Loading…
Loading…
11,202 results • Best match
TN 05/EE/2023-24 SILT CLEARANCE OF INTERNAL SECTION RIGHT JOLLY DY. FROM KM. 0.000 TO KM. 15.000 (Lot-1)
Estimate for Jungle Clearance and Bed and Berm Scrapping and Silt Clearance from Km.0.000 to 19.200 of Ranipur Main Canal
03/EE/2022-23 Silt Clearance of Internal Section of Right Bhola Dy. from km. 0.000 to km. 18.302 (Lot-15)
Silt Clearance of Newada Mr from km 0.000 to km 4.110 and Reuna mr from 0.000 to km 3.820 Lot-14
Estimate for Jungle Clearance and Bed and Berm Scrapping and Silt Clearance from Km.0.000 to 7.200 of Pachwara Main Canal
Silt Clearance of Mawaijar Mr (km. 0.000 to 4.200) Rigaura Mr (0.000 to 4.500) and Vidokhar Thokpurai Mr(0.000 to 2.000)
SE FOR SILT CLEARANCE OF SOI MR FROM KM 0.000 TO KM 9.030 AND BANAIL MR KM 0.000 TO KM 4.630
Silt Clearance of Rasulpur Mr. From Km. 0.000 to 5.630 and Tilan Mr. From Km. 0.000 to 3.620 (Lot No. 04)
Retender Lot No. 8 Jungle and silt clearance of Nandi Minor from km 0.000 to km 8.700 of Ohan canal system.
Silt Clearance of Jarar Mr From Km 0.000 to Km 1.182 and Manipur Mr Km 0.000 to Km 2.500 Lot-6
Silt Clearance of Bisandi Mr From Km 0.00 to Km 4.300 and Rachha Mr Km 0.00 to Km 2.300 Lot-20
TN 05/EE/2023-24 SILT CLEARANCE OF INTERNAL SECTION OF SUHANA MINOR FROM KM.0.000 TO KM. 7.551(Lot-27)
Scraping Internal Section from km 0.000 to km 15.600 and Silt Clearance from km 15.600 to km 17.800 of Deegh Dy.
Silt Clearance of Gureh Mr From Km 0.000 to Km 4.382 and Bisra Mr Km 0.000 to Km 1.500 Lot-10
Earth work in silt clearance of Jarwal Drain No-91 from Km. 0.000 to Km. 7.000 for the year-2024-25
Silt clearance of Beera Dy from km 10.200 to km 15.400 and Pannah Mr from km 0.000 to 4.000 Lot-25
E/W in silt clearance/Remodelling of Sikariha Singhahi Tal Drain-74 from Km. 0.000 to Km. 5.750 in District Bahraich.
S/E for Silt Clearance of Moonj Mr. from Km 0.000 to Km. 9.450 for the year 2022-23(Rabi-1430)
03/EE/2022-23 Silt Clearance of Internal Section of Right Jolly Dy. from km. 37.347 to km. 47.876 (Lot-4)
S/E for Silt Clearance of Baralokpur Mr. from Km 0.000 to Km. 12.872 for the year 2022-23(Rabi-1430)
E/W FOR SILT CLEARANCE / SCRAPING OF SIKANDARPUR DY. FROM KM 10.000 TO KM 19.000 and KM 21.000 TO KM 24.000
Earth work in silt clearance of Sahora minor from km 0.000 to 3.680 and Teriya minor 0.000 to 3.027 (Lot-10)
Silt clearance of Rampur pratham Mr. FROM Km. 0.000 TO km. 3.95 and Kanupur Mr. FROM Km. 0.000 TO km. 2.842
ESTIMATE FOR SILT CLEARANCE OF MAHEWA DY FROM KM 3.415 TO KM 12.470 AND WAZIDPUR DY FROM KM 3.821 TO 13.150
Silt Clearance of Bhadwari Mr From Km 0.000 to Km 3.700 and Mantha Mr Km 0.000 to Km 3.700 Lot-6
S/E for Silt Clearance of Udhan Mr. from Km 0.000 to Km. 8.045 for the year 2022-23(Rabi-1430)
Silt clearance of Saaya Mr from km 0.000 to km 2.900 and Sathi Mr from km 0.000 to 3.700 Lot-1
Surface miner trans-port road mainte-nance rain cuts, silt removal etc supplying and laying of stone aggregates at Krishnashila Project
Silt removal between km 0.000 to 1.950 of Jamapur Mr and km. 0.000 to km. 3.441 of Khanpur mr. (LOT-02)
Silt removal between km 0.000 to 1.981 of Tindwara Mr and km. 0.000 to km. 1.650 of Badokhar mr. (LOT-06)
Silt removal between km 0.000 to 3.009 of Pahadpur Mr and km 0.000 to km 2.295 of Tarkhari Mr. (LOT-01)
Silt removal between km 0.000 to 1.182 of Jarar Mr and km. 0.000 to km. 2.500 of Manipur mr. (LOT-05)
silt removal Between km 0.000 to km 1.981 of TindwaraMr. and km 0.000 to km 1.650 of Badokhar mr. Lot-6
Silt removal between km 0.000 to 2.780 of Khohi Mr , km. 0.000 to km. 4.600 of Garhi chandpur mr . (LOT-12)
Silt removal work for medium and large drains located in all wards within the municipal area of Nagar Palika Parishad Sitapur
Work of silt removal situated on the right/left bank of the Mathiya Branch between km 0.000 and km 0.550.
Work of silt removal situated on the right/left bank of the Mathiya Branch between km 0.550 and km 1.100.
Work of silt removal situated on the right/left bank between km 1.100 and km 2.000 of the Mathiya Branch.
Work of silt removal situated on the right/left bank of the Chaf Branch between km 13.000 and km 13.400.
Work of silt removal situated on the right/left bank of the Mathia Branch between km 8.300 and km 9.650.
Work of silt removal situated on the right/left bank between km 9.300 and km 9.700 of the Chaf Branch.
Work of silt removal situated on the right/left bank of the Chaf Branch between km 12.200 and km 12.600.
Work of silt removal situated on the right/left bank between km 13.400 and km 13.800 of the Chaf Branch.
Work of silt removal situated on the right/left bank between km 4.300 to km 4.700 of the Chaff Branch.
Silt Clearance/Correcting internal section of Aurangpur Hazi Dy. from Km. 0.000 to 5.900 for (Kharif Fasli 1431) Year 2023-24.
Silt Clearance/Correcting internal section of Asadpur Dhamrola Mr. from Km. 0.000 to 7.150 for (Kharif Fasli 1431) Year 2023-24.
Dredging work with leveler karha in river Ghaghra at Lolpur, Distt- Basti.
Following Machines/Equipment will be hired for dredging (digging) earth/sand for channelization work by dredging for protection of left bank of River Ganga Near Village-Dubey Chhapra Distt.-Ballia.
Silt Clearance Correcting internal section of Aurangpur Hazi Dy. from km. 0.000 to km. 5.900 (Rabi Fasli 1432) year 2024-25.
Silt Clearance/Scraping of Shekhupura Dy from km. 0.000 to km. 34.600 for Rabi 1433 Crop for the year 2025-26.