Loading…
Loading…
11,284 results • Best match
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER, INSTALATION OF NEW TRANSFORMER, BIFRECATION OF 11 KV FEEDER, LAYING OF 11 KV XLPE CABLE, RECONDUCTRING OF ABC LT LINE, SHIFTINGH OF 11 KV LINE/POLE FROM GARDEN TO ROAD
For Replacement of Damaged Underground 33 KV XLPE Cable Along with Filling of 33 KV XLPE Straight Through and Outdoor Type Heat Shrinkable Jointing Kits Along with Miscellaneous Associated Works in the Area of EUDSD-VI, Meerut, Under EUDD-III, Meerut
Strengthening of power supply with replacement of old punctured PILCA cable with XLPE cable from Bldg no. 125 MRS Substation to Bldg no. 131 Jheel Side Substation and Bldg no. 125 MRS Substation to Bldg no. 115 Substation in OFC
Shifting of 11KV XLPE cable from 33/11 KV Sub Station New Alambagh-I to 33/11 KV Sub Station New Alambagh II,at Singar Nagar Feeder and Chitragupt Nagar Feeder in the area of Alambagh under E.E.EUDD-Alambagh,LESA, Lucknow.
For Bifurcation of 11 KV Ram Nagar and Sarfarazganj Feeder by laying 11KV , 3x185Sqmm XLPE Cable from S/S Azad Nagar to Yaseenganj and S/S Balaghat to Sarfarazganj Chauraha under the area of EUDD (Thakurganj) LESA (Cis-Gomti) Lucknow
Construction of HT / LT line and Installation of 63 KVA T/F for gram Barobra Khurd and Replacement of damaged 33 KV XLPE cable for Dhimsree line Railway Crossing to give proper electric supply to the consumer under EDD-III Fatehabad
Replacement of damaged 11 KV XLPE Cable for attending break-down, emanating from 11 KV Feeder No. 2 of 33/11 KV Sub-Station Lal Kuan-2 in the area of SDO-2 under the jurisdiction of EUDD-5, Ghaziabad
LED Batten (Q2), Elecric Bells and Accessories as per IS 2268 (Q3), Non - Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), Piano Type Non Modular Domestic Electrical sockets - IS 1293 (Q3), Piano Type Non Modular Electrical Switch ... (Q3), PVC Insulated Copper Cable Single ... Flexible Conductor (V2) ... PVC Copper Cable Single ... Flexible Conductor (V2) ... (Q2), XLPE Cable for ...
WORK OF SHIFTING AND ERECTION OF ACDB PANEL AND RE-ROUTING OF POWER CABLE AFTER EXTRACTION FROM CONTROL CABLE GALLARY AND OTHER ASSOCIATED WORK AT 132 KV S/S KASIA UNDER ETD-I , GORAKHPUR
REPLACEMENT OF DAMAGE POLE AND CONDUCTOR IN BUSINESS PLAN HEAD AT VILLAGE-BAMNA TO RAKAULI, KHUTAHNA AND KHUTBHAR, BLOCK- KHAJNI, GORAKHPUR UNDER EDD-II, GORAKHPUR.
After damage of 11 KV and 33 KV XLPE Cable laying of new 11 KV and 33 KV XLPE cable properly under EDD Deoband
1 YEAR RATE CONTRACT FOR SUPPLY OF NOMEX ENAMELLED COPPER CONDUCTOR AS PER TENDER DOCUMENTS
CHANGED TO DAMAGED XLPE CABLE 33/11 KV KAILASHPUR
Transfer work by underground 11KV XLPE/LT XLPE cable.
work for underground xlpe cable under eudd I sre
Various work of XLPE CABLE in area EDSD Kailashpur
LT XLPE Cable Al. 1 core 630 sq.mm un_armoured
Supply and work for replacement of Single Moose Conductor with twin Moose Conductor of 132KV Main Bus-Bar I and II installed at 220KV Sub-Station, Basti under ETD-I, Basti.
