Loading…
Loading…
12,290 results • Best match
Construction of catch water drain, Chain link fencing, retaining / breast walls, approach road Earthwork, Washroom and dry stone bunds to cover naked pipes of the supply network for WSS Baba Reshi Cheerdara under NABARD
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants, 02 Nos. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Khankoot under JJM (JKSSR 2020)
Construction of 0.20 lac Gallons SR ,02 No Sluice Chamber,Chain Link fencing around various structures and laying fitting of RWM , Supply main, Sub main and distribution system for WSS Neejpathree Cherward under JJM
Design, Construction, Testing and Successful Commissioning of SSFP 01 No. 1000GPH Cap., 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Mohalla under JJM (JKSSR 2020)
Construction of 0.35 lac Gallons SR,02 No Sluice Chamber, Protection work, Chain Link fencing around Various structures and laying fitting of Supply main ,Sub Main and distribution system for WSS Akingam under JJM
Const incl successful testing and commissioning of 0.040 MGD SSFP and 0.20 Lac Gallon Capacity RCC SR with sluice chamber, construction of PST, Bathroom, chain-link fencing and intake/ collection chamber WSS Drabipati Zaban
Design, Construction, Testing and Successful Commissioning of 02 Nos. Slow SSFP 500GPH Cap. 02 Nos. SSFP 1000GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Ranika under Jal Jeevan Mission
Design, Construction, Testing and Successful Commissioning of SSFP 01 No. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Jatheli under JJM (JKSSR 2020)
Construction Testing and Commissioning of Slow Sand Filtration Plant/Filtration Gallery 01 No. 1000GPH Capacity and Chain Link Fencing Around the Structure at Spot of WSS Bari Ghat under Jal Jeevan Mission (JKSSR 2020)
Retrofitting of Water Supply Scheme Prankutran by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction of balance work of Impounding Reservoir at Heeward by way of providing connection , construction of Sluice chamber and construction of Chain link fencing around IR at Heeward for WSS Heeward (under UT Capex)
Construction including successful testing and commissioning of 02 No 0.20 lac Gallon Capacity RCC service reservoir with sluice chamber, construction of protection wall, chain link fencing, intake/ collection chamber for WSS Bilal colony Guzarba
Laying and fitting of pipes, Construction of 0.1 Lac Gallons capacity RCC Service reservoir, 01 No. sluice chamber, Chain link fencing and allied works for WSS ACHTAL GB under JJM including installation of FHTC
Retrofitting of Water Supply Scheme Darakunjan by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, laying and fitting of GI Pipes and other allied works
Construction of 0.15 lac Gallon Capacity RCC service reservoir with sluice chamber, Laying / Fitting of pipe network, construction of protection wall, chain-link fencing , Anchor/ saddle blocks , spring protection works for WSS Tilmath Pardaywala
Retrofitting of Water Supply Scheme Darakunjan by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants, 02 Nos. 2000GPH Cap. 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Khankoot under JJM (JKSSR 2020)
Laying and fitting of pipes, Construction of 0.35 lac glns. SR, RCC jacketting to old SR, Sluice chamber,construction of chain link fencing ,construction of Gang Hut, cosnt. Of path , for WSS Baghpora Khoshipora
Retrofitting of Water Supply Scheme Gingle by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, laying and fitting of GI Pipes and other allied works
Construction of Chain link fencing around various assets at WSS Zazna-2nd, WSS Ahan Waskoora, Wudder Manasbal and WSS Kondbal for Augmentation and retrofitting of various WSSs in Block Wakoora-Part-I under JJM
CONSTRUCTION OF RETAINING WALL CONCRETE PATH AT VARIOUS SPOTS, CONSTRUCTION OF OPERATOR QUARTER AND CONSTRUCTION OF CHAIN LINK FENCING AROUND STRUCTURES (SR SITE TUBE WELL SITE) FOR WATER SUPPLY SCHEME POSH PATHRI UNDER JJM
Laying and fitting of pipes, jacketing to intake chamber, construction of chain link fencing, const. of drain and const. Of soakage pit ,septic tank incl. Installation of FHTCs for WSS KHEE JOGIPORA UNDER JJM
Construction of 0.25 Lac gallons SR, Construction of Pump operator Quarter GI puff type , Construction of 01 No sluice chamber, Construction of Chain Link Fencing , Providing Laying and fitting of pipes WSS Haji Dadi
