Loading…
Loading…
88,107 results • Best match
PROVN OF INTERNAL BLACK TOP ROAD UNDER GE 865 EWS AT LEH
Chakshanjadi To Balagarh Black Top Road within Jamalpur Block. Length 5.550 km.
REPAIRING OF ROAD BLACK TOP FROM CHOUBERIA BAZAR TO RASID MONDAL HOUSE
SODIUM CITRATE 3.8% (1:4) 1.8/2.0 ML TUBE BLACK TOP VACCUTAINER
Construction of pucca Bitumen road from Thakurs house to Sunils house at Gangaram II Sansad.
Constructing Bituminous Road on existing bituminous road at Prabhag No. 6 B Mantri Chandak nagar.
BLACK TOP ROAD
REPAIRS MAINTENANCE OF FOOTPATH CHEQUERED TILES GATES AND OTHER MISC WORK AT 141 MC MF DET 46 BT ROAD AND BAGJOLA UNDER GE (NORTH) KOLKATA
Construction of Black Top road from Dharampur Panchagram HS to Prakash Bagchi House within Dharampur I GP under Gaighata PS Fund 15th FC ACTIVITY CODE 49081849
Construction of Black Top Road from Devipur Chotkatala towards Giyas Mondal house at Devipur under Nowpara-I GP.of Krishnagar-II Dev. Block, Nadia (Sl. No. 159)
Repairing of Black Top Road from H/O Bijan Nandi to Shatadal Sangha at new Koutukpur, Sansad No.X under Madanpur-I Gram Panchayat. AAP No.157
Construction of Black Top Road from Ishwarchandrapur Bottala towards Rajapur Culvert at Rajapur under Belpukur GP of Krishnagar-II Panchayat Samity under Pathashree-III 2023-24
Construction of Black Top Road from Kalam house to Esmail house at Begumpur Sansad XIV JL No 09 under Begumpur Bibipur Gram Panchaya Activity ID 40066081
Construction of Black Top Road from Manindra Dutta house towards Sardarpara at Kamarhati Colony under Sadhanpara-I GP.of Krishnagar-II Dev. Block, Nadia (Sl. No. 164)
Reconstruction of black top road from Kanchdaha Nauser Mondals house to Nimtala Deep well at Saguna GP of Swarupnagar Dev. Block,under Paray samadhan 2020-21
CONSTRUCTION OF BLACK TOP ROAD FROM THE H/O SHANKAR SEN TOWARDS THE H/O ASIT MODAK AT PURATAN CHAPRA UTTARPARA SANSAD-III S-CODE -89548820
Improvement of Black Top road from the H/O Nadu Sk to the H/O Entaj Sk. at Sangsad No. XI, Activity Code- 40261461/24-25
Construction of Black Top Road from Sahidul house to Ruhul house at Begumpur Sansad XIV JL No 09 under Begumpur Bibipur Gram Panchayat Activity ID 40066072
Imp. Of Black Top Road At Amratala Lane Under HCM
Const. of Bitumen Road Vasant Dada Home ,Khairenagar, Tal-Shirur
Providing and Laying BM/BC work on existing road near Outer Ring Road at RD 40680m to Khyala Bridge RD 41980m. (Right Bank).
Improvement of road by Black top at Subhashnagar from the h/o Vikram Chakroborty to Subhashnagar Kalimandir (Sansad-VII) (SAAP No-05/5th SFC/23-24) under Bhatjungla Gram Panchayat under 5th.SFC-Untied 2023-2024
Construction of Black Top Road from Saguna Hazratala to H/O Biswanath Pal at Saguna sansad no.- IV under Gayeshpur Gram Panchayat under Santipur Development Block, Nadia under 15th(untied) FC 2021-22. AAP-70
Improvement of Black Top road from Lo Samir Biswas towards the Kabarsthan at Durgapur Sansad XXVI(Old)/ XXVIII(New) (AAP-96/23-24) under Bhatjungla Gram Panchayat under 15TH.CFC-BG-U 2023-2024 (AC-67883638)
Stg of sijra road by pdg. Dense carpeting BM, BC and brick edging and interlocking tiles etc. from MCD Park to Surakhpur road in Ward 127/NGZ
Budget work 2018 19 Improvementsby providing BM and BC to Kolathu vayal paliyath valappu cherupanthottam vellikkeel kadavu road KM 4/000 to 7/600 Balance work
SLTF 2020-21 Providing BM and BC stripped works due to flood damages on Thirurkkad -Anakkayam road between km 0/000 - 2/850 in Mankada LAC
SLTF 2019 20 Surface rectification and providing BM and BC Works from Km 3/250 to Km 3/450 of Vengara Achanambalam road in Vengara LAC
GENERAL Improvement and providing BM and BC to Vadakumuri Thottumukam Road 0/000 to 1/8000 km in Ernad LAC in Ernad LAC General Civil Work
Renewal and improvement work by BM and BC in Champawat-Khetikhan section of State Highway No. 64 of Champawat district Under the Central Road Infrastructure Fund.