WORK OF REPLACEMENT OF OLD SINGLE PANTHER CONDUCTOR BY TWIN PANTHER CONDUCTOR OF 132 KV GIDA AND 132 KV BARHALGANJ FEEDER BAY AT 220 KV SUBSTATION BARAHUWA UNDER ETD-II, GORAKHPUR
Copper Non Insulated Ring type Brazed Seam Terminals without Insulation for solderless Crimping to Copper Conductor as per following details: i) Conductor Size: 16sq.mm ii) Stud hole dia: phi 10.2mm i
REPAIR REPLACEMENT OF OLD UNSERVICEABLE LT HT CABLE INCLUDING REWINDING OF TRANSFORMER AND REPLACEMENT OF OLD TRANSFORMER OIL AND OTHER CONNECTED WORKS AT ADRDE AGRA AND REPAIR/ REPLACEMENT OF OLD UNSERVICEABLE STREET LIGHT FITTING,FLOOD LIGHT HIGH
REPAIR AND MAINT OF HT OH LINE, UG CABLE, EARTHING, HT CABLE JOINT, INSULATOR, LIGHTENING ARRESTER AND ALLIED WORKS IN NORTH AREA AND BHAGAT LINE AREA UNDER AGE E/M (E/S) AT GE (U) MEERUT CANTT
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2), Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), LED Batten (Q2), Isolator switch (Q3), Light emitting diode driver (Q4), PTMT Tap Fitting (Q3), Toilet Seat Covers (V2) (Q4), Towel Rail/Ring/Rack/Hooks for Bathroom (Q3), European Pattern Toilet Seat Vitreous China (Q3), Spray Headers without nozzles (Q4), Pillar Taps (V2) as per IS 1795 (Q3), Metal Alloy Casting Water Tap with Aerator (V2) (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) (3 (3 ))
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2), Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2), Isolator Switch (Switch Disconnector) Conforming To IS/IEC 60947 (Part 3) (Q3), Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2), Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2), Modular Piano Type Domestic Fan Regulator Conforming To IS 11037 (Q3), modular electrical enclosure switch board boxes for modular type accessories (Q3), Ceiling rose - IS 371 (Q3), Tower Bolts (Ferrous Metals) as per IS 204 (Q3) (3 (3 ))
Interconnection of 33KV Main Bus Bars of 220KV S.A.S. Sub station Pilibhit and 132KV A.I.S. Substation Pilibhit by 3 No. 33KV 3x400 mm2 size XLPE Power Cables (including 1 No. spare Cable) alongwith other associated works under E.T.D.-II, Bareilly
Routine up keeping and electrical maintenance of LT power cables, cable galleries at zero meter 10-meter elevation with their racks at Boiler, Turbine and BOP area of 2x210 MW and Switchyard of 2x210 MW 2X110 MW BTPS PTPP, Parichha, Jhansi.
VCB or control cable work
Supply and operating of 63 KVA, three phase diesal generator set on rental basis including competent operator and also three phase connection with 35sqmm. Copper cable approximate length 10 mt. at the various location of Saharanpur urban area.
CABLE HEAD TERMINATION SYSTEM WITH VERTICAL RECEPTACLE FOR 25 KV AC LOCOMOTIVE TRANSFORMER HAVING 120 SQ.mm, 45KV XLPE COPPER CABLE ITEM NO. 01 TO 13 AND 15 TO 21 IN A SET AS PER RDSO SKETCH NO. SKEL
Heavy Duty Copper tubular crimping Socket for 70 Sq. mm E Beam Copper cable to RCF Spec No .EDTS-200-Rev-Nil ,Amdt -2 Correction -3 Table-1 ,Item-7 .Make-As per Approved Vendor directory . Make/Brand
The work plan of Rs. 20.00 cr. allocated for the system strengthening work under Additional BP 2023-24 in EDD-I, Chandauli, the work of replacing the dilapidated AB cable dilapidated wire installed on the LT line. on semi turn-key basis
Under the additional BP 2023-24 in EDD-I, Chandauli, under the work plan of Rs.20.00 crore allocated for system strengthening work, 11KV line construction work strengthening and LT line dilapidated AB cable/wire will be done. on semi turn-key basis
Replacement of ACSR conducter by New AB Cable of LT Line in HARTOLI 100 KVA, NAITHLA PULLIA WALI DP 250 KVA, SUNHERA 63 KVA BAMBE WALI DP, GANGERA BALMIK BASTI 100 KVA T/F IN S / s Walipura, Under EDD-II, Bulandshahr
Providing and laying of aluminium conductor P.V.C. sheated 3x400mm2 of at Bhaisa PC
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Laying ABC Conductor in Preet Vihar Colony in area of EDD-I Hapur
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
HMI Controlled Tensile Testing Machine 50KN for ALuminium Conductor as per IS 14255.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.
Repairing of Broken and Damaged Poles and Conductor of ST and LT Line.