Loading…
Loading…
11,202 results • Best match
Earth work in silt clearance of Bhakrauli Mangeshpur Drain No-86 from Km. 1.600 to Km. 10.000 for the year-2024-25
LOT 01 SILT CLEARANCE OF SUPPLY CHANNEL BETWEEN KM 0.00 TO 4.800 IN DISTT. BIJNOR FOR RABI 1433-F-YEAR 2025-26
SILT CLEARANCE OF FULLI MINOR FROM KM 0.000 KM 1.6000 AND BED AND SIDE SLOPE SCRAPING FROM KM 1.600 TO KM 2.600
Jungle Cleaning, Removal of Sewar and Silt clearance in Teer Dhumai Minor from Km 0.000 Km 5.180 in District Chitrakoot Lot 2
Estimate for Silt Clearance of Bahudakala Minor from Km. 0.00 to Km. 3.000 and Bedaroo Minor from Km. 0.00 to Km. 3.000
Silt clearance of Jarohra Mr from km 0.000 to km 4.000 and Shahpur Mr from km 0.000 to km 3.400 (LOT-12)
Silt Clearance of Augasi Mr from km 0.000 to km 4.200 and Bakal mr from km 0.000 to km 2.500 Lot-8
SILT CLEARANCE INTERNAL SECTION OF LEFT DARIYAPUR Mr. FROM KM 0.000 TO KM 4.800 AND AGWAL Mr. KM. 0.000 TO KM. 1.200.
Silt Clearance/Scraping of barela mr Km. 0.00 to 7.04 km for Rabi 1432 fasli in District Hardoi for Year 2024-25
Silt Clearance of Malauli Dy From Km. 0.000 to Km. 4.800 and Tikaniamau Minor From Km 0.000 to Km 2.000.(Lot-10)
Earth work in excavation/silt clearance of correcting internal section of magravan Drain From Km. 0.000 to 4.000 with partial/roughly dressing .
Silt clearance of Chatsara Mr rom km 0.000 to km 4.900 and Anathuwa Mr from km 0.000 to km 3.400 Lot-03
Silt clearance of Kumedha Mr from km 0.000 to km 3.000 and Gujaini Mr from km 0.000 to km 2.800 (LOT-09)
Silt Clearance /Scraping of Tumurki DY from Km. 0.000 to 10.450 km for Rabi 1431 Fasli in District Hardoi Year 2023-24
Earth work in excavation/silt clearance of correcting internal section of basila Drain From Km. 3.00 to 4.00 with partial/roughly dressing
SILT CLEARANCE OF RASRA DRAIN FROM KM 0.000 TO KM 8.500 WITH ROUGH DRESSING AND DISPOSAL INCLUDING ALL LEAD AND LIFT ETC
Silt clearance of Palhari Mr from km 0.000 to km 3.800 and Motiyari Mr from km 0.000 to km 1.500 Lot-3
Silt Clearance of Gauriakala Minor from Km. 0.00 to Km. 5.500 and Suriamau Minor from Km. 0.000 to Km. 3.500.(LOt-04)
Earth work in excavation/silt clearance of correcting internal section of uttarganwa Drain From Km. 0.00 to 5.500 with partial/roughly dressing
silt clearance between k.m 0.000 to km 1.500 of Gaurshivpur Mr and k.m 0.000 to km 1.900 of Risaura Mr. Lot-01
Silt clearance of Andaura Mr from km 0.000 to km 4.030 and Mamsi Mr from km 0.000 to km 2.200 (LOT-02)
Jungle clearance,silt clearance and scrapping of Mahari Mr. from K.M 0.00 to 3.520 and Samaspur Mr. 0.00 to 3.750 ( Lot 18 )
Silt Clearance of Fatpurva mr from km 0.000 to km 3.400 and Semra mr from km 0.000 to km 3.800 Lot-47
silt clearance between k.m 0.000 to km 7.600 of Jamnipur Mr and k.m 0.000 to km 8.000 of Kamnaudi Mr. Lot-07
Silt clearance from Km. 0.000 to Km. 4.382 of Gureh Minor and Km. 0.000 to Km. 1.500 of Bisra Minor (LOT-09)
SE FOR SILT CLEARANCE FROM INTERNAL SECTION OF MUKUTGADI MINOR KM 0.0000 TO 1.900 AND HASANPUR MINOR FROM KM 0.000 TO 2.000
Silt clearance of Jarohra Mr from km 0.000 to km 4.000 and Shahpur Mr from km 0.000 to km 3.400 Lot-1
Earth work in excavation/silt clearance of correcting internal section of rachanpatti Drain From Km. 0.000 to 14.000 with partial/roughly dressing
Earth work in silt clearance and Bank strengthening of Khilachi Drain from Km 6.000 to Km 7.700 in Shahabganj Block, District- Chandauli.
