Loading…
Loading…
12,290 results • Best match
Fencing work of 2400 Rft using PCC Fence posts and B.A.Wire in Co. No 59/K (Chikhrialla Draman) in Kandi Range (Avenue)
Fencing using PCC fence post and raising of PB plants in Bikhryan Nursery under CAMPA Addl CA for the year 2024-25
Fencing work using wooden fence post with BABW, Construction of DRSM check walls and Construction of inspection path under CAMPA 2022-23
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
Construction of Fencing using Square PCC Fence Posts G.I Barbed Wire 5 Strands with 2 Criss Cross at RDF Co.94a H Noorpur Poonch
Providing and fixing of Chain Link fencing, pit planting with Broad leaved plants 6744 Nos, MFP patch sapling 5620 Nos and Walking trail path, Anantnag Forest Division for the year 2022-23.
Construction of Office Building of the Tehsil Bahu at Chowadhi Jammu by way of providing and fixing of Chain link fencing of Boundary area (Under Capex Budget 2022-23) (Land Reforms Sector)
Constt of Testing lab cum J.E Quarter, Chowkidar Quarter Cum Chemical Shed, Sluice Chambers, Chain Link Fencing, Lavotary Block and Development of Sump Premises for WSS Peripheral Perihaspora under JJM part 2nd
Const incl successful testing and comm of 0.030 MGD SSFP and 0.15 lac Gallon Capacity RCC SR with sluice chamber, construction of PST, Bathroom, chain-link fencing , intake/ collection chamber WSS Weaven
Construction of 01 No. 30000 Glns Sump tank, 01 No. Pump Room Building, 01 No. Boundary wall, 01 No. Chain Link fencing and pipe laying and allied works under WSS Sadoh (JJM)
Contract for Providing of reliable and un-interrupted Power Supply during Shri Amarnath Ji Yatra 2024 BWO Construction of cement Concrete foundation for DG Set including Chain link Fencing of Sub-Stations
Erection of Chain Link Fencing 1750 rft on Entry Point of KHANP in Co 29fD Nanth Nallah Dacchan under Mitigation plan of KHANP Wildlife Chenab Division Kishtwar for the year 2021 22
Construction of Chowkidar Quarter Chain link fencing 63KVA Sub Station, HT-LT line at Pancheri (Creation of 63 KVA Sub-Station HT LT line for Eco Log Huts Cafeteria at Pancheri). CNO80
Development of Multipurpose Play Ground at Pyt. Nangali by way of Good Earth Filling and Protection work with Chain Link Fencing and Change Room .Under Capex Budget 2023-24 Accord No 01
Erection of Chain-Link Fencing Having 6 ft Height with concrete Toe Wall at Front Side in compartment 183/H of Haveli Range of Poonch Forest Division for the year 2021-22
Construction of Park including Chain Link Fencing 4x4 inches mesh size both sides seasonal plantation at Hiranagar Morh at RD 55800M and Gurha Baildaran at RD 54800M along MRC on irrigation land
Providing and Fixing of Chain Link Fencing with Angle Iron Posts in Cement Concrete Blocks and Construction of Water Harvesting Structure in Compt. 3/Khad at Bosian, Doabgah Range. J.V. Forest Division.
Erection of Chain Link Fencing 1750 rft on Entry Point of KHANP in Co 24cD Kiyar Nallah Dacchan under Mitigation plan of KHANP Wildlife Chenab Division Kishtwar for the year 2021 22
Construction of women Battalion Headquarters at Pargalta , Jammu(Balance Work) by way of External water supply ,Development of paths, Fixing of Internal sanitary fixtures, Chain link Fencing and lawn Development ( C.No 62)
Retrofitting of Water Supply Scheme Tilawari Thajal by way of Construction/Commissioning and Testing of Intake Chambers Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Balance work for laying and fitting of Pipe Distribution work, Construction of operators Quarter, Chain Link Fencing , repairing of RCC Dome for 0.50 lac gallons existing OHT FOR WSS. Vijpara under JJM
Construction incl successful testing and commissioning of 0.30 lac Gallon Capacity RCC SR with sluice chamber, construction of protection wall, chain-link fencing, intake/ collection chamber and Bathroom for WSS Dardgund Hartang
Construction including successful testing and commissioning of 02 No 0.20 lac Gallon Capacity RCC service reservoir with sluice chamber, construction of chain link fencing, intake/ collection chamber and Bathroom for WSS Bazipora
Construction incl successful testing and comm. of 0.40 lac Gallon Capacity RCC SR with sluice chamber, construction of Chowkidar Quarter, Bathroom , Approach Road, chain-link fencing, intake/ collection chamber for WSS Watrina
Fabrication and fitting of chain link fencing along the TPH boundary along with roof top and fabrication and fitting of MS railing at identified vulnerable spots and allied works (gate, sedimentation tank)
Providing and Fixing of Chain Link Fencing with Angle Iron Posts in Cement Concrete Blocks and Construction of Water Harvesting Structure in Compt. 27/Bla at Dudbug, Baramulla Range. J.V. Forest Division.
