Supply and laying of underground cable along with erection of two new Feeder Pillars and Cable Joint Box including rearrangement of some service cable for the various residential quarters
REPLACEMENT OF EXISTNG ACSR ZEBRA CONDUCTOR BY HTLS CONDUCTOR (1200A) I.R.O I) 220KV D/C TRANSMISSION LINE BETWEEN NEW CHANDITALA 400KV SUBSTN. HOWRAH 220KV AND II) 220KV D/C TRANSMISSION LINE BETWEEN RAJARHAT 400KV SUBSTN. ALLIED WORK ON TURN KEY.
AMC with Preventive and Corrective measures of 250 KVA compact substation including allied necessary works and Installation of Lightning conductor at Maulana Abul Kalam Azad Bhavan at DD 45 Salt Lake Sec I Kol 64 S and F of lighting conductor
Construction of new 33 kV UG line by micro tunneling 1000 Mtr and laying of 200 mm dia PE 80 PN 6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Rajchandrapur Zero Point to Bally 33 11 kV Sub Station under Howrah 1 Division
Drawal of one no 33 KV UG Cable Circuit RL of 4.5 km by laying of 33KV 1 core 1000 sq mm XLPE Cable from New Town AA IIC 220 132 33KV GSS to NT AA II E 33 11KV Sub-Station at Bidhannagar II Division under Bidhannagar Region WBSEDCL
Extension of 33 KV bay at FSEZ SEC-II 33/11 sub-station drawl of 33KV UG line by 3CX400 sqmm XLPE cable and associated civil works for drawl of 2nd 33 KV source to M/s WEBSOL Energy System Ltd at Falta SEZ under DHD div Civil and electrical
Micro-tunneling with 160 mm HDPE pipe (PE-80, PN-6 HDPE pipe) and laying of 11 kV, 3C,300 sq mm XLPE cable for route length of 1.64 km for bifurcation of 11 kV Saraswati Bridge from Srijan 33/11 kV Sub-Station under Howrah-II Division 2nd Call
Construction of new 33 kV UG line by micro tunneling 650 Mtr and laying of 200 mm dia PE 80 PN 6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Anmol 33 11 kV Sub Station to Anmol Complex Main Gate under Howrah 1 Division
Aug/Modernization of system by replacing 1-Ph DTR by 3 Phase (11KV/.433 KV) DTR along with drawl of required 3-Ph HT Lines and Conversion of 1-Ph LT OH Line to 3-Ph LT AB Cable Loss Reduction at Purulia Dist (PKG PS 10) of West Bengal Under RDSS
Aug of existing 33/11KV Sub-Stations and Aug /Modern. of system by replacing 1-Ph DTR by 3 Phase DTR along with drawl of required 3-Ph HT Lines and Conversion of 1-Ph LT OH Line To 3-Ph LT AB Cable at Paschim Medinipur (including Jhargram) Dist. PS 7
Lightning Conductor Installation at S.M.M. Home (School Building,Rescue Building,Sima Bhawan,Office Building),Howrah.Project ID WC242518583S000.
Augmentation of Capacity of PTR and conductor at Gowalafatak 33/11 KV Sub-Station under Naihati Division
Single Tension Hardware Fittings with Compression type dead end clamp for ACSR Wolf Conductor (150 Sq. mm)
1.1KV GRADE, 5 C x 4 SQMM, EPR INSULATED, COPPER CONDUCTOR, PCP, UNARMOURED CABLE(MAT Code 271125535)
Single Tension Hardware Fittings with Compression type dead end clamp for ACSR Wolf Conductor 150 Sq. mm
5 MP BULLET CCTV CAMERA, 8 PORT LAYER 2 NETWORK SWITCH POE, 6U RACK, UPS 600 VA, IP BASED NVR 16 CHANNEL, NETWORK VIDEO RECORDER NVR 32 CHANNEL, 8 TB SATA HDD SURVEILLANCE GRADE, ARMOURED AND JELLY FILLED 6 CORE OFC CABLE SINGLE MODE, PVC FR COPPER WIRE...
