Loading…
Loading…
2,405 results • Best match
Improvements to Nallathanneer Kulam in Paiyambadi Colony at Peruveli Panchayat.(with Desilting, Revetment, Steps, Bathing ghats, Baby pond, Inlet Outlet channel) in Madhuranthagam Block, Chengalpet District Under AGAMT 2023-24
Rejuvenation of Vayalveli Kulam (Desilting of Pond, Construction of Bathing ghat ) in Kadambai Old Colony at Kadambai Panchayat (Survey No.97/4) at Thellar Block Under AGAMT II 2025-2026
Desilting And Providing Top Slab To The Side Drain at Bharathi Nagar Extn 2nd cross street Part and Bharathi Nagar 1st Street in part Division-84, Unit-19, Zone-7.
Proposed annual maintenance works of Dewatering, Desilting, Clearing water courses and removal of bushes/debris etc in Limited Use Subways in ADEN DG section for the period of One year
Rejuvenation of Drowpathyamman kovil kulam with Desilting construction of inlet and outlet and Bathing ghat lining wall at Sembur Panchavat of Vandavasi Block Thiruvannamalai Dist- AGAMT II (V.Pt) -2023-2024
Work No 09 Desilting of Alli Pond Construction Bhathing Ghat Inlet and Outlet in Manalmedu at Vishnampettai Panchayat of Budalur Block in Thanjavur District under AGAMT II 2023-2024 Tranche
Krishnagiri District Thally Block under AGAMT 2022_2023 Desilting of Mottan Eri Inlet and Outlet and Construction of New Surplus weir at Gurubarapalli in Ballapalli Panchayat Package No TN TLY-0012
Removal of weeeds, vegetations and desilting from Kilkattalai surplus course upto Narayanapuram tank by using floating machinery, conveying and dumping the removed materinals outside in Pallavaram Taluk of Chengalpattu District
Custom Bid for Services - CPCLK24464 Desilting of baby canal outside CPCL boundary between watch tower 15 and Manali high road Similar Category Operation And Maintenance Of Other Machines And Plants
Rejuvenation of Gowndan Kulam, Desilting and deepening, Bathing Ghat, retaining wall, baby pond and steps at Pudupattu Panchayat (Survey No 186) in Pudupattu Panchaya AGAMT - II 2021-22 Kaveripakkam Block, Ranipet District
Source improvement work - Desilting of Infiltration Well, Laying of cables with encasing at Headworks under CWSS TO 35 Habitations in Solasiramani, Sullipalayam, Kupricapalayam and Perunkurichi Panchayats in kabilarmalai Union in Namakkal Dist
Rejuvenation of Pallathiamman Kulam with Desilting construction of inlet and outlet and Bathing ghat lining wall near ADC Kilnarma Panchavat of Vandavasi Block Thiruvannamalai Dist- AGAMT II (V.Pt) -2023-2024
Desilting, Removal of Water weeds and floating materials in Navalur Surplus Course, Kazhipattur Maduvu and Katrampalli Surplus Course by using poclain machinery, Tippers andLabourers in Thirupporur Taluk of Chengalpattu Distric
Outsourcing of Workers for Desilting of Drain for Zone No 1 2 3 4 on a temporary contract basis for a period of 3 months in Tiruppur City Municipal Corporation
Desilting of Storm water Drain , Providing manhole doors ,Ductile Iron Grating and painting of manhole doors and Silt Catch pit at Various locations in in Div-131,132,134,135 Unit-31, Zone-10
Desilting of open well and Providing water supply arrangements at Thiruvoudal street and providing CC Pavement at Drainage Sandhu,Repair Work at ICDS Center at Anaikatti street in Tiruvannamalai Municipality
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Eri and Strengthening of bund and New weir construction 3 works at MADAKKAL Panchayat Package No TN-04-KRI-310
Salem District - Panamarathupatti - Desilting of Openwell, Revetment wall, New Motor erection works and Sintex tank in Kallikottai Nayakkar street Openwell. H/O E.Vaniyambadi - 15th Finance Commision Fund (Block Panchayat) 2020 - 2021
Desilting and construction of revetment steps bathing ghat baby pond inlet and out let channel to Kanniyamman Koil Kulam in Mettupalayam in Arayapakkam Panchayat at Maduranthagam Panchayat Union in Chengalpattu district
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Kuttai and Strengthening of bund and New weir construction 4 works at Anchetty Panchayat Package No TN-04-KRI-292
Rejuvenation of Chetty kulam with Desilting construction of inlet and outlet and Bathing ghat lining wall at Edayanthangal in Nambedu Panchavat of Pernamallur Block Thiruvannamalai Dist- AGAMT II (V.Pt) -2023-2024
Rejunuvation of Periyannan Kulam Desilting Earthwork , Baby pond Linig wall(60.00m), Retail wall(56.20m) intlet Outlet Bathing ghat At Nallanpilaipetral panchayat (16.00 16.00) In Tiruvannamalai Block Under AGAMT II 2023-24
Improvements to Atthimanam Colony Sivan Koil kulam in at Kallapiranpuram Panchayat(with Desilting, Revetment, Steps, Bathing ghats, Baby pond, Inlet Outlet channel) in Madhuranthagam Block, Chengalpet District Under AGAMT 2023-24
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Eri and Strengthening of bund and New weir construction 2 works at PALAYAMKOTTAI Panchayat Package No TN-04-KRI-322
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Kuttai and Strengthening of bund and New weir construction 3 works at Kottaiyur Panchayat Package No TN-04-KRI-298
Rejuvenation of Chetty kulam with Desilting construction of inlet and outlet and Bathing ghat lining wall in ADC at Injimedu Panchavat of Pernamallur Block Thiruvannamalai Dist- AGAMT II (V.Pt) -2023-2024
GCC Z.O.1.C.NO.B2/0508/2023. PROPOSED FOR DESILTING OF STORM WATER DRAIN AT BALAKRISHNA NAGAR 1ST MAIN ROAD , THIRUVALLUVAR STREET AND VARIOUS STREET IN DIVISION-7,UNIT-02,ZONE-01.
