Loading…
Loading…
7,071 results • Best match
0.5 SQ. MM. X 4 PAIR SIGNAL CABLE, CONDUCTOR: SILVER PLATED COPPER INSULATION: PTFE
SITC of Lightning Conductor at Ibrahimpur Govt RHE and WWH Total Blocks 11 nos.
Manufacture, testing, supply and delivery of Composite Hardware Fittings for ACSR Weasel,Rabbit Conductor
SITC of Lightning Conductor at Baruipur Govt RHE B C D Type 6 nos.
SITC of Lightning Conductor at 28/1 Gariahat Road Govt. Housing Ladies Hostel- 1no
Store Shelter with Pre fabricated Structure, Distribution box 8 way SPN 240 volts copper bus bar and neutral link earthing stud, MCB SPN 240 Volts 63 Amps, MCB SP 6 to 32 Amps, PVC tape 19mm wide 5 m long, Cable PVC insulated electric cables heavy ... Cable PVC insulated electric ... Cable PVC insulated electric ... Volts, Service cable PVC insulated aluminium ... aluminium conductor 1100 ... copper conductor multi ...
A ) Loco Cleaning. B) Provision of perforated Aluminium Sheet as roof ceiling in Driving Cabs. C ) Polymerized flooring of Driving cabs. D) Cleaning of TFP Tank & other accessories, Air blowing of SL, SJ & ATFEX etc. E) Removal of all Auxiliary, ... & Power Cables & ...
ERECTION TESTING COMMISSIONING OF EARTH MAT SUBSTATION STRUCTURE SUB STATION EQUIPMENTS LAYING OF POWER CONTROL CABLE OTHER ALLIED WORKS FOR THE PROPOSED 33 11 KV NEW SUBSTATION AT KANKI UNDER ISLAMPUR DIVISION IN THE DISTRICT OF UD
Servicing and testing of 3 Nos outgoing 6 KV HT VCU Supplying and laying of Power (11 KV HT ) and Control Cable and installation of Area Lighting with LED Fitting with allied works under Howrah Municipal Area
INSTALLATION OF POWER EQUIPMENT WITH CONSTRUCTION OF SUPPORT STRUCTURES AND LAYING OF CONTROL CABLE AT SWITCHYARD AND CONTROL ROOM AT MURAGACHA 33 11 KV SUBSTATION UNDER TEHATTA (D) DIVISION IN THE DISTRICT OF NADIA UNDER DDUGJY SCHEME.
Providing lightning conductor protection for residential buildings of Type-I (B, C and D Block) and Type-II (H and I Block)) of 47 BN BSF (BN HQ Gandhinagar-II) and Type-I (D, E and F Block) and Type-II (Arjun and Bhim Block) of 75 BN BSF
Supply & testing of 4 Core, 50 sq mm, LT power AL cable, XLPE insulated, cores laid up, PVC innersheathed, armoured aluminium stranded conductor, extruded PVC Type ST2 outer sheathed, 650/1100 V Grade As Per IS 7098 (Part 1) 1988 or latest as per instruction of Engineer incharge at site.
Supply & testing of 4 Core, 70 sq mm, LT power AL cable, XLPE insulated, cores laid up, PVC innersheathed, armoured aluminium stranded conductor, extruded PVC Type ST2 outer sheathed, 650/1100 V Grade As Per IS 7098 (Part 1) 1988 or latest as per instruction of Engineer incharge at site.
Supply & testing of 4 Core, 120 sq mm, LT power AL cable, XLPE insulated, cores laid up, PVC innersheathed, armoured aluminium stranded conductor, extruded PVC Type ST2 outer sheathed, 650/1100 V Grade As Per IS 7098 (Part 1) 1988 or latest as per instruction of Engineer incharge at site.
Supply & testing of 4 Core, 70 sq mm, LT power AL cable, XLPE insulated, cores laid up, PVC innersheathed, armoured aluminium stranded conductor, extruded PVC Type ST2 outer sheathed, 650/1100 V Grade As Per IS 7098 (Part 1) 1988 or latest as per instruction of Engineer incharge at site.
