Loading…
Loading…
3,892 results • Best match
Supply-Erection--Strengthening of existing aged Kundah conductor -Jumpers and clamps in 230 KV Main Bus and 230 KV Feeders by new one at Muthiahpuram 230 KV Auto SS under PSDF-DPR-2 scheme
Erection of 110 KV DC line on DC towers with panther conductor for making LILO of theexisting Villupuram - Madhurapakkam feeder - I at the proposed Irumbai 110 KV SS. (Reach-4) (Loc No.21-27)
Erection of 110 KV DC line on DC MC towers with panther conductor from proposed Vellalaviduthi 400 KV SS to LILO Keeramangalam-Sethubavachatram 110 KV line and connecting Nagudy 110 KV SS (Reach-IV).
Erection of 110 KV DC line on DC MC towers with panther conductor from proposed Vellalaviduthi 400 KV SS to LILO Keeramangalam-Sethubavachatram 110 KV line and connecting Nagudy 110 KV SS (Reach-V).
Erection of 110 KV DC line on DC towers with panther conductor for making LILO of theexisting Villupuram - Madhurapakkam feeder - I at the proposed Irumbai 110 KV SS. (Reach-3) (Loc No.14-20)
Erection of 110 KV DC line on DC MC towers with panther conductor from proposed Vellalaviduthi 400 KV SS to LILO Keeramangalam-Sethubavachatram 110 KV line and connecting Nagudy 110 KV SS (Reach-I).
Erection of 110 KV DC line on DC MC towers with panther conductor from proposed Vellalaviduthi 400 KV SS to LILO Keeramangalam-Sethubavachatram 110 KV line and connecting Nagudy 110 KV SS (Reach-III).
Erection of 110 KV DC line on DC MC towers with panther conductor from proposed Vellalaviduthi 400 KV SS to LILO Keeramangalam-Sethubavachatram 110 KV line and connecting Nagudy 110 KV SS (Reach-II).
PVC CABLE 7/0.19mm BLACK Single core 7 strands flexible unsheathed in colour black, conforming to IRS.S.76/89 amendment No.2 or latest. The conductor shall be of tinned annealed high conductivity copp
CABLE TELEPHONE SWITCH BOARD 20 PAIRS COPPER CONDUCTOR, SIZE 0.49MM DIA, as per TEC Specification No. G/WIR-06/03/MARCH-2002 with latest Amendment. ACCEPTED MAKE :HAVELLS of 0.50 dia (warranty and te
Thermo Shrink Jointing Kit For Jointing Underground Quad Cable (0.9 mm Conductor Dia.) As per RDSO specification No:: IRS: TC 77/2012 (Rev.3.0) with (Amdt.-1 to 3)Suitable to 6 quad cable.
Inline splicing connector with lever suitable for all conductor type, Max 4 sq. mm nominal voltage 450 V, rated current 32 A, as per IEC / EN-60998, similar to Wago item No 221-2411.
Thermo shrink jointing kit for jointing underground quad cable (0.9mm conductor dia) as per RDSO Specification No. IRS: TC 77-2012 Rev. 3 with amendment 1,2 and 3 or latest ACCEPTED MAKE/BRAND: Trendb
MULTIMEDIA PROJECTOR, CEILING MOUNTED PROJECTOR STAND, HDMI CABLE, POWER CABLE, PROJECTOR SCREEN, VGA CABLE, CORDLESS MIKE ALONGWITH AMPLIFIER, SPEAKER, LAPTOP
Supply, Delivery of Power Pump, Panel Board, Power Cable and Non Return Valve at Kaveri Sandhu Borewell in Tirukoilur Municipality
MULTIMEDIA PROJECTOR, CEILING MOUNTED PROJECTOR STAND, HDMI CABLE, POWER CABLE, PROJECTOR SCREEN, VGA CABLE, CORDLESS MIKE ALONGWITH AMPLIFIER, SPEAKER, LAPTOP
CABLE ELECTRIC FLEXIBLE SINGLE CORE 1.5 SQMM (22/0.3 MM) ELECTRILYTIC GRADE 99.97% PURE COPPER DRAWN ( 5850 meter ), CABLE ELECTRIC FLEXIBLE SINGLE CORE 4.0 SQMM (56/0.3MM) ELECTROLYTIC GRADE 99.97% PURE BRIGHT ANNEAL ( 1800 meter ), CABLE ELECTRIC ... COPPER CONDUCTOR MULTI ... FLEXIBLE, PVC INSULATED A
Labour work contract for replacement of corroded pole,provision of guarding arrangement and replacement of aged conductors in Palladam division
E-tender with forward bidding (Tender cum auction) for Sale of 4 types of copper scrap from various stores of TANGEDCO along with immediate sale of 79.280 MT of Stranded Copper Dog conductor Scrap available at Coimbatore Region .
Supply, foundation, erection and stringing of panther conductor and 48 Fiber OPGW for LILO of 110 kV Thiruchuli - Muthuramalingapuram feeder I to the proposed Mudukkankulam 110 kV SS on Total turnkey basis.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6437445 Dated : 11-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6423680 Dated : 07-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6398316 Dated : 03-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6298866 Dated : 13-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate ... category XLPE Cable for ...
Renewal by providing synchronizing panel of 2 x 2030 KVA DG sets, Power cables and allied works at Tamil Nadu, Government Multi Super Speciality Hospital, Omandurar Government Estate, Chennai-2
Construction of New Kitchen for opal Mess at NIT, Trichy. SH: Building portion including water supply, sanitary installation, aluminium work, water proofing including Internal Electrical Installations, Lightning conductors, External service (MV Panel & UG Cabling), emergency light & illuminated signages, Solar Water Heater , RO Plant, Water coolers, Fire Fighting with down comer system, Manual Fire alarm system, Kitchen Ventilation system and external lighting.