Laying/ Fitting of pipes, Construction of 0.55 lac gallons S.R, collection chamber, 3no sluice chambers , chain link fencing, Chowkidar quarter,Retaining wall/ bridge over nallah crossing and Road restoration WSS Kawpora Tchimmer
Laying and Fitting of Pipes, Construction of 0.32lac Gallon SR, Pump House cum Operators Quarter, Sluice Chamber, Chain Link Fencing, , Chowkidar Quarter, wodden roof truss to existing pump house WSS GUNDMANCHER (JJM)
Laying/ Fitting of pipes, Construction of 0.3 lac gallons S.Rs (2Nos) , 03 no. sluice chambers , chain link fencing, Anchor Blocks, Chowkidar Quarter, protection works, intake works , RCC Jacketting WSS Magray Mohalla Watoo
Construction of 2 No 0.40lac Galloons SSFP,02.No Sluice Chamber ,,Chain Link fencing around various structures and laying fitting , Supply main, Sub main and distribution system for WSS Dragmullah under JJM
Laying fitting of pipes, constt of service reservoir, chain link fencing, anchor block, intake chamber and channel, sluice chamber, crate bund and retaining wall for WSS MUGHAL MOHALLA KHAN MOHALLA under JJM
Construction of Water Supply Scheme Bandi Machikrand by way of Construction/ Commissioning and Testing of Intake Chambers Protection works, , Chain Link fencing providing and laying of GI Pipes and other allied works
Providing Laying and Fitting of HDPE GI pipes construction of Chain link fencing construction of Anchor blocks for Raw Water Main and improvements to existing pipe network for WSS Poshker under NABARD
Laying/ Fitting of pipes, Construction of 0.25 and 0.2 lac gallons S.Rs, 03 no. sluice chambers , chain link fencing, inspection hut, Saddle/ Anchor blocks and Collection Chamber WSS Humpathri Sarbadri under JJM
Construction, Testing and Successful Commissioning of SSFP 01 No. 2000GPH Cap., 04 Nos. 1000GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Gaddi B under JJM (JKSSR 2020)
Avenue plantation/Strip plantation at Sainik Colony Sec-G Ext Sunjwan Range using mesh wire fencing 1400 RFT and Planting of 900 Poly bags raised saplings in staggered pits of size 45x45x45 cm
Mesh Wire fencing Using PCC Square Post alongwith Plantation of saplings including BUC for three years, in Co. 31/D, Sunderbani Range, Nowshera Forest Division for the year 2026-27 under CAMPA (CA).
CONSTRUCTION OF FILTERATION GALLERY FOR NATURAL SOURCE WITH LOW TURBIDITY TO MEDIUM TURBIDITY and CHAINLINK FENCING WSS NALI FOREST BLOCK II SPOT UNDER JJM
Providing and Fixing of Chainlink Fencing around the S.C Nursery at Chambgund, S.C Range Kulgam, Forest Division Kulgam, under Scheme CAMPA NPV 2023-24.
Errection/Providing and fixing of chainlink fencing at Kanwan Khruishoo Block and Nagmal Takiya Khrushoo Block Ajas Conservation Reserve (Ajas-Bandipora Range) under CAMPA.
Providing and Laying 60mm thick interlocking tile in footpath,construction of Boundary wall, chainlink fencing and Landscaping of ground at Govt. Degree College Kunjwani.
Construction including successful testing and commissioning of 0.060 MGD Slow Sand Filtration Plant, construction of PST, Bathroom, protection wall, chainlink fencing for WSS Pannar
Construction of playfield Bandhurakh by way of Chainlink fencing, main gate with RCC Pillars, cutting of trees and filling of good earth (under CAPEX)
Laying / Fitting of pipe network, construction of protection wall, chainlink fencing , Anchor/ saddle blocks , intake/ collection chamber and spring protection for WSS Khursheedpora Bhutoo
L/F, Construction of 0.30 lac gallons SSFP ,0.15 lac gallons RCC SR, Sluice chamber, Chowkidar Quarter, Chainlink fencing for WSS Veerseran under JJM
Construction of Chainlink fencing, Plugging of C/wall gates with pillars and fixing of interlocking tiles on entrance path of Indoor Hall at Reasi.
Construction of Chainlink fencing of Park ,tiling and laying /fixing of iron mesh over drain at GMS at waskoora A Block Wakura DDC 147