Loading…
Loading…
3,892 results • Best match
4nos DP and puthukulam SS3 and vallakulam ss3 andarivanmolifeederstrengthening conductor in Rsvkm
11 KV , 36KN Strain Disc Hardwares suitable for Dog and Raccoon conductor
Work contract on Distribution works for erection / dismantling of Distribution Transformers, pillar,poles, structure, laying of HT and LT cable , Stringing of OH line, re sagging, strengthening and allied works etc, including painting , re sag
WELDING GOGGLES PLANE, ELECTRODE HOLDER 600 AMPS, WELDING HOSE CONNECTION, WELDING HOSE ACETYLENE NON RETURNABLE, HAND GLOVES MAKE SENTILITE, WELDING COPPER CABLE 400 A, GAS HOSE BLACK E SAB, GAS HOSE RED E SAB, BIB COCK 2 WAY
1 Improvement estimate for strengthening of existing ACSR 7 2 11 ACSR 7 2 59 and ACSR 7 3 35 to ACSR 7 4 09 conductor in location in Ponmanai ABSwitch III to Pillathoor SS 100 KVA in 11 KV Thiruvattar Feeder under Kulasekhram Urban section
Works contract for execution of Imp estimate for Strengthening ACSR 7/2.59 into ACSR 7/3.35 in Verivilai SS III 100KVA, Conductor LT line 7/2.11 into 7/2.59 and insertion of 8 mtr pole and 9 mtr pole in CI Pudhukadai section under Kuzhithurai Dn
Imp Estimate for LT aged conductor ACSR 7 2 59 and ACSR 7 3 35 into ACSR 7 3 35 in existing kurumpani ss 1X 63 KVA in 11 KV palapallam under chemponvilai section Various works section in in various Eraniel c and I section Thuckalay division
Construction of Girsls hostel (Gplus1) along with site development including internal water suply, sanitary installation, external service connection, underground sump, internal roads, footpath, external sewerage, storm water drain, rain water ... lightning conductors , ...
Construction of 6 nos of 80 seater class rooms (3 nos of blocks each with G plus 1 floor) including corridors to be connected to existing academic block and fire escape stairs at IIM, Trichy SH: Building portion including furniture, internal ... lightning conductors ,external ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6337245 Dated : 16-06-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority BUREAU VERITAS INDIA PRIVATE LIMITED Quality Assurance Plan document 1750070524.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : EXECUTIVE DIRECTER Material Management Complex, NLC India Limited, Neyveli (Unit Head) Splitting
Supply of 3C x 35 sq. mm Armoured XLPE insulated Aluminium cable of voltage grade 650/1100 V as per a, Supply of 3C x 95 sq. mm Armoured XLPE insulated Aluminium cable of voltage grade 650/1100 V as per a, Supply of 3C x 2.5 sq. mm Armoured XLPE ... insulated Copper cable of ... insulated Copper cable of ...
Supply and erection of EB Switch Box Implementation of metallic powdered coated EB Switch box with 63A MCB 63A Fuse Carrier Removing of Existing wire and Provide 4sq mm 3 Core copper cable must Handover the old switch Box
Supply and erection of EB Switch Box. Implementation of metallic powdered coated EB Switch box with 63A MCB, 63A Fuse Carrier. Removing of Existing wire and Provide 4sq mm 3-Core copper cable must Handover the old switch Box
Strengthening of existing 110 kV Pudhanchandai - Rasipuram SC line on SC tower with leopard conductor into 110 kV SC line on DC tower with Panther conductor between Location Nos. 04 to 59.
TO PROVIDE DRIVER AND CONDUCTOR TO OPERATE BUSES BELONGING TO TNSTC COIMBATORE REGION
Supply of 11KV 30KN Strain disc hardware (Suitable for Rabbit and weasel conductor)
Supply of iron and steel materials, fabrication, erection of structure, erection of earth raisers, erection of equipments, laying of control cable etc., for establishment of 230/110KV SS at existing 110 KV vembakkam SS Premises.