Lamp 12 Watt LED Brand Type Unbranded, Street Light LED 72W Brand Type Unbranded, MCB 2 Pole With 2PP C Type 40 A. Brand Type Unbranded, 1.5 Sqm 3 Core PVC Copper Cable Brand Type Unbranded, Bib Cock CP 15mm Brand Type Unbranded
FLAT SUBMERSIBLE CABLE 3CORE 6 SQMM, FLAT SUBMERSIBLE CABLE 3CORE 10 SQMM, TWIN CORE COPPER CABLE FR 0.75 SQMM, ALTASAN AQUA FOR SWIMMING POOL, COPPER SULPHATE, TCCA 90 GRANULAR FOR SWIMMING POOL, PIANO HINGES 6" LONG 20MM S/S, BIB COCK CI 15MM
Replacement of power cable for Augmentation works for Aguri Band Punisol and its adjoining Mouzas Water Supply Scheme (Zone- D) under Onda Block (BRGF Ph - I Project). under Bankura Mechanical Division, P.H.E. Dte
Supply delivery and relaying of L.T power cable with allied work from PDB to Sabuj Banglow at WTP Premises at under Mukutmanipur w/s scheme Block-Khatra under Bankura Mechanical Division PHE Dte.
REPLACEMENT OF DAMAGED POWER CABLE, FEEDER PILLAR BOX AND LED LIGHT FITTINGS BY NEW ONE INCLUDING ALLIED WORKS AT THE SOUTHERN SIDE OF 18 MG OLD RESERVOIR OF CLEAR WATER CAMPUS UNDER GRWW.
Construction of power cable trench, protection work for retaining soil at switchyard, renovation of fencing, switchyard and allied civil works at Bally 33 11 kV Sub Station,WBSEDCL in the Dist Of Howrah
Supply and laying of 50 sq. mm. 3.5 core LT power cable from Borobazar Substation, Ganga Sagar main mela ground to beach side Ganga Arati Stage in connection with Ganga Sagar Mela-2024
LT Power cable through PVC pipe in underground trench at Shimulia high lift pump to Shimulia low lift pump house along NH-32 due to widening of the NH-32 under Purulia Municipality.
Urgent replacement of faulty power cable, service mains, essential protective and measuring accessories including supply and fixing of cubical panel with other allied works at Sector-III Quarter under PBPS(Drg.)S andD.
LAYING OF UNDERGROUND POWER CABLE ALONGWITH INSTALLATION OF STARTER PANEL, FEEDER PILLAR BOX AND OTHER ASSOCIATED ELECTRIFICATION WORK FOR OPERATING BIG DIATUBEWELL AT 24 CHAULPATTY ROAD NEAR RASHMONI BAZAAR IN WARD NO. 34
Supply and Laying of LT power cable from meter room to LT panel room as per Estimate No16 TESD of 202223 in the premises of Shahid Matangini Hazra Govt.General Degree College for women.
Electrical Installation for the proposed Building for Office Cum Training Centre at Plot No 18 by 9 Block DD Sector 1 Bidhannagar Kolkata Electrical installation Earthing laying of HT and LT cable and allied works for proposed Sub station
LIFTING OF IRREGULAR AND SAGGED SERVICE CABLE OF BUSTEE DWELLER BY SUITABLE ARRANGEMENT AT 7/1, KULIA TANGRA 2ND LANE AND SURROUNDINGS IN WARD NO. - 57.
LIFTING OF IRREGULAR AND SAGGED SERVICE CABLE OF BUSTEE DWELLER BY SUITABLE ARRANGEMENT AT 6/1, KULIA TANGRA 2ND LANE AND SURROUNDINGS IN WARD NO. - 57.
Supply and installation of Surge Protection Devices at different electrical equipments including installation of Lightning Conductors at Purulia Government Medical College and Hospital_ Purulia in the District of Purulia_ Electrical Work_ Project ID_
Work for Laying of 02 Nos 33 KV 3C 400 Sqmm XLPE cable by micro tunneling manual laying of length 2.050KM from Junction point of Link Road to Belmuri Station and Chinsura Dhaniakhali 17No Road to New 33 11 Kv Sub-Stn of Hitech Infrapark Ltd
Micro-tunneling with 160 mm HDPE pipe (PE-80, PN-6 HDPE pipe) and laying of 11 kV,3C, 300 sq mm XLPE cable for R/L-1.84 km for bifurcation of 11 kV Pijush and Payodhi feeder from Jangalpur-II SS under Howrah-2 Division
Drawal of two nos 33KV feeder by making of LILO of existing JOKA GSS RANIA 33by11 KV Substn circiutII by laying of 33 KV 3CX400 Sqmm XLPE Cable for feeding 33by11 KV Indor AIS type substation with 2X10 MVA transformer within the project of PS VINAYAK
Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying by 33 KV 400 Sqmm XLPE CABLE (3C) of R/L-0.300 Km (Double Ckt) 33 KV Rishra-Kaikala I AND II Feeder (2 Nos for each Feeder) from Baruipara to Chandanpur towards 4th Railway TracK
LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L-1.050 KM (DOUBLE CKT) 33 KV SOURCE FROM CHANDITALA GSS TO RADHIKA EXP. FOR ARRJAVV 33/11 KV SUB-STATION, DIST.-HOOGHLY UNDER SERAMPORE DIVISION OF
Work for Laying of 03 Nos 33KV 3C X 400 sqmm XLPE cable by micro tunneling and manual laying of Route length of 0.855 Km each Cable for Conversion of OH Double Ckt Dunlop I and II Tower line over Bandel Katwa Rail Track Crossing SAHAGANJ
Drawal of one no 33 KV UG Cable Circuit RL of 8 km by laying of 33KV 3 core 400 sq mm XLPE Cable from New Town AA IIC 220 132 33KV GSS to Baguihati 33 11KV Sub-Station at Bidhannagar II Division under Bidhannagar Region WBSEDCL
LAYING OF HDPE PIPE BY MICROTUNNELLING AND MANUAL LAYING OF 11 KV 185 SQMM XLPE CABLE 3C OF RL1.160 KM FOR DRAWAL OF NEW 11 KV FEEDER TO EFFECT NEW BULK CONNECTION OF ULTIMATE DEMAND OF 1400 KVA I.R.O SHRI DAKSHINESWARI MAA POLYFABS LTD. UNIT II
LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L-1.060 KM (DOUBLE CKT) 33 KV SOURCE FROM LUX TO THUMPSUP FOR ARRJAVV 33/11 KV SUB-STATION, DIST.-HOOGHLY UNDER SERAMPORE DIVISION OF HOOGHLY REGION
Restoration of Road and Hard Shoulder by BM, Mastic, Sand filling, Jhama metal for laying of 33 kV, 3C, 400 sq mm XLPE cable through 160 mm dia HDPE pipe by HDD method and part cut and cover method adjacent to Ranihati - Haridasur-Amta from 2.50 km
Supply of Materials and Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying of 33 KV 400 Sqmm XLPE CABLE 3C of RL 4.182 Km for 33 KV Source from Par Dankuni to Raghunathpur Panchayet Office for Shriram Grand City 33/11 KV SS
Laying of 11 kV 3C XLPE cable on outgoing 11kV HT network and laying of 1.1 kV 4 C PVC cable on LT Network of DTRs and installation of LT feeder pillar etc towards effecting NSC at UPWAN (MLA-OSL) under Siliguri Sub Urban Division, WBSEDCL
Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying by 33 KV 400 Sqmm XLPE CABLE (3C) of R/L-0.100 Km (Double Ckt) 33 KV Belmuri I and II Feeder (2 Nos for each Feeder) from Baruipara to Chandanpur towards 4th Railway TracK extensio
Drawal of one no 33 KV UG Cable Circuit RL of 4 km by laying of 33KV 1 core 1000 sq mm XLPE Cable from New Town AA IIC 220 132 33KV GSS to Narayanpur 33 11KV Sub-Station at Bidhannagar II Division under Bidhannagar Region WBSEDCL
Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying by 11 KV 185 Sqmm XLPE CABLE (3C) of R/L-0.300 Km of 11 KV Nalikul Feeder and 11KV Madhusudan Feeder (2 Nos for each Feeder) towards 4th Railway TracK extension at Balarambati, Ka
Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying by 11 KV 185 Sqmm XLPE CABLE (3C) of R/L-0.200 Km of 11 KV Chanditala-Singur Feeder at Shyampur and Baruipara (2 Nos for each Location) towards 4th Railway TracK extension Dist.-Ho
Construction of new 33 kV UG line by micro tunneling 600 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C400 sq mm XLPE cable from Anmol Complex Main Gate to Uttar Joypur Bill Shiv Mandir under Howrah 1 Division
LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L-1.050 KM (DOUBLE CKT) 33 KV SOURCE FROM THUMPSUP TO ARRJAVV 33/11 KV SUB-STATION,DIST.-HOOGHLY UNDER SERAMPORE DIVISION OF HOOGHLY REGION, WBSEDCL.
Construction of cable trench 900mmx600mm with 100mm thick cover slab of RL 258 mtr for shifting diversion of existing 33 kV HTOH Joka Amtala Ckt 1 Joka GPI Bulk Fdr by HTUG line 3C 33kV 400 sq mm XLPE cable in the land of Morgan Walker inf
WORK FOR LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L 2.580 KM FROM TALDANGA SUB STATION TO MIARBERMORE FOR MOGOLTULI 33/11 KV SUB STATION TOWN CHINSURAH DIST HOOGHLY IN IPDS CND DIVN