential campus which is affected for expansion of NH - 31D at BSF Raninagar.
Special Repair of Boundary Wall of Kendriya Vidyalaya No.2 at I.C. Block, Sector-III, Salt Lake, Kolkata, Balance work. SH:- Plaster, painting and sanitary work.
Special Repair and Painting of Boundary wall at Old Campus AF Block, Salt Lake, Kolkata during 2023-24. SH:- Painting work, brick work, removing work etc.
Construction of OCR complex along with boundary wall for Panitanki unit under SIB Siliguri. SW: Carrying out structural analysis and design of foundation & super structures etc..
CONSTRUCTION OF BOUNDARY WALL ( WEST SIDE ) AT KHALPARA N.P. SCHOOL AT SANSAD NO VI ( BOOTH NO 152 ) UNDER DAKSHIN BARA HALDIBARI GP WITHIN HALDIBARI DEVELOPMENT BLOCK
REPAIRING OF BOUNDARY WALL AT MAHADEVNAGAR GRAVEYARD at Ashuti-I GP , PS no-41 under Thakurpukur Maheshtala Development Block, Scheme ID-APAS/01/146/44/0001
CONSTRUCTION OF BOUNDARY WALL OF SUJANPUR PRIMARY SCHOOL AT SUJANPUR under SADHANPARA- II Gram Panchayat of Krishnagar-II Development Block from APAS/01/085/51/0003
Construction of Boundary Wall at Giribardhan at PS 269 AC 241 Joypur within Beldih Gram Panchayat under Arsha Dev. Block ID- APAS/01/241/269/0001
CONST OF BOUNDARY WALL INCLUDING PCC FLOOR AT MAHANTAPARA GRAMYA THAN , SHIB AND BAJRANG BALI THAN ,SANNYASI THAN UNDER ARJUNDAHA VILLAGE APAS/01/249/47/0007
Construction of Boundary wall at Alasin Idgah Mouza-Jayer,J.L No-93,Plot No-2484 within Jayer Dwarbasini Gram Panchayat under Pandua Panchayat Samity, Pandua, Hooghly.
Reapairing and renovation of District Judge Bungalow, fencing work on boundary wall at District Judge Bunglow compound at Tamluk Purba Midnapore during the year 2025-26
Estimate for Construction of proposed boundary wall at Kaijuri Sahapara Sadharan Idgah at Mouza Kaijuri JL No 67 Plot No 301 under Uluberia-I Panchayat Samity
Construction of boundary wall along with land filling at Plot No. 2316 of Mouza- Majerhat, J.L. No. 50, Block.Bhangar-II, Dist. 24Pgn(S) under BNDD-II
Cutting and re-sectioning of existing kutcha drains beside boundary wall from gate no.- 02 to main gate and out fall to Banpur canal at KTPS.
Repair Renovation of damage Boundary wall Construction of Septic tank Soak well Inspection Pit and concrete court yard for Residential Quater of Office Campus Purulia Sub Division I Office under Purulia Division Social Sector PWDte
2nd call for renovation of boundary wall construction of approach road tin-shade including installation of iron removal plant along with other allied works with necessary illumination at newly constructed building of Ukilpara-MaskalaibariSector CCC
Renovation of existing Switchyard including gravel respreading Construction of collapsed Boundary wall construction of Cable trench cover slab Development of 11 KV yard and Switchyard Pathway other allied civil works within the premises of Lachipur
Repair work of buildings and repairing and vertical extension of compound boundary wall at Matigara Polyclinic compound in the district of Darjeeling.
CONSTRUCTION OF BOUNDARY WALL AT TRIMOHINI GOVT PRY SCHOOL UNDER BARASAKDAL GP WITHIN DINHATA II DEV BLOCK APAS/01/007/76/0001
Construction of Boundary Wall of ICDS Center at Ward No 08 under Pujali Municipality. (APAS Scheme, Polling Station No 82, Sl no 06) (Scheme No. 251/PM/APAS/2025-26)
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-7) with Construction of 450 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamur
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-19) with Construction of 600 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamu
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-13) with Construction of 400 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamu
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-15) with Construction of 450 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamu
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-14A) with Construction of 1250 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Ja
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-10) with Construction of 350 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamu
Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-8) with Construction of 250 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamur
Construction of Proposed Boundary Wall around the proposed land of office building of the SDL and LRO office at Mathabhanga of Mathabhanga Sub Division PWD under Cooch Behar Division PWD during the year 2022-23.
Reconstruction of collapsed boundary wall, painting of PCC pole and iron structure and other allied civil works in the premises of Salas 33/11 KV Sub-Station under Dakshin Dinajpur Division, Balurghat, Dist.-Dakshin Dinajpur.
Construction of Boundary Wall And Fencing at Amgachia F.P. School at Booth No 141 at Amgachia GP, under Bishnupur-I Panchayat Samity. Fund -APAS (2025-26). ID- APAS/01/146/141/0004
SPECIAL REPAIR TO BLDG NO P-64 TPT COY (JOB NO SR(BLDG)10) and SPECIAL REPAIR OF BOUNDARY WALL AT BMC AREA(JOB NO SR(BLDG)11) UNDER GE(C) KOLKATA
REPAIRS TO DRAIN, PATH, CULVERT, FENCING, COMPOUND WALL AND MISC WORKS AND REPAIR / MAINTENANCE OF INTERNAL WIRING AND CONNECTED WORKS IN DOMESTIC AREA UNDER GE (AF) HASIMARA
REPAIR TO COMPOUND WALL, FENCING, DRAIN AND OTHER MISC WORK AT SMQ/OMQ AREA AND COMPREHENSIVE MAINTENANCE OF INTERNAL E/M FITTINGS/FIXTURES UNDER GE (AF) HASIMARA