GENERAL Budget Work 2025 26 Providing BM and BC to Leading road to General hospital Pala from ch 0. 000 km to 0.550 km Budget Work
Construction of Mubarikpur Bye Pass Km 000 to 0400 SH Providing and laying GSBWMM BM and BC in Km 00 to 0400 against Temple Trust Deposit
SLTF-SLTF 2020-21 Improvements and providing BM and BC works to Irumbuzhi Melmuri road between KM 0/300 to 0/550 Work-General Civil work
PWD deposit - KIIFB - Improvement works and Providing BM and BC to Madathumchal Mukkootuthara Roads - Part I - Replacing pipe lines from St .Thomas Church To Novodaya Junction
Improvements and Providing BM and BC works to Tanur Railway station Oriyamkulam Road 0/000 to 0/400 in Tanur LAC, Malappuram Dist - providing street lights
SLTF 2018-19 - Providing BM and BC Works to Morayoor Edapparamba - Kizhisseri road between Km 1/700 to 2/050 in Malappuram LAC Of Malappuram district
GENERAL Budget 2022 23 Improvement by providing BM and BC to Palottupally Pariyaram Vembadi Kolari Nediyanjiram road ch 0/000 to 5/700 General Civil Work1
re-invite construction of BM and BC road Village Ghata entry to Government school near Peer Baba Mandir in Village Ghata Ward No 30 under MCG.
Re Tender GENERAL 2024 25 Providing BM and BC to Poochackal Ulavaip Road from Ch 1 700 to 3 350 in Aroor LAC General Civil Work
Road work in cludes provision for 36mm pothole filling WMM for strengthening BM and BC to the road Road marking and road safety items drain work
GENERAL NavaKerala Sadass 2024 25 Improvements to Gurunadhankulangara Kannanakuzhy Palackal road from ch 0 000 to 2 000 by providing BM and BC General Civil Work
Budget work 2020-21 Providing BM and BC to Vallamkulam Thottapuzha road km 0 00-3 818 and Nannoor Puthenparambilkadavu road Km 0 000 1 600
Non Plan 2020 21 IMPROVEMENTS WITH BM AND BC TO LINK ROAD CONNECTING PUTHIYANGADI MUTTOM VIA JAMAYATH HSS AMBEDKAR COLONY KM 0/00 TO 1/670
GENERAL Budget 2023 2024 Kondotty Melengadi Airport Road -Budget 2023 24 Improvements and providing BM and BC Works to Kondotty Melengadi Airport road General Civil Work
Retender Sabarimala Festival 2020 21 Improvements by Providing BM and BC to Chengannur Mahadevashetram Arattukadavu Road from Ch 0/000 to 0/600 in Chengannur LAC
FDR to Uran Sheva road MDR-03 km 0/00 to 1/600 in Streches Pot hole Filling by WBM, MPM, BM and BC Tal.Uran Dist.Raigad.
FDR to Uran Panvel road SH-103 km 0/00 to 2/400 in Streches Pot hole Filling by WBM, MPM, BM and BC Tal.Uran Dist.Raigad.
Strengthening of Road (P/L BM and BC work and Mastic work on Zonal Road No.-8 from Delhi/U.P. Bordar to M.P.-1 Road), Noida
Providing and Filling Trenches with Hot Mix Treatment of Roads Various Places in C And E WARD SLUM AREA
Construction of Bumper across different streets with BM, Premix Carpet, Seal Coat and other allied items in Action Area II, New Town Kolkata.