Providingn and fixing of chain link fencing of 2400 Rft alongwith paint and fixing of board size 5ft x 3ft, Co. NO 45/R Dassal Mehari Rajouri Range of Rajouri Forest Division Nagar Van
Construction of Chain link fencing around various structures viz existing 80000 gallons S.R. existing SSFP and proposed 0.30 lac gallons S.R. for upgradation, retrofitting and Augmentation of various WSS in Block Safapora under JJM
Laying and fitting of pipes, jacketing to intake chamber, construction of chain link fencing, const. of drain and const. Of soakage pit ,septic tank incl. Installation of FHTCs for WSS KHEE JOGIPORA UNDER JJM
Providing/laying and fitting of GI pipes including Construction of 0.04MGD slow sand filtration plan, Construction of pre settling tank, Chain link fencing around structures, Protection/Retaining walls, Cattle trough, testing and successful commissi
Laying/ Fitting of pipes, Construction of 0.5 lac gallons SSFP,0.2 lac gallons S.R, 0.15 LAC GALLONS PST, 03 no. sluice chambers , chain link fencing, Saddle/ Anchor blocks and Road restoration WSS parteng kounserbal
Laying/ Fitting of pipes, construction of intake works cum P.S.T, Constt of 0.15 Lac Gallons S.R, 0.50 Lac Gallons slow sand sand filtration plant, sluice chamber, chain link fencing for W.S.S Poniwah under JJM
Construction of 5 No. Pre Settling Tanks, 0.24 Lac Gallons RCC SR at Moorie, Chowkidar Hut, Chain Link Fencing around Structures and Approach Road for 100 percent FHTC coverage under JJM for WSS Kalaroose
Construction of Water Supply Scheme Chahlan by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Naganari by way of Construction/Commissioning and Testing of PSTs/ SRs/SSFPs/ Intake Chambers Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction of Water Supply Scheme Ijara by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Bagna by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Ramgee by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Dawaran by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Dardkote by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Mohura by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction of Water Supply Scheme Salamabad A and B by way of Construction/Commissioning and Testing of Intake Chambers Protection works, Chain Link fencing, laying and fitting of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Jabla by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, laying and fitting of GI Pipes and other allied works
Retrofitting of Water Supply Scheme Paranpillan by way of Construction/Commissioning and Testing of Intake Chambers/PSTs/ SRs/SSFPs/ Protection works, Chain Link fencing, laying and fitting of GI Pipes and other allied works
Constt of Dug Well, Operators Quarter,Chain Link Fencing,Crate/Cement Concrete Protection Works,Aproach Path, DG Shed,Improvements to existing Pipe Network And Laying Fitting Of Pipes for WSS Hardu Schichen under JJM
Design, Construction, Testing and Successful Commissioning of SSFP 02 No. 3000GPH Cap., 01 No. 2000GPH Cap., and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Arnora under JJM (JKSSR 2020)
Design, Construction, Testing and Successful Commissioning of SFP 02 Nos. 2000GPH Cap. 02 Nos. 1000GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Menchar under JJM (JKSSR 2020)
Design, Construction, Testing and Successful Commissioning of SSFP 01 No. 1000GPH Cap., 03 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Ghuraka under JJM (JKSSR 2020)
Construction, Testing and Commissioning of SSFP 01 No. 2000GPH Cap., 01 No. 1000GPH Cap. 01 No. 500GPH Cap. and Chain Link Fencing Around the Structure at Spots of WSS Manjmi under Jal Jeevan Mission
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants 04 Nos. 1000GPH Cap. 04 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of WSS Mundhar under JJM (JKSSR 2020)
Design, Construction, Testing and Successful Commissioning of SSFP 03 Nos. 4000GPH Cap., 02 Nos. 500GPH Cap. and Chain Link Fencing Around the Structure at Spot of Water Supply Scheme Bhagwah under JJM (JKSSR 2020)
Laying and fitting of pipes ,construction of ,construction of sluice chamber, stabilization of existing pipe network, const. of chain link fencing, Retaining wall, supporting pillers, CWD, crate work, path and levelling wss Lisser Shalnard
Construction of Wooden Gate at Entry of National Park 10ft Height and 8ft Width with Side Chain Link Fencing at Bhatali (Bathli) Kibbar for Publicity Wildlife Chenab Division Kishtwar for the Year 2026 27