Loading…
Loading…
11,149 results • Best match
Construction of SW Drain and Culvert at Ward 9 Nandhavana Street
Construction of Rcc Culvert at Srinivasa Nagar in Ward no.57
Construction of RCC Culvert at Somanathpuram in Uthiramerur Town Panchayat.
Reconstruction of Small Culvert at Madhankovil Street in Sankarankovil Municipality
Construction of Culvert at Ward No. 11 Thayappa Thottam Rajakalvai in Hosur City Municipal Corporation
Construction of Strom water drain with RCC Culvert at New Busstand in Ilayangudi Town Panchayat.
Reconstruction of SWD with culvert at ward no 05 Kalungu street in Jambai town panchayat
Providing RCC Drain with culvert and cover slab to Reddy 1st and 2nd cross street
Construction of Storm water drain with Culvert
Construction of Storm Water Drain Culvert with RCC Culvert at Muneeswaran Koil Main Road, Muneeswaran Koil Cross Street, Muneeswaran Koil 2nd Cross Street and Muneeswaran Koil 3rd Cross at Ward No - 04 in Uthukottai Town Panchayat
Construction of strom water drain with culvert at Ward No 2 Mettu pillaiyar kovil street in Pasur Town Panchayat
Reconstruction of Culvert and Providing Retaingwall at Ward No 12 Adhi Dravidar Colony in Narasimmanaickenpalayam Town Panchayat.
Construction of Culvert in New Street H/O Pennagar panchayat In Thimiri Panchayat Union
Construction of Culvert in othavadai Street H/O Pennagar panchayat In Thimiri Panchayat Union
Widening and Strengthening from Intermediate Lane to Two Lane Improvements to Riding Quality Construction of Box Culvert and Junction Improvement Works on Government Roads in Krishnarayapuram H CM Sub Division TPR 018
Widening from Single Lane to Intermediate Lane and Strengthening at km 2/0-3/6 of Perumukkal - Kunnapakkam road including reconstruction of Box culvert at Km 2/6, 2/8 VPM-080
Widening and Strengthening Improvements to Riding Quality Construction and Reconstn of Box culvert Widening of Minor Bridge and Construction of Drain works in Bhavani H C and M Sub division TPR 005
Widening from Intermediate Lane to Two Lane and Strengthening Reconstruction of Box culvert and Construction of Retaining wall in the Government roads of Sulur H C and M Sub Division CBE 053
Widening of SL to IL Strengthening Construction of Minor Bridge Construction of Retaining wall and Reconstruction of Box culvert in Govt Roads of Tenkasi H C and M Sub Division TNV 33
PACKAGE 63 Widening and Strengthening Improvements to Riding Quality, Reconstruction of Box culvert including up keeping for a period of 60 months in Govt. Roads in respect of Thiruthuraipoondi H, CandM Subdivision.
Widening, Strengthening, Improvements to riding Quality including Reconstruction of Box Culvert and Construction of Centre Median and Protective wall works in the Government roads of Madurai Highways Cand M SubDivision MDU-055
Package-30 Widening, Improvements of Government roads in Vedasandur (Highways) C and M Sub-Division including CD work, Constriction of Retaining wall , Box Culvert , including Upkeeping for a period of 60 Months
Widening from IL to DL Strengthening Improvements to Riding Quality Construction of Minor Bridge including Reconstruction of Box Culvert in Government Roads of Ottapidaram H C and M Sub Division TNV 43
Strengthening at Km.1/750-3/435 of Kallikudi-Kottakudi (via) Soorampuli road including Construction of Protective wall at Km.2/8 and Reconstruction of Box Culvert at km.2/8,3/4
Widening Improvements Improvements to Riding Quality Reconstruction of Box Culvert CD Works and Construction of Protective Wall works in the Government roads of Thiruvadanai Highways C and M Sub Division MDU 021
Widening from Single Lane to Intermediate Lane and Strengthening at km 3.0 _ 5.650 of Pillaichathram Maduramangalam Road via Ramanujapuram Road including Reconstruction of Box Culvert at Km 3.6 3.8_ 5.2 and 5.4
Widening, Strengthening, Improvements to riding Quality including Reconstruction of Box Culvert, Construction of Well Protective wall and Toe wall works in the Government roads of Vedasandur (Highways) CandM Sub-Division (MDU-025)
Widening from Single Lane to Intermediate Lane and Strengthening at km 1/6 - 3/0 of Thalikkottai - Melathalikkottai road including Reconstruction of Box Culvert at Km 2/2, 2/8 TRY-77