ESTIMATE FOR SILT CLEARANCE OF HARDOI DY FROM KM 3.800 TO KM 11.770 AND DADON DY FROM KM 3.000 TO KM 10.460
SILT CLEARANCE AND SCRAPING DAULA, BED, INNER SIDE SLOPE SCRAPING and RIGHT BANK FROM KM 0.000 TO KM 4.000 OF HARDO DY.
Silt removal between Km. 0.000 to Km. 9.410 of Pataura Minor and Km. 0.000 to Km. 1.900 of Tera Minor Lot-35
silt removal Between km 0.000 to km 2.780 of Khohi Mr, km 0.000 to km 4.600 of garhi chandpur Mr. Lot-4
silt removal Between km 0.000 to km 1.950 of Jamapur Mr. and km 0.000 to km 3.441 of Khanpur Mr Lot-2
silt removal Between km 0.000 to km 4.382 of Gureh Mr. and km 0.000 to km 1.500 of Bisra Mr. Lot-7
silt removal Between km 0.000 to km 1.182 of Jarar Mr. and km 0.000 to km 2.500 of Manipur mr Lot-5
SILT CLEARANCE OF KUDHENI MR, FROM KM. 0.000 TO 5.330, TRILOKPUR MR. FROM KM. 0.000 TO 2.010, GANGAGARH MR. FROM KM. 0.000 TO 1.750, SILHARI MR. FROM KM. 0.000 TO 2.020, RAMVAS MR. FROM M, 0.000 TO 0.800
Silt clearance of Pausra dy. From Km 13.700 to 17.000 and Scraping work from Km 17.000 to Km 32.000
Following machines / equipment will be hired for dredging (digging) earth/ sand for Channelization work by Dredging for the Protection of left bank of river Ghaghara Near Katariya Chandpur bund Distt-Basti
Dredging work in Overflow Lagoon at NTPC Rihand for the year 2026-27.
Dredging works in the Ganga river at Suction side of Dalmau Pump House
LOT-23 Silt clearance/scraping of Chandpur Mr. from Km 0.00 to Km 9.000 for Rabi 1432 crop for the year 2024-25
SILT CLEARANCE /SCRAPING OF TUMURKI DY FROM KM. 0.000 TO 10.450 KM. FOR RABI 1433 FASLI IN DISTRICT HARDOI FOR YEAR 2025-26.
LOT-02 ESTIMATE FOR JUNGLE CLEARANCE, BED AND BERM SCRAPPING AND SILT CLEARANCE WORK OF RANIPUR MAIN CANAL AT KM. 19.200 TO 56.000
SILT CLEARANCE IN BUDHANA DY. FROM KM. 0.000 TO KM.10.540 AND CHHITAUNA DY FROM KM.0.000 TO KM 6.600 ( LOT NO 07)
Silt Clearance/Scraping between Km. 0.000 to Km. 1.600, Km. 2.400 to Km. 5.000 and Km. 5.700 to Km. 9.170 of Dilawalpur Dy.
Silt Clearance of Jalla Minor- 2 (K.M. 0.00 to 3.60) Umari Minor 3 (K.M. 0.00 to2.50) Bharkhari Minor 1 (K.M. 0.00 to 3.00)
SILT CLEARANCE OF AURANGABAD DY FROM KM 0.000 TO KM 3.700, KM. 19.800 TO KM. 21.839 AND SCRAPING KM. 28.500 TO KM. 31.200
LOT-40 (RETENDER) Correcting internal section/silt clearance of Gohawar Mr. from Km. 0.000 to 5.335 for (Kharif Fasli 1428) Year 2020-21.
Silt Clearance/Scraping of Aigawan Dy from Km. 0.00 to 18.600 km for Rabi 1432 fasli in District Hardoi for Year 2024-25