Works contract for Erection dismantling of DT, Structure, Pillar, Laying of HT LT cable, Maintenance of DT, pillar etc., and cable fault rectification works towards improvement, extension, DCW works and allied works in respect of Esplanade section
Imp Esti for strengthening of existing ACSR 7 2 11 ACSR 7 2 59 Conductor ACSR 7 259 ACSR 7 3 35conductor in Location of Kavu vilai SS 100KVA Ittagaveli SS 100KVA and Pottai kulam SS 100 KVA Under KLM Urban section under C I TKY section in TKY
1 IMP estimate for strengthening of existing LT conductor ACSR 7 2 11 and ACSR 7 2 59 into ACSR 7 3 35 at Thennaivilai SS 100 Kva under Thickanamcode section 2 Eos to 1 no III B INDL sc to Thiru Ganadhas at Vettukuzhi various works various section
6 sq.mm conductor through terminal block to 282-681 of WAGO or equivalent make- 12 nos. (b). 6 sq.mm jumper( link) to 282-402 of WAGO or equivalent make -06 nos (c). 6 sq.mm endplate to 282-308 of WAGO or equivalent make- 04nos suitable for LWLRRM coaches.
Execution of UG cable Trenchless method work for Laying of 3 400 sqmm HT cable 2 run for shifting of existing 33 KV Kalipalayam feeder OH line at KM 460 11 13 SMR Railway track crossing in Tn SMR Section
Supply, fabrication erection of steel structure, erection of eqipments, supply erection of earth raisers, laying of control cable, end termination etc., for 3 Nos of 11 KV Outdoor VCB in the premises of existing SIDCO Ambattur
E tender for Supply, Erection, Testing AND Commissioning of 2.04 Km length of 3 X 95 1 X 95 SQ mm HT AB CABLE With all accessories for Erection of New Link Line for Load Bifurcation from Existing 11 KV Denkanikottai Town Feeder to Newly Proposed
Item -1 177 cm Ultra HD 4K LED smart google Display Branded, Item -2 177 cm Ultra HD 4K LED smart google Display Branded, HDMI, Power Cable, Wall Mount Kit, Installation Charges
MTPS-I ES Circle EM-II SD II CWPH -Disconnection connection of power cables star point for measuring DC resistance and IR value dismantling and assembling of Fan cover, fan grill for applying grease and cleaning of 3 Nos. 1175 KW, CWP HT motors
Patratu FGD Power Cables Variant 01, Variant 02, Variant 03, Variant 04, Variant 05, Variant 06, Variant 07, Variant 08, Variant 09, Variant 10, Variant 11, Variant 12, Variant 13, Variant 14, Variant 15, Variant 16, Variant 17, Variant 18, Variant 19, Variant 20
MTPS-I ES EMII SD-II CWPH -Disconnection connection of power cables star point for measuring DC resistance and IR value, dismantling and assembling of Fan cover, fan grill for applying grease and cleaning of 9 Nos, 1175KW, CWP HT motors of Unit-I
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), Molded Case Circuit Breakers (MCCB) as ... (Q2), PVC Insulated Copper Cable Single ... Flexible Conductor (V2) ...
PVC Flat Cable, Copper conductor with PVC Insulation and sheath as per IS:694
PVC Flat Cable, Aluminium conductor with PVC Insulation and sheath as per IS: 694
Supply, Installation and Commissioning of 4-line Shrouded Conductor DSL System for EOT Cranes
supply of 11 KV , 30KN Strain Disc Hardwares suitable for Rabbit and Weasel conductor.
Replacement of aged 7/3.15 AAAC by strenthing of 7/4.09ACSR from Arumuganeri SS to loc. 92 in 11KV Sahupuram feeder of Arumuganeri substation.improvement estimate KPTMSS 16/250KVA andKPTM SS28/250 over loading proposed 4nos. 63KVA single pole DT
As in specification
Supply of 4 Megapixel outdoor Colour Bullet PoE Camera with camera mount and all accessories, Supply of 4 Megapixel outdoor Colour PTZ PoE Camera with camera mount and all accessories, Supply of P2P RF Link Antenna Set Tx and Rx Set, Supply of 16 ... multi-strand PVC insulated PVC ... copper conductor Power Cable , ...
