Loading…
Loading…
11,283 results • Best match
S/F of 20 Nos. 7.00 mtr. Long S.T. Pole alongwith 10 sqmm 2 core armoured Cable, LED Street Light Fitting, Doublearm Bracket, Automatic Switches etc. at Dalel Purwa Chauraha to iftikharabad Bank of Baroda Dalel Purwa, Ward-83, Zone-01, Kanpur.
S/F of 25 Nos. 7.00 mtr. Long New S.T. Pole alongwith 10 sqmm 2 core armoured Cable, Automatic Switches and 135 Nos. 18.00 Mtr. LED Warm White Strip Light etc. at Different Place of Barra Poorvi, Ward-77, Zone-03, Kanpur.
S/F of 20 Nos. 7.00 mtr. Long S.T. Pole alongwith 10 sqmm 2 core armoured Cable, LED Street Light Fitting, Doublearm Bracket, Automatic Switches etc. at Tukaniya Purwa Chauraha to Bansmandi Chauraha (Alam Market Road) Dalel Purwa, Ward-83, Zone-01, K
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7145356 Dated : 23-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
REPAIR / MAINT OF LT DISTRIBUTION SYSTEM AND LT CABLE, MISC WORK AND REPAIR/REPLACEMENT OF TRANSFORMER INCL DEHYDRATION, ETC. IMPROVEMENT TO MES INSTALLATION AT RTS HEMPUR UNDER GE (EAST) BAREILLY.
Construction of Trench Works for Power Cable from 250 KVA Station Transformer to New Extended Control Room Building at 132 KV S/s Gangoh Distt. Saharanpur
Replacement of gear box of cooling tower no. 3 and GI filling line and power cable for cooling towers in IWD central AC plant IIT Kanpur
Replacement of Damaged and Wooden pole, Jurjar Conductor and Resagging of loose conductor in place of Narayanpur Feeder of 33/11 KV Sub-Station Rasoolabad under Jurisdiction of Electricity Distribution Division-IInd, Faizabad
Reconducting of 33 KV line Oswal from old Jarjer conductor to ACSR Dog Conductor from 132 33 Ss Khalilabad to 33 11 Ss Industrial Khalilabad Santkabirnagar
ERECTION WORK FOR REPLACEMENT OF OLD DOG CONDUCTOR LINE WITH NEW ACSR PANTHER CONDUCTOR LINE ON 132 KV AZAMGARH(220 KV)-SIDHARI LINE UNDER ETD, AZAMGARH.
Replacement of jarjar Weasel conductor to new ACSR Dog conductor in 11 KV Line Dhanari Fdr Existing from 33/11 KV Substation Gunnaur, under EDD-Babrala
Replacement of old and Jar-jar Weasal Conductor to Rabit conductor of 11 KV Industrial Feeder of 33/11 KV S/S Bagahiya under EDD-Khalilabad
REPLACEMENT OF OLD and PARTIAL DAMAGED SINGLE MOOSE CONDUCTOR 132KV MAIN BUS WITH TWIN MOOSE CONDUCTOR AT 132KV S/S NATH NAGAR, UNDER ETD-I BASTI.
Replacement of Old and Damaged Weasel Conductor to New Dog Conductor in the area of Ring Road Substation of EUDD Harrisganj under EUDC-III KESCo Kanpur
Replacement of Bare Neutral Conductor from Arial Bunch Conductor in Shivalik Enclave, Indira Nagar, Lucknow against Sanctioned Business Plan Package No. 371/SI/CE/17-2018
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MODIFICATION OF 132 KV TBC BAY AS 132 KV LINE BAY AND RE-CONSTRUCTION OF 132 KV TBC BAY THROUGH 132 KV XLPE CABLE AT 132 KV S/S KAITHI UNDER ELECTRICITY TRANSMISSION DIVISION-I, VARANASI
Under the Business Plan year 2023-24 in EDD-Ist, Chandauli the work of converting single cable of 33KV collectorate feeder emanating from 33x300mm2 XLPE Cable 132 33 Electricity Distribution Sub-Station-Chandauli into double cable.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Work of 11KV protection and other miscellaneous works (work of dubling undergriund cable, XLPE Cable, replacing of wooden x-arm. etc.) on semi turn-key basis under B.P. 2025-26 in the area of EDD-Sakaldiha.
Supply of various size Heat Shrinkable cable Jointing Kit (Indoor, Outdoor) and Straight Through for 33 KV, 11 KV XLPE cable in the area of EE, EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
Road Cutting Restoration backfilling for Supply laying termination and commissioning of 300sq mm 3 core XLPE cable 260mtr in HDPE duct and dismantling of 33 KV HT Over Head line in Bhelupur water works campus Varanasi
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
CA NO CWE BLY GE E 61 OF 2025 2026 REPAIR REPLACEMENT OF VCB TROLLY BATTERY BANK ISOLATOR HT XLPE CABLE and MISC ITEMS AT 33 11 KVA MRS AT SHAHJAHANPUR CANTT UNDER GE EAST BAREILLY
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No