Loading…
Loading…
1,09,697 results • Best match
CONSTRUCTION OF CEMENT CONCRETE DRAIN AND BOX CULVERT IN FRONT OF ECO PARK SALOD (HIRAPUR) TAH AND DIST WARDHA
M/o Drain (Re-construction of RCC Drain and Box Culvert in B-Block Car Market Sector-16), Noida
Construction of Chitrakhore Karahpithiya se Muradpur Road Km. 3 me Ichadawa Nala par 3x6 Mtr Box Culvert ka Karya
Construction of Adhiyari Jigna Chapartalla Road to KM 7 at Sthani Jharkhandi Nala of BOX Culvert 5x3x3 Mtr Span
Construction of RCC Box culvert at Kalyani/Shiv nagar crossing road near Kalyani Drainage Pump house under AMC area.
Construction of RCC drain along IBP Camp from RCC Box culvert near Nima weigh bridge to Hizukita check post.
Construction of Box Culvert on Ambewadi-Bemalkheda SH-163 at KM 80.61 in Chitguppa Taluka Bidar District. (UNDER KRDCL)
Atmakur Municipality - 15TH FC UNTIED GRANT/2020-21 2nd installment -. Providing Box culvert Near Allipuram in ward No :23
Providing BT Road from Vijaya Lakshmi Nagar to Box Culvert in 26th ward and 28th wards in Bhimavaram Municipality
MGDS-Construction of Box Culvert on Mentepudi branch channel at Matyapuri village limits in the Jurisdiction of WUA Matyapuri
Construction of CC drains from Chowdary pet to Railway Box Culvert , Chenchu Colony in 19th ward in Gudivada Municipality
Construction of Box Culvert over Muruku Bodi Opposite St.Anns School at Chinapparao Thota in 24th ward in Bhimavaram Municipality
Desiltation of Box Culvert across the NH-16 near Agathavarapaadu Vaagu Bridge @ Km.BC 410+346 Under AE - VII Section.
Construction of VRCC Box Culvert in front of Kunchumamba temple in ward No.86 of Gajuwaka Zone of GVMC
MGWDDS Construction of Box Culvert On Kanuru Minor drain at Km 2.600 in Kanuru village limit of Peravali Mandal
Construction of Box culvert across Mattaparru Minor drain in Mattaparru village limits of Palakollu Constituency in West Godavari District
Construction of Box culvert at Nagarampalem to Srinivasa Nagar under Sachivalyam No. 1086066 in Ward No. 07, Zone-II.
2025-Eng05-44-123 Widening of Box Culvert at Ramachandra nagar in ward no.44 in North Zone, GVMC.
2025-Eng05-44-123 Widening of Box Culvert at Ramachandra nagar in ward no.44 in North Zone, GVMC.
Construction of RCC box culvert in Mutyamamba colony at Narava in Ward no. 88 of Gajuwaka Zone of GVMC
Construction of Box culvert at Masjid road junction beside of flyover bridge in ward no. 10 in Tadepalligudem Municipality.
Construction of RCC Box Culvert across National Highway and Reconstruction of road at Narasapura Industrial Area, Kolar Taluk & District
Construction of Box Culvert on Mehkar to MH Border via Kongli MDR Km 5.27 in Bhalki Taluka Bidar District.
construction of box culvert AT KM 48.50, KM 59.70 AND KM 63.90 On Supa Annigeri SH28 in Dharwad taluk
Construction of a Box culvert on Kakkeri-Bailur Road (MDR) at km 1.80 in Khanapur Taluk of Belagavi district.
RECONSTRUCTION OF DILAPIDATED BOX CULVERT AT KM 38.30 ON KUMTA KODAMADAGU SH -48 IN KUMTA TALUK UTTAR KANNADA DISTRICT
Construction of Box Culvert and Retaining Wall on Kalammana Gudi Road at Shirsangi Village in Saundatti Taluk Belagavi Dist.
