Loading…
Loading…
4,797 results • Best match
Improvement of RCC Drain and CC Road from Milk Dairy to Kanti Houseat Ward No 17 and Jigani Main Road to Afzal Hose and Venkateshwara Tractor Garage to The Square Electrical Machine Factory at Ward No 14 in Jigani TMC Limits
Improvement of CC Road from Vivekanand Nagar Datta Bavi House to Chandrakant Hichake House and Ravichandra G Patil House to Manjunath N Manthale House at W.No.9 in Kalaburagi City. (Category-Others) (Est Cosr Rs. 10.00 Lakhs) (15th FC 2025-26)
developement of keremoole mohan house road at ward no 14 and construction of drine and providing hume pipe near boodu bhagavathi temple dwara and providing cc road balence portion of boodu anganavadi road in ward no 13 sullia tp limits
Construction of CC Road and Drain from Kappagal Main Road to HLC canal no-14 (0.00 to 375m) in Brahmayya colony of 24th ward in Ballari city Ballari District, under 2515 KKRDB Micro Projects for the year 2025-26 General Category)
CONSTRUCTION OF CC ROAD AND DRAIN FROM KOCHARI ROAD TO DR B R AMBEDKAR BHAVAN OF HEBBAL VILLAGE IN HUKKERI TALUKA BELAGAVI DISTRICT UNDER 4059-80-051-0-60-422 SCP - CHIEF MINISTER INFRASTRUCTURE DEVELOPMENT PROGRAMME FOR THE YEAR 2025-26
Improvements and asphalting road from K.K.Hatti Village to Amradevaragudda Village in Kudligi town, 2) Construction of CC Road and Drain at Housing board colony(2nd ward) and 3) 6th ward Beeralagudda road Kudligi town, in Kudligi Constituency, Kudligi Taluk, Vijayanagara
Construction of CC Road/Drain in ST Colony 1)Kudradavu 2)Yerobonahatti 3)Kurihatti 4)GaddadaBorayanahatti 5)Nukanahalli 6)Minakere 7)Sakalapura 8)Yaralinganahalli 9)Arjunachinnanhalli 10)Nadavalahalli 11)AdaviSooranahalli 12)Kelagina Karanarahatti 13)Megala Karanarahatti in Kudligi Constituency Vijayangar Dist
Construction of CC road and CC Drain from Champpavva Saidappa Madar Homes to Madar Samaja da Smashan at Kokatanur Village in Athani Taluka of Belagavi dist. Under HOA 4059-80-051-0-60-422 SCP During the year of 2025-26
Constructtion of cc road from Mallappa Kumbara House to Siddappa Kumbar house and from Anjuman School Compound to Gururaja Bijur house in w no 23 and Repairs of Ugd Chamber near Mallappa Kumbar House and Sidadappa Kumbar House Under Muncipal Fund
Construction CC road from Annakka Talawara house to the main road in Hirenasabi village, of Badami constituency In Badami taluk of Bagalkote Dist. Under H/A 4059-80-051-0-60-422 for the Year 2025-26(Reserve for ST)
PACKAGE-02/2025-26 (1) Construction of CC Road from near SDA School Sanjay House in Kobbaripete and in Maruthi Badavane in Ward No 06 (2) Construction of CC Road from Mandakki Yusufsab House to Arji Rangappa House in Kobbaripete Ward No 07 (3) CConstruction of CC Drain from Angadi Hanumanthappa House to Shanthi Brahma Samaja and Behind Kumaraswamy House to Honnamma Badavane Road in Honnamma Badavane Ward No 08 (4) Construction of CC Drain from PWD Manjanna Shop to Dhanu House in NES Badavane Ward No 09 at Hosadurga Town.
