Loading…
Loading…
11,148 results • Best match
Providing Cement Concrete Pavement, Construction of Storm Water Drain and Culverts at Rajaganapathy Cross lane 2 in Division No. 10.
Z.O.XIV.C.No.E1/4880/ 2023 IMPROVEMENT WORKS FOR CULVERTS AT ELIM NAGAR 1ST MAIN ROAD IN DN-184,UNIT-41,ZONE-14.
Paravai Town Panchayat ,Construction of Storm Water Drain with Culverts at (Ward No.9) Ganthiji Street in Paravai Town Panchayat
Paravai Town Panchayat ,Construction of Storm Water Drain with Culverts at (Ward No.15) Muthuramaliga puram in Paravai Town Panchayat
Custom Bid for Services - CC017022 Provision of epoxy filled ceramic pad Cold Pad at pipeline support in culverts at CPCLManali
Re-Construction of Storm water drain, Culvert and RCC Culvert at Kovalan street and Kamaraj street in ward no. 33.
Constrution of SWD and Culvert of SWD and RCC Culvert at CP Avenue Main Road and Senthil Nagar Main Raod in ward No. 38.
15CFC UT 2025-26 Construction of RCC Culvert at Throupathi Amman road to Mahakali kadu west Junction culvert in ward 08 in Vedaranya Municipality.
Vellore District Construction of Culvert 3m span Culvert at Veerapanchalipuram in Karadikudi Panchayat in Anaicut Block Union General Fund 2025 -2026 Package no 07
Vellore District Construction of Culvert 3m span Culvert at AC Colony BG Road in Appukal Panchayat Anaicut Block NNT 2025-26 Package No 16
Urban improvement- Widening and Strengthening at km 45 0 45 4 Madurai- Kanniyakumari Road within Virudhunagar Municipality limit including reconstruction of box culverts at km 43 6 8 44 6 and 452 Construction of drain and providing paver blocks SHU33
Widening from Two Lane with Paved Shoulders to Four Lane and Strengthening at Km 5/2-9/075 of Perambalur Byepass Road including Widening of Box culverts,Construction of Retaining wall, Junction Improvements and Construction of Centre median(SHU-182)
Widening from Intermediate Lane to Two Lane and Strengthening at km 0.0 - 2.4 of Trichy-Chithambaram Road branching at km30.2 to kallakudy-Thapaippai Road including construction of protective wall at km 0.4, 1.4, 1.10 and 2.2 widening of box culverts
Wdg and Impts IRQP Constn of Box Culverts Constn of Retaining Walls Constn of RCC Drain and including Up Keeping for a period of 60 Months on Govt Roads in Tirupur North H C M Sub Dn Pac No 33
Construction of Drainage with Small Culvert From Palanisamy House to Pappa House in Sithayagoundanpatti Village at Eathakovil Panchayat under MLACDS 2025-2026
Widening from Single Lane to Intermediate Lane at km 5/4-7/4 of Ariyalur Thirukkai - Panamalaipettai road including Reconstruction Box culvert km 6/6,7/2 VPM-112
Wdg and Strengthening Constnof Box Culvert Constn of Drain and providing centre median works in Government roads in Tirupur H C and M North Sub Division TPR 020
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert and Construction of Protective Works in Omalur (H) CandM Sub Division (SLM-32)
Widening from intermediate lane to two lane and strengthening at of Kovilpatti-Ottapidaram-Pudukottai-Eral-Mukkani Road including Reconstruction of box culvert at and construction of Retaining wall
Improvements to Riding Quality Construction of Minor bridge and Reconstruction of Box Culvert on Government roads in Mettupalayam and Annur H C and M Sub Division CBE 049
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Box Culvert and Retaining Wall in Pennagaram (H) (CandM) Sub Division (SLM-105)
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert and Construction of Retaining Wall in Omalur (H) (CandM) Sub Division (SLM-16)
Junction Improvements, Widening and Strengthening, Improvements to Riding Quality and Construction of Box Culvert in the Government Roads of Anaimalai H, C and M Sub Division - CBE - 032
Wdg from Single Lane to Intermediate Lane and Stg Constn of Box Culvert and Providing Junction Impts Works in Gov Roads in Udumalpet H CandM Sub Dn TPR044
Improvements to Riding Quality, Stg and Constn of Box Culvert and Constn of Drain and Paver Block Works in Gov Roads in Karur H, CandM, Sub Dn TPR016
Widening and Strengthening, Improvements to Riding Quality including Reconstruction of Box Culvert works in Govt roads in respect of Mannargudi H C and M Sub Division TRY-82
Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 1/4 of Koopu -Melapatty Road including Reconstruction of Box Culvert at Km 0/2
Providing Junction Improvement at km 0/2 of Kattumailur-Adhiyur road (via) Maligaimedu road MD 1218 including Construction of Retaining wall and Reconstruction of Box Culvert-VPM-132
Widening and Strengthening, Paver work, including Reconstruction of Box culvert, Construction of Drain, Centre median, Retaining wall works in Govt. Roads in respect of Trichy H, CandM Subdivision
Urban Improvements - Strengthening at Km 0/0 - 1/2 of Pallikonda - Palamaneri Road including Reconstruction of Box Culvert at Km 0/10 and Providing Paver Block-TVM-133
Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Retaining Wall and Reconstruction of Box Culvert in Omalur (H) CandM Sub Division (SLM-53)
Wdg and Strengthening Improvements to Riding Quality and Constn and ReConstn of Box culvert works in Government Roads in Mulanur H C and M Sub Division TPR 026
Widening from Single Lane toTwo aneStrengtheningImprovements to Riding Quality, Construction of Minor Bridge including Box Culvert in Government Roads of Virudhunagar H C and M Sub Division TNV10
Widening from SL to IL Strengthening Impts to Riding Qty and Construction of Box Culvert in Govt Roads of Srivaikundam H C and M Sub Division TNV-32
Improvements to Riding Quality and Reconstruction of Box Culvert Construction of Retaining Wall works in the Government roads of Kamuthi Highways C and M Sub-Division MDU 119
Widening from Intermediate Lane to Two Lane and Strengthening at km 6/0 - 11/5 of Goonipalayam- Placepalayam Road including Construction of Box Culvert at Km. 9/2
Widening from Single Lane to Intermediate Lane and Strengthening, Improvements to Riding Quality, Reconstruction Of Box Culvert Works In Government Roads Vellakoil H CandM Sub division TPR 056
Widening from SL to TL and Strengthening at km 0.0 to 1.7 of Thippampatti Sellappampalayam road including Reconstruction of Box culvert at Km 0.2 1.2 1.8 CBE 050
IRQP ReConstn of Box Culvert and including Up Keeping for a period of 60 Months on Govt Roads in Dharapuram H C M Sub Dn Pac No 54
Widening and Strengthening from Intermediate Lane to Two Lane and Reconstruction of Box Culvert Works on Government Roads in Tirupur South H C M Sub-Division TPR 007
Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/4 of Koothampoondi -Ponnivadi Road including Reconstruction of Box culvert at km 1/2
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Reconstruction of Box Culvert and Construction of Retaining Wall in Mettur (H) CandM Sub Division (SLM-66)
Widening and Strengthening, Improvements to Riding Quality including reconstruction of box culvert works in Govt roads in respect of Aavudaiyarkovil (H) C and M Sub Division TRY 68
Providing Causeway near at Surplus weir, Retaining wall at Alangulam Tank Bund Approach road in Kuthukalvalasai Panchayat in Tenkasi Panchayat Union. in Tenkasi District under SFC DISTRICT PANCHAYAT 2024-25
Construction of High level Bridge at Km 0/6 of Perundalaiyur to join at Km 138/8 of Ooty - Kothagiri - Mettupalayam - Sathy - Gobi - Erode road in lieu of existing causeway.
Widening from Km 0/0-0/6 and Strengthening from Km 0/0 -9/0 including Reconstruction of culverts, Widening of culverts, Construction of Drains, and Bus Lay By in Krishnagiri - Kuppam Road NH-219 (New NH-42) in the state of Tamil Nadu on Engineering,
Construction of Culvert at Ward No 7 Arcot Road in Vilapakkam Town Panchayat.
Package 28 Improvements of Government roads in Kodaikanal Highways C and M Sub Division including Constriction of Retaining wall slab culvert side drain including Upkeeping for a period of 60 Months
Package76 Strengthening and Improvements Government roads in Thirumangalam H C and M SubDivision including construction of Retaining wall Widening RCC Slab culvert and including Upkeeping for a period of 60 Months
Package68 Improvements of Government roads in Kamuthi and Muthukulathur Highways CandM SubDivision including RCC slab culvert providing junction Improvements using plastic waste and including Upkeeping for a period of 60 Months