NVR 16 CHANNEL, PTZ CAMERA, BULLET CAMERA 30 MTR, BULLET CAMERA 50 MTR, HDD 6 TB SVR, OFC CABLE, SMPS, CAT 6 CABLE, POE 4 PORT SWITCH, 5 PORT NORMAL SWITCH, MEDIA CONVERTER, ELECTRIC WIRE 1MM, ALUMINIUM WIRE 1MM, OFC PATCH CORD, OFC JOIN BOX BOQ Title BOQ BID
Emergent Supply laying of power cable in place of damaged cable near opposite to Mangal deep Island From Feeder Box to pole No 660 and earthing arrangement at Innovation centre New Town Kolkata under WBHIDCO O EPCMDEIC
Construction of 01 No. Transformer Plinth, 01 No. 11kv Cable End Box, approx 20m Power Cable trench and allied civil works at Sankrail 33/11 KV Sub-Stn under Uluberia Division in the District of Howrah, WBSEDCL
Repairing including replacement of damaged components of Main LT panel and replacement of damaged submersible power cable of motor no-2 along with other allied works at Kalibari LS-2B under Kudghat Unit/S and D department.
Repairing of 450 mm dia. C.I. Pipe line leakages making Barbed wire boundary , making of P.C.C. walk way ,stairs ,M.S. gates ,power cable laying ,light fitting etc. and other allied works under RCFA-I Water Supply Scheme.
URGENT REPAIRING OF THREE NUMBERS 20HP/15KW STAR DELTA STARTER INCLUDING REPLACEMENT OF FAULTY POWER CABLE AND SUPPLY AND FIXING OF FEEDER PANEL BOX AT DWF PUMP ROOM WITH ALLIED WORKS OF PBPS(DRG.)/S and D.
Modification, repairing and replacement of worn out components of star delta motor 150kw/415v) starter panel no 3 including replacement of Power cable and other allied works at Keorapukur MPS under Kudghat Unit / S and D Department.
Supply and relaying of power cable with allied work for reparing of yard lighting at OHR site, Zone-C of Punncha water supply scheme block-Onda under Bankura Mechanical Division PHE Dte. in the district of Bankura.
SUPPLY, LAYING, TESTING AND COMMISSIONING OF 11 KV GRADE 300 SQ. MM XLPE HT POWER CABLE FOR EXISTING CAPACITOR BANK OF PUMP UNIT NO. 4 WITH OTHER ANCILLARY WORKS AT CLEAR WATER PUMP HOUSE PHASE-II, GRWW.
Miniature Circuit Breakers Distribution Boards as per IS 13032 (Q3), LED Garden Light (V2) (Q2), Capacitors for Electric Fan Motors as per IS 1709 (V2) (Q3), PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3), ... (Q3), PVC Insulated Unsheathed ... Flexible Conductor as ... copper conductor 1100V ...
Installation of 05 nos 35 m LM with earthing of LM structure by construction of 10 new earth electrode incl. installation of flood light on LM with connection with LDB by laying control cable and dismantling of shield wire at sainthia 132KV substn
Construction of One no. 10 MVA PTR Foundation and dismantling of one no. existing PTR foundation along with construction of 300 mm X 300 mm control cable trench of 10 mtr to facilitate augmentation of PTR at Bidhannagar 33/11kV Substation under Sili
WORK FOR INSTALLATION OF ELECTRICAL EQUIPMENTS LAYING OF 11 KV GRADE XLPE U.G. CABLE 1.1 KV GRADE COPPER CONTROL CABLE ERECTION OF TERMINAL DP AND OTHER ALLIED WORK FOR CONSTRUCTION OF NEW 33/11 KV SUB-STATION AT SUGANDHA P.S-POLBA TOWNCHINSURAH
WORK FOR INSTALLATION OF ELECTRICAL EQUIPMENTS DRAWAL OF BUS BAR LAYING OF 1.1 KV GRADE COPPER CONTROL CABLE ERECTION OF 4-POLE AND OTHER ALLIED WORK FOR RENOVATION OF 33/11 KV SUB-STATION AT SEORAPHULLY TOWN BAIDYBATI DIST HOOGHLY IN IPDS
WORK FOR INSTALLATION OF ELECTRICAL EQUIPMENTS LAYING OF 11 KV GRADE XLPE U.G CABLE 1.1 KV GRADE COPPER CONTROL CABLE ERECTION OF TERMINAL DP AND OTHER ALLIED WORK FOR CONSTRUCTION OF NEW 33/11 KV SUB STATION AT KEVENTER TOWN RISHRA HOOGHLY
WORK FOR INSTALLATION OF ELECTRICAL EQUIPMENT LAYING OF 11 KV GRADE XLPE U G CABLE 1.1 KV GRADE COPPER CONTROL CABLE ERECTION OF TERMINAL DP AND OTHER ALLIED WORK FOR CONSTRUCTION OF NEW 33/11 KV SUB STATION AT MOGHOLTULY TOWN CHINSURAH
WORK FOR INSTALLATION OF ELECTRICAL EQUIPMENTS LAYING OF 11 KV GRADE XLPE U G CABLE 1.1 KV GRADE COPPER CONTROL CABLE ERECTION OF TERMINAL DP AND OTHER ALLIED WORK FOR CONSTRUCTION OF NEW 33 11 KV SUB STATION AT ARAMBAGH POWER HOUSE CAMPUS
Illumination of Vivekananda more including supply and installation of 2 nos 7 mtr GI Octagonal pole with LED flood lights and area lighting including supply and laying of service cable.