Road
Repairing of C C road From Murageppa kuppasagoudra house to gurusidd sanadi house pachapur kirani store to iranna doodagavi house and repairing of rudrappa hudali house to laxman hukkeri house parappa patil house to rama nayak house mahadevi mudagannavr house to kumar kadadevarmath house at 15 no ward 2 Drilling borewell installing motor and Construction of Cistern beside the road at 3 no wrad 3 providing Fixing Pavers infront of Durga devi temple at 2 no ward 4 Repairing of Public Toilet near Kumbar Shed and Construction of CD in w n o 8
Construction of CC road near incomplete CC road near Dalal Shed to Maning Patil House and in STP plant from incomplete CC road to poultry farm in Ward No 17 Construction of a CC road from Siddu Mattikalli house to the main road in Ward No 17 ... a CC road from ... a CC road from ...
Construction of CC road from Ajith Korpade house to Kadappa Konnur house in Ward No 02 Construction of CC road from Lakshmana Navi house to Maladar house in Ward No 02 Construction of CC road from Sangappa Kulagoda house to water purification plant ... of CC road from ... of CC road near ... of CC road at ...
Construction of CC Road and drain at T.M.Venkatesh house to Pavan house Shanthinagar wno.15, Balajigara street Shivanna house to main road Kataripalya wno.10, Construction of CC drain behind Basheer house and Development of road Arch to Madhu ... of CC road at ...
Package no.05 (1) Construction of Pipe drain, Chamber and covering slabs from Magamanamma house to Bavikatte Maramma temple at ward no.09 (2) Pipe drain in Bazar road at ward no.09 (3) Construction of CC road, pipe drain and chambers in Bramhanara ... (4) CC road and ...
Package 1 1 Construction of RCC drain from Kolmi Zakir House to Nayum House and CC Road from Gadilingappa House to Durgappa House in ward no 01. 2 Construction of CD Near Anjaneya Temple, RCC Drain from cement Nagaraj House to Narayan House and ... and CC Road from ...
Package no.04 1) Construction of Drain in Sadashiva badavane from Khaleem house to Main road at ward no.06 (2) Asphalt road in Sumangali badavane from Rehaman house to Narayanappa, Rathnamma house at ward no.07 (3) Construction of Asphalt road from ... mtr CC road from ... of CC road from ...
Construction of Asphalt road from BEML High School Road to Vijayanagar Goldfield Hospital to Presilla House in ward no 32 and CC road construction from Thomas House to Reading Room from Welagani House to Marial House from Lias House to Saukath ... block CC road construction ...
OTHER WORK
CONSTRUCTION OF CC ROAD FROM AMBEDKAR SAMUDAYA BHAVAN TO DURGAPPA MADAR HOUSE, DURGAMMA TEMPLE SURROUDING AT NILOGAL VILLAGE, RENUKAMMA MADAR HOUSE TAVARGERA MAIN ROAD IN HIREMANNAPUR VILLAGE, SHARANAPPA MADAR HOUSE TO TAVARGERA MAIN ROAD, NINGAPPA MADAR HOUSE TO GUDADUR ROAD IN KUSHTAGI TALUKA
Construction of a CC road from Laxmidevi Temple to Sadashiv Moshis house and in the streets of Bhimanagar, Kocheri village, Hukkeri taluk, under HOA 4059-80-051-0-60-422 S.C.P Chief Ministers Infrastructure Development Program for the the year 2025-26.