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Eri and Strengthening of bund and New weir construction 3 works at AGALAKOTTI Panchayat Package No TN-04-KRI-304
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Eri and Strengthening of bund and New weir construction 3 works at Doddamanchi Panchayat Package No TN-04-KRI-280
Salem District - Konganapuram Block - Rejuvenation and Desilting of Ayithakuttai eri (Vagugappati Eri) H/o Katchupalli Panchayat - (Mi Tank ) State Fund- 2024-2025 Phase - II - Financial Year - 2025- 2026 Package No.04
Desilting of Subway collection well and engaging electrical cum pum operation and diesel motor repair work at Rangarajapuram Two Wheeler at Rangarajapuram Main Road in Div-132, U-31.Z-10
Proposed Desilting of Wells in Marina Service Road and Fixing of 10 HP Submersible Motor pump in well for water filling point in Div-114,116 and 120, Unit-27A, Zone -9
DESILTING TO THE STORM WATER DRAIN AND MAN HOLE DOOR, SILT CATCH PIT AT APPADURAI 2ND STREET, PONNUSWAMY STREET, DURAISWAMY STREET AND VARIOUS STREET IN DIVISION-96, UNIT-21, ZONE-08.
Desilting of Storm Water Drain and Side Drain Minor Repairs Replacement of Machine Holes and Slit Catch pit Colouring of Lids at Various Streets in Dn 148, Unit 33, Zone 11
Desilting of Storm Water Drain and Side Drain Minor Repairs Replacement of Machine Holes and Slit Catch pit Colouring of Lids at Various Streets in Dn 145, Unit 33, Zone 11
Desilting of Storm Water Drain and Side Drain Minor Repairs Replacement of Machine Holes and Slit Catch pit Colouring of Lids at Various Streets in Dn 152, Unit 33, Zone 11
Desilting and removal of floating materials and Hyacinth from Virugambakkam Canal by hiring Poclain and Tippers for a period of one month 8 hrs working per day Zone 8 and 9
DISMANTLING EXISTING TOP SLAB, DESILTING OF DRAINAGE AND PROVIDING NECESSARY BRICK WORK AND RELAYING NEW TOP SLAB WITH MANHOLE COVER AT BHARATHIPURAM 2ND STREET IN DIVISION-102, UNIT-22, ZONE-8
Desilting and removal of floating materials and Hyacinth from Virugambakkam Canal by hiring Poclain and Floats and Tippers for a period of one month 8 hrs working per day Zone 10
Repair work and Desilting of SWD at MRTS Railways Road From Junction of Bharani Street to Balakrishna Nagar Main Road (South Side) in Divsion-178, Unit-39, Zone-13(Re-Tender)
Desilting of existing storm water drains , replacing of damaged manhole doors and painting to the Manhole doors and silt catchpit doors at various streets in Div-58 Unit-14, Zone-5
Krishnagiri Dt Mathur Block AGAMT II 2023-24 1 work for Desilting and Construction of Retaining Wall length 30m at Pallathur Annanagar Kuttai Nagampatti Panchayat Package No 2023-24 MTR 19
Desilting, Deepening and Strengthening of Nedungulam Kanmai at Illuppaiyurani Panchayat at Illuppaiyurani Panchayat in Kovilpatti Panchayat Union of Thoothukudi District under CSRF Scheme Package No. TN/TUT-01/2020-21 CSRF
Krishnagiri DT - AGAMT II 2021-22 - Hosur Block - Desilting of MI Tanks and repairs to sluice and weir at Thorapalli Agraharam, Nagondapalli and Kolathasapuram Panchayats - 4 works - TN-04-KRI-438
1.Desilting of Pudhukudi Pidari kulam 2. Construction of Threshing Floor at Neikunnam in 101, Pudhukudi Panchayat Kodavasal block Tiruvarur Dt Under the Scheme of AGAMT II 23-24-Package 1
Desilting the existing drain at CMC Colony Ansari Street, Annapoorna Layout, Sathyamoorthy Road and VKK Menon Road from Jaya Bakery to Thiruvalluvar Bus Stand Near in Ward No. 67, Central Zone
Salem District - Pethanaickenpalayam Block - DESILTING AGAMT POND SUPPLY AND FLOW CHANNAL REPAIR IN RAJAVANTHAN KUTTAI AT UTHANGARAI H/O WEST RAJAPALAYAM in AGAMT - II - 2022-23 SLM- PNP-01/2022-23
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Eri and Strengthening of bund and New weir construction 2 works at JAWALAGIRI Panchayat Package No TN-04-KRI-316
Krishnagiri District Thally Block Under AGAMT II 2021-22 Desilting of Kuttai and Strengthening of bund and New weir construction 3 works at Natrampalayam Panchayat Package No TN-04-KRI-286
Krishnagiri Dt Mathur Block AGAMTII 2024-25 2 works of Desilting and repair of Thangamma Eri at Kottur andCC Pavement at Gandhinagar Kodamandapatti Village in Kodamandapatti Panchayat Package No MTR 44