Loading…
Loading…
1,235 results • Best match
LAPCARE In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
LITSET In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
hp In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
LAPCARE In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
hp In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
hp In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
LAPCARE In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
LITSET In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
SAMSUNG In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
E-Beam Power Cable size 1.5 sq. mm for Diesel-Electric Locomotive, to PL No- 12330772. (Q3)
(i)Marching LHD and UDM from UG dep. panel (-) 3LS to 30LS proposed dep. panel, (ii) transportation of power cable (iii) laying of power cable (iv) transportation /carriage of steel structure and electrical equipment,
SUPPLY OF 11kV ALUMINIUM CONDUCTOR STEEL REINFORCED‘ DOG’ CONDUCTOR (Q3)
PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6539817 Dated : 17-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting 2/7
Replacement of damaged LT Cable between MRS and old Substation in non-technical area at SF Complex, Girola.
Replacement of damaged LT cable between pump house to Type-II distribution board at DRDO residential Complex, Jagdalpur.
Supplying and Fixing of heat shrinkable jointing kit 11KV XLPE cable straight joint of Sector F Mine at Rajnagar OCM, Hasdeo Area.
Material Code: W90318105160 POWER CABLE FOR 24V SOLENOID VALVE (ARMOURED) 4 X 2.5 MM2 SPEC: ST51020, Material Code: W90318105241 FS POWER CABLE FOR 24V SOLENOID VALVE (ARMOURED) 4X2.5 SQMM AS PER SPEC
Providing ,fixing, laying and commissioning of AB Cable at JMQ Colony, Departmental Colony and Miners Quarter (No.01 to 112) of Bishrampur Township.
SUPPLY OF CABLE TRAY FOR STP AT NMDC STEEL LIMITED
Provision of backup power cable and switch gear in the residential buildings of IIT Bhilai
power cable for direct burial xlpe ugac cable Experience with Government Required 11 Year (s)
power cable for direct burial xlpe ugac cable Experience with Gov. Required 2 Year (s)
power cable for direct burial xlpe ugac cable Experience with Government Required 2 Year (s)
power cable for direct burial xlpe ugac cable Experience with Government Required 1 Year (s)
power cable for direct burial xlpe ugac cable Experience with Gov. Required 2 Year (s)
power cable for direct burial xlpe ugac cable Experience with Government Required 2 Year (s)
Supply of Thin walled flexible elastomeric cable with copper conductors for working voltage above
Providing and fixing of motorized electric wire rope hoist at drive house of R3 belt conveyor of Back up of Gevra Project
Transportation, laying, charging of armoured cable Surface to from 25L substation to 63Dip/34L of 34LN LHCM panel in seam A at KurjaSheetaldhara UG Mine of Hasdeo Area
Transportation, laying and charging of armored cable and 02 nos. pump, motor and starter from surface to UG or old panel no. 12LS and 17LS to CM panel 27R dep. Distt. of 4A seam at Haldibari UG Mine.
Providing, laying and fixing of GI pipe for protection of load cell and track switch power cables at all Rail Weighbridges of KOCP.
Erection, reorganization, Dismantling, Shifting of HT Overhead line / HT Cable at Chhal OCM for a period of 01 year (365 days).
DOL starter (Q3), Overload Relay (Q3), modular electrical enclosure switch board boxes for modular type accessories (Q3), PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2), Time delay relay (Q3) (3 (3 ))
Replacement of faulty service cable at BTS station Sector 23 Nawa Raipur
power cable for direct burial xlpe ugac cable Average Turnover (Last 3 Years) 3 Lakh (s)
power cable for direct burial xlpe ugac cable Average Turnover (Last 3 Years) 3 Lakh (s)
power cable for direct burial xlpe ugac cable Average Turnover (Last 3 Years) 3 Lakh (s)
power cable for direct burial xlpe ugac cable Bidder Turnover (Last 3 Years) 2 Lakh (s)
Procurement of 50sqmm Copper Power cable of length 200 meter for Bhatapara Substation through GeM Portal
power cable for direct burial xlpe ugac cable Average Turnover (Last 3 Years) 4 Lakh (s)
Silicon Wrap Insulation Cover with Interlocking Sleeve for dog conductors 95/120 sq mm, 11 KV
(i) Erection of temporary stopping by old reject conveyor belt in -21Rise LHCM Panel (ii) Cleaning and removal of malma along Travelling roadway of -21Rise panel (iii) Transportation, laying, charging of armored cable from old dist. to new dist.
PVC Insulated Cables for Submersible Pumps - as per IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
PVC Insulated Cables for Submersible Pumps - as per IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
PVC Insulated Cables for Submersible Pumps - as per IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Electric Cabling Service - HT Cable Laying Removal & Jointing work for NSL at Nagarnar near Jagdalpur Chhattisgarh; As per tender; As per tender
(i) Erection of temporary stopping by old reject conveyor belt in -39Dip and 28LS LHCM Panel (ii) Cleaning , removal of malma along Travelling roadway of -39Dip and 28LS panel (iii) Transportation, laying, charging of armored cable from old dist. to
Hydraulic Conductor cutter (Q3)
Annealed Stranded Copper conductor
Custom Bid for Services - Laying of 11 KV HT XLPE Cable line at SRU Bhilai as mentioned at point no 2 Technical Specification of ATC