Construction of CC road at ward number 2 in front of tailor raju house. Construction of two side box drian and deckslab at ward number 2 Sri Kanaka road Ait circle circle bypass road first road infront of Naidu mess in cmc limit
Construction of Interlocking Paver road/CC road/CC drain from Poppanalu Main Road to Anjaneya Swamy Temple, in General Category Colony, in Upparahosalli Village, in Siruguppa Taluk, Ballari District under 2515-KKRDB CMDQ Projects for the year 2024-25. (Reserved ST Category)
Construction of CC road and Other development works from National Highway to Pradhan Nagaraju house in ward no 25 and Development work from lambani bhavana to connecting M.G. School Road and Nilappa Teacher house extending road in ward no 31 at sira city
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM ANAND KAMBLE HOUSE TO MAIN ROAD OF PLOT AT DADDI VILLAGE IN HUKKERI TALUKA BELAGAVI DISTRICT UNDER 4059-80-051-0-60-422 SCP - CHIEF MINISTER INFRASTRUCTURE DEVELOPMENT PROGRAMME FOR THE YEAR 2025-26
Pakage-14 Construction work of CC Road 1)from Batlakatte village pickup channel to Mudhadadi Joing road (0.00 to 0.700 km) 2)from Bisaleri Shri Ram Temple to Mudhadadi Road Joining Road (Ch 0.00 to 0.700 km) In Davanagere taluk (Resrved For 2A)
Improvement road form Shiradu Government School to Gangaiah house and Construction of CC road and drain in ward of Kallambella village and Construction of road by closing the pothole next to Kollamma site in Shivajinagar, Sapthagiri ward at Sira Town in Sira Taluk
Construction of CC road on SH06 from KM 329.00 (Vaddar Hosur Village) to KM 332.34 (Balakundi Village) (In selected Reaches) in Ilkal Taluk of Hungund Constituency of Bagalkot District, under 4059-60-051-0-60-132 CMIDP for the year 2025-26.
Construction of CC Road & Drain Sarounding Roads Chethana School in Raghavendra Colony in madhugiri town,Improvements of Road & Drain In Word No 22 TVV Petrol Bank To Dandina maramma Temple Via Ganapathi Temple ( From Chathrabhavi road to Dandinamaramma Temple ) in Madhugiri Town
Construction of CC Road in Karekoppa village limit from Ch 4.90 km to 5.00 km and Providing Cobble stone for Footpath from Ch 4.50 km to 5.00 km in road connecting from Neraluru Kanakapura road to Karekoppa via Bananthahalli,Manchegowdanadoddi in Channapatna Taluk
Construction of a drainage system by laying 10 inches of PVC pipe from Parasappa Ramojis house in SC Colony, Ward No. 07, Yadavada village, Mudalagi taluk to Hanamant Undappagolis house, and installation of a chamber plate, and construction of a CC road...
Providing asphalthing to road in the village limits of Bettahalli Kaval (Gottigehalli main road to Bettahalli Kaval Road) and Construction of cc road and drain in the Village Limits of Hosagabbadi to Halegabbadi of Kaggalahalli Grama Panchayathi of Harohalli Taluk in Ramanagara District
Construction of CC Road and Drain at Various Colony and Layouts Ward No. 38, 45, 47, 48, 49, 50, 51 Ward and Udnoor Road Amogh Nagar in Kalaburagi City Corporation Limit of Kalaburagi South Constituency under CMIDP for the year 2025-26
DEVELOPMENT OF CC ROAD SHREE SHAW NILAYA DOOR NO 677/4 TO SHREE RANGA KRUPA NILAYA DOOR NO 818/12 AND SMT ANJINAMMA SHREE PUJARI HANUMAPPA KRUPA DOOR NO 679/6 TO YESU PRARTHANALAYA S.S HITECH LAYOUT MAIN ROAD AT WARD NO-32
Construction of CC Road and Drain from 1.Shekrappa house to manju house 2. village Bus stand to Basava House 3.Pushpavathi house to Bhagyamma House Tayappa house to Hanumanthamma (anganwadi) in Muddattanuru village of Siruguppa Assembly Constituency in Siruguppa Taluk Ballari Dist
Construction of CC Drain and CC Road at 1)16th ward Rajivagandhi Nagara 2) 17th ward KK hatti 3) 18th ward AD guddagollarahatti 4) 19th ward AD Gudda 5) 20th ward Govindagiri, Kudligi constituency, in Kudligi Town, Vijayanagara District.(HOA DMF 8th Phase)
Improvement CC Road and drain from Mazhar sab house to Rizwan sab house and Khaja Pasha sab house to Ansar sab house at Yadulla Colony at w.no.29 in kalaburagi city. (Category- Others) (Est Cost Rs.15.00 Lakhs) (15th FC 2025-26)
Package No 3 1 Installation of Pavers near Kankanawadi Tota and Nagatevva Temple in ward no 10 2Construction of CC Road near Koravanji Temple in Ward No 11 3Construction of Aspalt Road from Chidanad Basalingappagol House to Laxman Sakreppagol in Ward No 12
Construction of CC road and Drain from Shri Chidanand Maang house to Margamma temple and Margamma temple to Shivaji Melinkeri house in SC oni at Khanapur village in Aland Taluka under 5054-03-0334-0-75-422 for the year 2024-25.