Construction of Box Culvert at Buthakatanahalli to AP Border via Melkunte Huligere at Ch 10.70 Km in Sira Taluk
Construction of box culvert at km 0.70 of the road connecting Kunchur to E. Bevinahalli village in Harapanahalli taluk
Construction of Box Culvert on Ambewadi-Bemalkheda SH-163 at KM 73.31 in Chitguppa Taluka Bidar District. (UNDER KRDCL)
Construction of Box Culvert Near Hattaragi Indiranagar to Terani village road Near Nalla at Hattaragi Village in Hukkeri Taluka
Construction of VRCC box culvert across the NH-16 at Sheelanagar, W.No.69 of Gajuwaka Zone-VI of GVMC
Construction of Wing Walls to existing Box Culvert at Swarana Bharathi Nagar in Ward No.08 of Zone-II.
Construction of Box Culvert at km 1.10 near Govind Mule Land at Pratapur village in Basavakalyan Tq (CAT-1)
Construction of Box Culvert at KM 176.0 on Chikkahesarooru - Mudagal - Mundargi SH-129 in Koppal Constituency Kappal Taluk & District.
Construction of RCC Slab Culvert 6.00m vent in Kannadaasan Nagar Road in Adhanoor Village at Adhanoor Panchayat in Kundrathur Panchayat Union, Kancheepuram District Under MLA CDS Funds of the year 2021-22
Construction of Box culvert
(SH. C/o 4.00 Mtr Span RCC Slab Culvert at RD 20/940)Under PDNA
CONSTRUCTION OF CEMENT CONCRETE ROAD, RCC DRAIN, RCC HUME PIPE CULVERT, RCC OVER HEAD TANK, SUMP WELL, WATER SUPPLY WITH 02 NOS DRILLING OF TUBEWELL, WATER HARVESTING WORK AT INDUSTRIAL AREA VILLAGE PATEHARA TEHSIL HANUMANA DISTRICT MAUGANJ (M.P.)
Construction/Upgradation of road from Sheindra Old Bus Stand to Chamber Ward No 05 and 06 Panchyat Lower Sheindra by way of Providing and Laying WBM Grade-II and 900mm dia Hume Pipe Culvert,Surankote Under BDC Plan
Construction of road Sib Morh to Godhra Mori Loran,Mandi in Km 1st by way of balance Earth Work in Cutting,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert ,150mm thick WBM Grade-II.
Laying of stone pitching at slope portion above along light weight vehicle drain to protect erosion of slope portion from light pole no- 17 to 19 near single row Hume pipe culvert at light vehicle road under ROCP.
C/o Shivpur to Chamda road km 0/00 to 3/405 (SH -C/O 900 mm dia hume pipe Culvert at RD 2/090, 2/295, 2/520, 2/580, 2/870 and 3/365) under SCSP
Cleaning of hume pipe culvert and laying of RCC hume pipes and day to day cleaning of drains removal of muck along road side and other different locations before and during monsoon at Sasti OCM under Sasti Area
Construction of road Sib Morh to Godhra Mori Loran, Mandi in Km 1st by way of balance Earth Work in Cutting,Walling Providing and Laying of 900 /600 mm dia Hume Pipe Culvert ,150mm thick WBM Grade-II.
CONSTRUCTION OF CEMENT CONCRETE ROAD, RCC DRAIN, RCC HUME PIPE CULVERT, RCC OVERHEAD TANK, SUMP WELL, DRILLING OF TUBE WELL WITH WATER SUPPLY, WATER HARVESTING, EXTERNAL ELETRIFICATION WITH 5 MVA SUBSTATION WITH SOLAR STREET LIGHT AND PLANTATION WORK
CO Link road from Bangana Tathoon road to Bandu Brahmana. SH CO 900mm dia Hume pipe Culvert in km 0100 and 0185 alongwith wing wall and PL GSB WMM and MT in km 0/000 to 0/500
Jhansi Mirzapur road to Bendo Kotra Repnol Beehat road (ODR) ke Km. 10(200) me C.C. ka karya and Jamala Kilhua Bhatevrakala Gorhari (ODR) ke Km. 7 me 2x1200 mm dia NP3 Hume pipe culvert ka nirman karya
Construction of road Mohalla Bandiaya to Mohalla Jatta Baghuwalla via Moh. Sheikh road by way of balance Earth Work in Cutting ,Walling and Providing and Laying of 900mm dia Hume Pipe culvert and WBM Grade -II,Block NSSB
C/O Link road Bambyar Badyar to Galanaghat km 0/0 to 3/160 (SH C/O 900 mm dia hume pipe culvert along with wing walls at RD 0/050, 0/165, 0/420 and 0/725).