Imp estimate for strengthening of conductor in HT line ACSR 7 3 35 and ACSR 7 2 59 change into ACSR 7 4 09 from Karikkadu SS II 100 KVA to Vanniyoor SS III 100 KVA in 11 KVA Palugal Feeder under Kaliyakkavilai Distribution Section C and I PKD in Ku
SPL REPAIR TO BLDG NO D-10 (JCOs LIVING) OF 18 MADRAS AT DALAPCHAND AND SPL REAPIRS TO BLDG NO P-9 AND PROVN OF 03 X LIGHTENING CONDUCTOR FOR 1ST BN SIKKIM SCOUTS AT ALGARAH AND PROVN OF FALSE CEILING FOR BLDG NO P-278 AT STN HQ PEDONG MI
5T EOH ASSEMBLY INCL ACCESSORIES, SWITCH FUSE UNIT 3 HRC FUSE, TRAILING FLEX. COPPER CABLE, GALVANISED LINK CHAIN, CABLE TROLLEY ASSEMBLY, AUXILIARY GIRDER FOR CT CABLE, RAIN HOOD FOR MOTORS, AND CB, GREASE GUN WITH GREASE, 10 Percent SPARE LUB, FOR HOIST
Drilling of New 150mm dia bore well , Supply and delivery of submersible pump set , Panel board , UG/LT Cable, 160MM PVC Pipe line , 40mm GI Specials ,Motor Interconnection work and Bore well Prodution at Annaimadu in Minjur Town Panchayat
Drilling of New 150mm dia bore well , Supply and delivery of submersible pump set , Panel board , UG/LT Cable, 160MM PVC Pipe line , 40mm GI Specials ,Motor Interconnection work and Bore well Prodution at Annaimadu in Minjur Town Panchayat
Drilling of New 150mm dia bore well , Supply and delivery of submersible pump set , Panel board , UG/LT Cable, 110MM PVC Pipe line , 40mm GI Specials ,Motor Interconnection work and Bore well Prodution at Annaimadu in Minjur Town Panchayat
Drilling of New 150mm dia bore well , Supply and delivery of submersible pump set , Panel board , UG/LT Cable, 110MM PVC Pipe line , 40mm GI Specials ,Motor Interconnection work and Bore well Prodution at Annaimadu in Minjur Town Panchayat
Drilling of New 150mm dia bore well Supply and delivery of submersible pump set Panel board UG/LT Cable 110MM PVC Pipe line 40mm GI Specials Motor Interconnection work and Bore well Prodution at Annaimadu in Minjur Town Panchayat
TGMCA Division Load testing of 4510 Ton EOT crane at Cooling Water Pump House10 Ton EOT Crane at Central Stores 5 Ton Underslung Crane at CT makeup Pump House 3 Ton Electric Wire Rope Hoist EWRH at Chlorination plant 3 Ton EWRH for CCW p
Conventional Lightening Arrestor, Multi stranded Copper wire, Frangible Fiber Reinforced Plastic, Concrete base for erecting poles, Brazing Points, Installation work, Fabrication of four Concrete Bases, Installation of four FRP poles, Installation of Four Franklin Rods, Laying of insulated single core, Warranty, Copper purity Certificate from NABL certified Laboratory
Supply Towers, Panther conductor, Line materials Labour charges for Stub setting, Concreting, Erection, Stringing of ACSR Panther conductor, Earth wire for making LILO of S.P.Koil - Siruseri feeder at Proposed Nedungundaram from Loc 11 to Loc 20
Supply of monopoles , Panther conductor, Line materials Labour charges for Stub setting, Concreting, Erection, Stringing of ACSR Panther conductor, Earth wire for making LILO of S.P.Koil - Siruseri feeder at Proposed Nedungundaram from Loc 20 to 25
Supply Towers, Panther conductor, Line materials Labour charges for Stub setting, Concreting, Erection, Stringing of ACSR Panther conductor, Earth wire for making LILO of S.P.Koil - Siruseri feeder at Proposed Nedungundaram from Loc 1 to Loc 11
Reconductoring package OH03 for Reconductoring of Pugalur-Madurai 400 kV D/C lines with twin HTLS conductor (Capacity2100 MVA) associated with Reconductoring of Tirunelveli-Udumalpet and Pugalur-Madurai 400 kV D/C lines with HTLS conductor.