Widening from Two lane to Two lane with Paved Shoulder, Improvements to Riding Quality and Reconstruction of Box Culvert in Government Roads of Ottapidaram (H) C and M, Sub-Division (TNV-62)
Widening Improvements Reconstruction of Box Culvert Construction of Retaining wall Well Protective wall CD Works and protective works in the Government roads of Vedasandur Highways C and M Sub Division MDU 008
Wdg from Intermediate lane to Two lane with paved shoulder and Stg Reconst of box culvert Reconst of minor Bridge works in Gov Roads in Krishnarayapuram H CandM Sub Dn TPR 010
Widening and Strengthening Improvements to riding quality Construction and Reconstruction of Box Culvert Construction of Retaining wall works in Government roads in Kangayam and Tirupur South H CandM Sub Divisions TPR 038
Widening from Single lane to Intermediate Lane, Intermediate Lane to Two Lane and Strengthening including Reconstruction of Box Culvert in Government Roads of Sathankulam H C and M Sub-division TNV-51
Strengthening, , Improvements to Riding Quality, Reconstruction of Box Culvert, Construction of Retaining wall , Drain works, Raising the Concrete Shoulder, Providing Paver Blocks in the Government roads of Bodinayakkanur Highways Cand M SubDivisionM
Urban Improvements, Widening from Single lane to Intermediate lane and Strengthening including reconstruction of box culvert, construction of drain, providing Median of Government roads in Aruppukottai H CandM Sub division TNV 19
Widening from Two lane to Two lane with paved shoulders and Strengtheningat Km 4by85by8 of Erode Thingalur road SH 173 including Reconstruction of box culvert at Km 5by2 5by4 5by6 TPR 029
Widening from Single lane to Intermediate lane, Strengthening, Improvements to Riding Quality and Construction and Reconstruction of Box culvert in Government Road of Aruppukottai H C and M Sub Division TNV 03
Providing CC pavement at Km.9/3 - 9/8 of Sattanathapuram - Thiruvenkadu - Melaiyur Road including Reconstruction of Box culvert at Km.9/4, 9/8 and Construction of Paver Block. TRY-85
Dismantling and Removing of Damaged RCC Culvert and Construction of New RCC Culvert and SWD at VRP Nagar 3rd Cross Street E S in ward No 17
Dismantling and Removing of Damaged RCC Culvert and Construction of New RCC Culvert and SWD at VRP Nagar 3rd Cross Street W S in ward No 17
Construction of SWD of size 1.20 x 1.20m at Ennore High Road(Lube Plant road, railway track Junction to culvert of culvert to zone 1 existing drain) in Div 38 Zone 4 Package 2
Construction of Culvert at Ward No.5 North Street West side, Ward No.5 Murugan Kovil,Ward No.11 Aadhidraviadar Burial shed,Ward no.1 Mela lethikulam,Keela Lethikulam in Moolaikaraipatti Town Panchayat
PACKAGE 38 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall, up keeping for a period of 60 months in Govt. Roads in respect of Peravurani, Pattukottai H, CandM Subdivision
Widening ,Strengthening, Improvements to Riding Quality including Reconstruction of CD works Widening the Slab Culvert,Construction of Protective works, and side drain works in the Government roads of Kodaikanal Highways CandM Sub Division MDU 026
Improvements to Government Roads Including Construction of Retaining Wall, Reconstruction of RCC slab Culvert and up keeping the roads for a period of 60 months in Pennagaram (H) C and M Sub Division (Package 65)
Construction Of Storm Water Drain and Culvert to Gangai Amman Koil street at ward No 08 in Thirukalukundarm Town Panchayat Chengalpattu Distrrict.
Construction of Culvert at Ward No.5 Sandhai Nagappa Road Cross, Aratnavayal Vaari Murugan house to Kumar house in Arimalam Town Panchayat
Reconstruction of Drain and Culvert at Ward No.15 Senpagam Garden and Krishnapuram Main Road Near Nila Garden in Idigarai Town Panchayat.
Construction of Culverts across Canal at Annai Nagar Main Street and at the entrance of M.Pudhupalayam 2nd Cross Street in Ward No.60.
Construction of RCC Retaining wall at (Kundiyamallur side and Poovalai side) under the main work of Construction of High level bridge at Km.1/8 of Kundiyamallur Poovalai Road in lieu of existing causeway