CONSTRUCTION OF CC ROAD AND DRAINS IN KUMBENAHALLI, AGRAHARAKOPPALU ,CHITHANAHOSAHALLI, AGRAHARA CHOLENAHALLI, AGRAHARA,NAMBIHALLI,N BINDENAHALLI, DODDAKARADEVU,MURARNAHALLI, BELAGULI, KUNDURU LAKSHMIPURA,THIMLAPURA,A KALENAHALLI, THIPPURU,VARANAHALLI,SATHENAHALLI, CHOWLAGALA,K SINGENAHALLI,BARAGURU BARE, DODDAMATHIGHATTA, MALENAHALLI, KALLENAHALLI VILLAGE LIMIT IN DANDIGANAHALLI HOBALI IN CHANNARAYAPATTANA TALUK
Providing Consultancy services for Preparation of DPR to New Taluk Praja Soudha Compound Wall and Providing CC Road, CC Drain and Improvement of Connectivity Road at Kampli and Kurugodu Towns in Ballari District under 2515-KKRDB (Macro projects) for the year 2025-26
Construction of Bolukeri Road from Ravalnath Temple in Kumta Taluk, Kagala Panchayat, Uttarkannada District Construction of Heggere Road in Kagala Panchayat, Kumta Taluk, Uttarkannada District Construction of CC Road from Palaskeri Bele Dakke, Kodakani Panchayat, Kumta Taluk, Uttarkannada District to Mahabhaleswar Ambigaravar House
CONSTRUCTION OF A CC ROAD AND CC GUTTER IN THE COLONY OF THE ROADS PASSING FROM THE S.C COLONY AND THE ROAD FROM THE S.C COLONY OF HOLIHOSURA VILLAGE IN KITTUR CONSTITUENCY OF BAILAHONGALA TALUK UNDER HOA 4059 CMIDP-SCP FOR 2025-26.
LAYING OF ASPHALT ROAD IN NEHRU NAGAR FROM RAMAPPA NEMAGOUDAR HOUSE TO BAGAWAN HOUSE IN WARD NO.23 Laying Of CC Road From awoti House To Khemalapur House , praving And instaling of Pipe line awoti House To Khemalapur House Under TMC Limit
Package 2 1 Construction of CD Opposite to Banashankari Nilaya in ward no 15 in Hosapete City. 2 Construction of CC Road from Huchangamma temple to Police Ramanna house, sukkada Gangadhar house, Tayamma temple to kolmi in ward no 18 in Hosapete City.
Construction of CC Road in selected Reaches to Road SH134 to Yankanchi Mattikatti MDR from KM 4.00 to 5.14 in Badami Taluk of Bilagi Constituency under Head of account 5054-04-337-0-01-154 MDR Improvements for the year 2024-25
Construction of CC Drain and CC Road at 1)1st ward Bapujinagara 2) 2nd ward Bapujinagara 3) 3rd ward Bapujinagara 4) 4th ward Kengavva Thota and Vidyanagara 5) 5th ward Azadnagara Kudligi constituency, in Kudligi Town, Vijayanagara District...(HOA DMF 8th Phase)
Construction of CC road & drain, construction of deck slab and installation of covering slab in Ward No. 05 from M. Karenahalli Anjaneya Temple to Mayanna Lokesh house and from Maya house to Mahadevaya house and near Shivanna house in Bidadi Municipality limits.