Erection of 110 KV DC line on DC towers with panther conductor for making LILO of the existing Villupuram - Madhurapakkam feeder - I at the proposed Irumbai 110 KV SS. (Reach-2) (Loc No.7-13)
EXECUTION OF HT LINK LINE BETWEEN 22KV PERUR AND 22KV KG MILL FEEDER AND STRENGTHENING OF CONDUCTOR IN 22KV KG MILL FEEDER OF 110/33-22KV MADHAMPATTY SS IN PERUR SUB DIVISION OF S.N.PALAYAM DIVISION
Erection of 110 KV SC line on DC tower (17KM) with Panther conductor from existing Thuvakudy 230kV SS to K.Sathanur 110 kV SS with supply of all materials.(Loc 1 to 82, 86 to 87) .
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING REPLACEMENT OF DBs, MCBs, MCCBs, CONVERSION OF CONVENTIONAL LIGHTS INTO ENERGY SAVING LED LIGHTS AND MAINTENANCE OF LIGHTING ARRESTERS, LIGHT CONDUCTOR, AVIATION LIGHTS AND EARTHING AT ZONE C (INS PALLAVA
Works Contract carry out the replacment of conductor and provision of DP switch and Provision of DP structure at mettukkadai 110/22 KV SS in Thindal section, West Erode sub division of Urban Erode division.
SEMI CONDUCTOR FAST ACTING FUSE, RATING 1000/1250 VOLTS, 1450 AMPS FOR BG AC EMU MAIN RECTIFIER UNIT CONFIRMING TO SPECIFICATION ICF/ELEC/021 REV. "A" CLAUSE 6.5 SIMILAR TO BUSSMAN TYPE MATCHED PAIR O
SEMI CONDUCTOR FAST ACTING FUSE, RATING 1000/1250 VOLTS, 1450 AMPS FOR BG AC EMU MAIN RECTIFIER UNIT CONFIRMING TO SPECIFICATION ICF/ELEC/021 REV. "A" CLAUSE 6.5 SIMILAR TO BUSSMAN TYPE MATCHED PAIR O
Supply and layout of XLPE Aluminum 4 core 35 sq mm cable 1100 V AC Aluminum Conductor conforming to IS:8130:1984., with all accessories for Main frame Slider operation with trenching and termination a
part 261-202 WAGO 4 conductor terminal strip: without push buttons: with fixing flanges: 2-pole: for screw or similar mounting types: fixing hole 3.2mm dia;2.5 sq. mm,cage clamp :2.5 sq. mm:Grey .Note
Supply of thermo shrink jointing kit for jointing of underground quad cable (0.9 mm conductor dia) as per RDSO Specification No. IRS:TC:77-2012(Rev-3) with Amdt.1 & 2 or latest. Inspection by RDS
SINGLE CORE 16 STRANDS FLEXIBLE UNSHEATHED PVC CABLE OF NOMINAL CROSS SECTIONAL AREA 0.5SQ.MM AND IN COLOUR RED, CONFORMING TO IRS.S.76/89 AMENDMENT NO.2 OR LATEST. THE CONDUCTOR SHALL BE OF TINNED A
Coil for Lock Coil Assembly to Drg.No. WM 106/85 Alt-3 for DLBInstrument. Winding shall be made out of copper round enamelled0.376mm nominal conductor diameter (28 SWG) to IS: 13730 part-34,Gr.2.
Supply of Broadband Outdoor AP, Supply of Broadband Outdoor CPE, Supply of 2MP IP PTZ Dome Camera, Supply of 2MP IP Bullet Camera, Supply of 32 Channel NVR, Supply of High End Workstation Computer, Supply of 4 Port POE Industrial Grade Managed ... UTP Armored Cable , ... Armored Power Cable , ...
Supply and Erection of C.I.Encasing pipe 200mm Dia to lay 11KV XLPE UG power Cable for Railway Xing at aeomwkarur section
ITEM 1450 kV X-ray Tube NDI -451 - Be Make- Varex Imaging as technical specification annexure attach, ITEM 2 - 225 kV HT cable as technical specification annexure attached
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6471159 Dated : 19-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6599089 Dated : 22-08-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6469028 Dated : 18-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6666626 Dated : 11-09-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 155000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6589517 Dated : 20-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6003221 Dated : 15-03-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference Yes Reserved for MSE Reserved for MSE Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
35 4 Core Aluminium cable, 10 SWG GI earth wire, 4Sq mm Copper Wire, 2 5Sq mm Copper Wire, 1 5Sq mm Copper Wire, 20 Amps A C Box, 15 Amps Switch Socket With Box, 5 Amps switch Roma, 5 Amps Socket Roma, 8 Module Box Roma, 8 Module Front Plate Roma, 3 4 PVC Pipe, 3 4 bend, 3 4 3 Way Junction Box, 1 inch Screw, 3 4 GI Clamp, 3 Phase 4 Way D B, 63 Amps 4 pole Mcb, 20 Amps Single Pole Mcb, 16 Amps Single Pole Mcb, 35 Sq mm Cable Gland, 35 Sq mm Socket, Insulation Tape, Cable tie 300MM, 6 Module Box Roma, 6 Module Box Plate
Running Contract for Replacement of Corroded Pole,Aged Conductor Replacement,Guarding Provision, Re Sagging of OH Line, Set Right of Leaned Pole, Stay Cut Renewal,Insertion of Poles and Tree Clearance In Mayiladuthurai Town Sub division