Universal type Come along clamp (MS steel body) suitable for copper conductor of size 65 to 150 sq mm. Come along clamp body MS:IS:226/2062 or latest, Jaw for come along clamp MS:IS:2062 or latest with hardness load capacity 3 ton with load test certificate. Warranty Period: 30 month(s) from the date of Supply
Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3), PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2), Float valve PVC 25 mm with rod and ball, Bottle trap 32mm CP, CP shower arm 15 X 100 mm, PVC waste pipe 32 x 600mm, CP shower arm 15 x 150 mm, Brass spindle for WHB mixture 15mm, Internal fitting Syphton Type, CP Angle cock 15mm Autopush for Urinal, Bottle trap 32mm PVC, Brass spindle Elco type Quarter Turn Heavy for Bib Cock or Stop Cock
(1) Rail Jumper Assembly with RailClamps at both end with 13 Meter long, PVCcable as per RDSO Drg. No. RE/33/P/500. RailJumper clamp AL BRONZE IS : 3091/1999 ANDPVC COPPER CABLE USED AS PER IS 694 SIZE. (2) Galvanised steel flexible wire bond for ... PVC COPPER CABLE USED ... PVC COPPER CABLE USED ...
PVC Flat Cable, Aluminium conductor with PVC Insulation and sheath as per IS: 694 (Q3), PVC Aluminium cable as per IS;694 (Q3), PVC Aluminium cable 1 core and multi core Circular Sheathed cable with Rigid Conductor as per IS:694 (Q3)
Shifting and relocation of existing distribution feeder box and diversion of all power cable line to feed power supply for street lights, Wi-Fi, High Mast, Fountain etc. near Chingrighata fly over on Saltlake By Pass under NDITA.
Dismantling overhauling repairing re-installation with supply spare parts of 1 pump Q2305 m3/hr Head 28m(Batch-III No.01) eplacement of indoor outdoor illuminations including damage power cable with.....at Kalyani CWPS under Kalyani Municipal Area
SUPPLY,ERECTION OF COMPOSITE TOWERS WITH OVERHEAD STRINGING WITH SUPPLY,LAYING,TERMINATION OF 132KV POWER CABLE WITH ACCESSORIES AND ALLIED WORKS ON TURNKEY BASIS IRO RECONFIGURATION OF 132KV NETWORK AT DHULIAN 132KV SS TO ESTABLISH D/C CONNECTIVITY
Electrical Structure, Drawal of Wire Bus, Installation of equipments, Laying of copper control - power cable, yard lighting, Earth mat and other related electrical work for new Bhabta 33 KV SS under Berhampore Division in the District of MSD
HDMI Cable 20 Mtr, VGA Cable 20 Mtr, Power Cable 20 Mtr, VGA Cable 03 Mtr, Raxine, Foot Mat 3 x 2, Wash Basin, Windsocks Flag White and Orange, Red Flag 3 x 2, Lock, Welding Machine Set
Rigid GI pipe - BHEL (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3), Mild Steel Clamp (Q3), Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3)
Repairing and SITC of Lightning Conductor system in Super Speciality Block Building under Medical College and Hospital Kolkata.
RENEWING COPPER CONDUCTOR BETWEEN ROTOR WINDING AND SLIPRING OF 580BHP SLIPRING INDUCTION MOTOR OF STATION ONE AT TPS
Supply and fixing 8 shape cu. Conductor and allied accessories of Gantry Crane at Vidyasagar Setu under HRBC
10 Sq. mm, 4 core, aluminum, LT 1.1 KV cable multi stranded conductor, XLPE insulated aluminum strip (Q3)
LAYING OF 33KV 3C400 SQMM XLPE CABLE FROM NEW TOWN AA II D 33 BY11 KV SUBSTATION TO BENGAL ULTIMATE RESORTS LLP AT NEW TOWN AA II E PLOT NO 9BY1 AND FROM NEW TOWN AA II E 33BY11 KV SUBSTATION TO BENGAL ULTIMATE RESORTS LLP AT NEW TOWN AA II E
EI works of Proposed G plus 3 Model for Single 100 bedded Pre-fabricated COVID ward-Electrical Infracture work (Supply and laying service cable, external compound lighting at Gazole Rural Hospital