Loading…
Loading…
5,072 results • Best match
Standalone Ceiling Mounted Fire Suppression System (Q2)
HPT Testing of fire suppression cylinders (Q3)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Fire Beaters (Fire suppression hand tools) (Q3)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Fire Beaters (Fire suppression hand tools) (Q3)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
Standalone Ceiling Mounted Fire Suppression System (Q2)
FIRE ALARM SYSETM MMBPL
Construction of Directorate office cum Training and Placement Building including IEI and Fans Fire Alarm Fire Fighting VRF VRV and UPS system etc. for RGIPT at Jais Amethi UP Subwork/Packages: Main Work
Construction of Centralized mess including IEI & fans, DG set, fire-fighting, fire alarm. at National sugar Institute Kanpur UP (SH : Providing services of one No. Inspection vehicle for subdivision-I office)
REPAIR/ MAINT/SERVICING OF MECH LAUNDRY, FIRE FIGHTING SYSTEM, HOT FOOD TROLLEY, AIR PURIFIER, OT LIGHTS, RO PLANT, UPS AND SERVO VOLTAGE STABILIZER AT CH CC, CMDC,BASE HOSP, SOI ECHS COLLEGE OF NURSING UNDER GE E/M LUCKNOW
Custom Bid for Services - 200153558 BMC For PM BD maintenance and Overhauling of HT Motor and PM & BD maintenance of Fire Fighting System of St-I II & III NTPC Rihand Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Driver Cum Operator required for Operation & Maintenance of 4 Nos Emergency Rescue Vehicle (ERV) for One Year in Uttar Pradesh Location Similar Category Manpower Outsourcing Services - Fixed Remuneration Operation And ... Of Fire Fighting System
OPERATION AND ANNUAL MAINTENANCE OF FIREFIGHTING AND FIRE ALARM SYSTEM INSTALLED IN 200 BEDDED REFERRAL HOSPITAL GREATER NOIDA UP FOR THE YEAR 2023 24
AEROSOL BASE FIRE DETECTION .
Civil, Plumbing, Electrical, VAC, Firefighting and Fire detection systems for Agriculture University Depot on Corridor-2 of Kanpur Metro Rail Project at Kanpur, U.P.
Fire Beaters (Fire suppression hand tools) (Q3), GALVANIZED MILD STEEL FIRE BUCKET (Fire suppression hand tools) as per IS 2546 (Q3)
Fire Beaters (Fire suppression hand tools) (Q3), GALVANIZED MILD STEEL FIRE BUCKET (Fire suppression hand tools) as per IS 2546 (Q3)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2), Controlled Percolating Hose For Fire Fighting As per IS 8423 Latest Amendment (Q2), High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 (Q2), Fire Hose Cabinet (Q3)
Unbranded Fire Hooks (Fire Suppression Hand Tools) Conforming, Unbranded Fire Hooks (Fire Suppression Hand Tools) Conforming to IS:927 latest
Supply of Various Types of Fire Hydrant Spares
9 KG STORED PRESSURE TYPE DCP FIRE EXTINGUISHER, 75 KG TROLLEY TYPE DCP FIRE EXTINGUISHER, 4.5 KG CO2 FIRE EXTINGUISHER, 2KG CO2 FIRE EXTINGUISHER/CYLINDER
FIRE EXTINGUISHER CO2 2KG C70240006466, FIRE EXTINGUISHER CO2 4.5KG C77775017003, FIRE EXTINGUISHER ABC 2KG C76855400258, AFFF 2 KG C70240006757, WATER MIST WITH BA SET 50L C70240006660
Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 9 Kg; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Clean Agent Type Fire Extinguisher; Other; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 9 Kg; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 25 kg; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Foam Based Fire Extinguisher; 50 Litres; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 6 Kg; More than 5 Years
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 2 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; sadhe 4 kg; 4 and half Kg, Refilling of Fire Extinguisher Cylinders - ... of Fire Extinguisher Cylinders ... of Fire Extinguisher Cylinders ...
Double Headed Fire Hydrant Stand Post (Q3)
RMRM191130 SUPPLY OF FIRE HYDRANT LANDING VALVE
MISCELLANEOUS CIVIL WORKS IN FIRE HYDRANT LINE
Portable Fire Extinguishers IS 15683
Portable Fire Extinguishers IS 15683
Portable Fire Extinguishers IS 15683
Powder Based Wheeled Fire Extinguishers
75KG DCP FIRE EXTINGUISHERS (Q3)
Portable Fire Extinguishers IS 15683
Portable Fire Extinguishers IS 15683