Loading…
Loading…
7,778 results • Best match
Removal of water stagnation by laying of RCC pipeline from opp: Indian Oil petrol bunk to existing culvert near flyover Nallagandla in Ward No.105-Gachibowli in Serilingampally Circle-20, West Zone, GHMC (Item No.3)
Submersible Pumpset Repairs and Maintenance material and Laying and Jointing HDPE Pipe Line work at Telugutalli Flyover , Nava Telangana Park, Circle-17,Khairathabad Zone, GHMC from 1st June 2024 to 15th August 2024 during 2024-25
Providing C.C Kerb wall from Pillar P5 to P18 (Up to Nirmala Convent Road) under neath of newly constructed Flyover of Benz Circle in Works Division-3 area. Rc.E3-PD-III(Parks)-108625/2022 4th call
Renewal of BT surface by providing and laying of Highly Modified Polymer Bituminus Concrete on Mahin Interchange flyover and Anti Carbonation Paint to U Bridge on Western Express Highway at Bandra in the state of Maharashtra
Construction of a new RUB (Rail under Bridge) in the alignment of PPL approach being executed in connection with the 2nd Exit road cum flyover at Paradip as part of additional Port connectivity from National Highway
Supplying and laying of 500mm dia DI Conveying main from Central Main at Padi Flyover to existing underground tank at 31st street and proposed underground tank at 68th street, TNHB Colony in Depot-84,Area-VII.
Construction of temporary bamboo barricade from near Maharani Tulsibati School to Battala flyover (600 mtr) via Kaman Chowmohni/Post Office Chowmohni/Paradise Chowmohni for public convenience and Watch Tower during the programme of Maayer Gommon and
Cleaning shurbs,plants and jungles,removal of rubbish,Trimming,cutting and placement of uprooted treelogs and branches in suitable place and cleaning entireportion of 2nd Hooghly bridge flyover Khidderpore side approachportion during the year 2024-25
General up-keeping / maintenance of Main road from Bikram Chowk to Satwari including Flyover by way of clearance of V-Shaped drain during the year 2023-24 upto ending March 2024 (Stage Work) Under Non Plan
Preparation of Feasibility Study Report including General Arrangement Drawings GAD, Cross sections, detailed alignment plan, cost estimate, RFP etc. for Construction of double lane Flyover from Radha Nagar to IGM Hospital via North Gate, Colonel Chow
Maintenance of greenery underneath the flyover at 13 spanes (Piller No.1 to 14), Maruthi nagar, Kharmanghat to Owaisi Junction, Circle-8, Charminar Zone,GHMC, during th e year 2022-23(12 months)(Reserved for SCs)
Laying of 450mm dia DI water supply mains (Shifting) for construction of 4 lane, 3 lane, 2 lane flyover at Kothaguda cross roads to Ramalayam under Madhapur Section, Sub Dn-I, O&M Dn- XV, Serilingampally
Construction of RCC Storm water Drain (Box Drain) from existing cross culvert near Bairamalguda Junction on Inner Ring Road to Bairamalguda Lake for accommodating the multilevel flyover SRDP work at Bairamalguda Junction, LB Nagar Zone, GHMC
Widening of existing road by formation of service road with CC from Bharath petrol pump to starting point of Hitech city flyover in Madhapur Ward No.107,Chandanagar Circle-21, SLP Zone, GHMC (Item No.2)
Maintenance of greenery underneath the flyover in 10 spans (Pillar no.AP1 to P6) at Bahadurpura X Road in Circle -10, Falaknuma, Charminar Zone, UBD, GHMC for a period of (7 months) during the year 2023-24
Estimate for Arrangement of providing of temporary lighting decorative series lamp at hafeezpet flyover in view of Telangana state formation day for two days i.e. 01.06.2018 to 02.06.2018 in Chanda nagar circle-21,west zone,ghmc.
Laying of 250mm dia SWG sewer line from H.No. 12-12-192/27 to 12-12-192/67 and 12-12-192/1 to near Flyover Pardhiwada Pittala Basthi under Tarnaka Section, SD-III, O&MDn.VII.
Sculpture with lighting in main junction and island (Theme of Anilmal and Bird sculptures with Artistic water fall at underneath the APJ Abdul Kalam Flyover in Circle-08, CRZ,UBD,GHMC for the year 2025-26
Development of road infrastructure viz a flyover, high level bridge and underpass at Yellandu in Bhadradri Kothaudem District Sw:- Geometric Improvements to junction at M-Y road and SCCL bye pass road in Bhadradri Kotbhagudem District.
Drilling of 6 1/2 inch dia borewell, supply, delivery and erection of subtable submersable pump set with accessories work at : Underneath LB.Nagar Flyover, Circle-4, LB.Nagar, LB.Nagar Zone, UBD,GHMC for the year 2025-26
Maintenance of Veertical garden underneath the Owaisi flyover at Pillar no 1 to 38 (5 pillars) Kharmanghat to Owaisi Hospital, Circle-8, Charminar Zone, GHMC for the period of 12 months during the year 2025-26
AR and MO PWD Roads under Sub Division 3 of Division C and ND Roads during 2020 21 SH Providing Services of House keeping for Cleaning under IP Flyover subways 2 Nos and FOBs 3 Nos
Providing and laying interlocking tile from H/o raju to H/o Raghuwir singh and h/o arun saini to flyover and h/o fula rani to h/o sunny and to road ward no. 2
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF BALANCE WORK OF I) REHABILITATION AND UPGRADATION OF PANVEL MAHAD PANJI ROAD II) CONSTRUCTION OF FLYOVER IN KM. 468.500, VUP IN KM. 470.000 AND OVERPASS IN KM. 451.300
A/R and M/O to various roads under SWR-II ,PWD Delhi During 2024-25 (SH- Repair and Renovation of Tiranga Park and island under palam Flyover on palam Dabri Road under Sub division-21 )
AR and MO various Roads under Division SER 1 during 2022 23 SH Repair of footpath on BRT road from Jungpura Metro Station to Lodhi Flyover Dayanand muktidham cremation ground side under Sub Division SER 14
Dismantling of MS chain link mesh at TE building compound, Gachibowli and refixing including other connected civil works for collapsed portion of compound wall at flyover side of TE building at Gachibowli, Hyderabad (2 nd Call)
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
Supply installation testing and commissioning of Street Light Poles on the custom scanner road near custom building approach to R 3 AND slip road of PUB junction Flyover bridge along with allied electrical works in JNPT
Comprehensive maintenance of various roads under PWD Division South East Road-1 during 2026-27. (SH - Improvement of Central Verge of Moolchand Flyover and Planter work at BRT Road under jurisdiction of Sub Division SER-11).
Restoration of MMA Road and Mathura Road cut by Delhi Jal Board and Bharti Airtel From Jullena Chowk to Mathura Road, Mathura Road to Modi Mill Flyover under Sub Division R 12 of Division SER 1
Annual Maintenance of Street Ligh in Sector-14, 15, 15A, 16, 16A, 17, 17A, 18, 99, 100, 107, 96,97,98 Related main Roads, MP road no. 2 uotp Film city flyover, DSC Road upto sector 18,Noida
A/R and M/O to various Road under SRD Project Division-I, Dg. 2022-23 (Improvement and Repair of Footpath, Drainage system and kerb channel along with Barfkhana Chowk to Rani Jhasi Flyover end point.)
Restoration of MMA Road and Mathura Road cut by Delhi Jal Board and Bharti Airtel From Jullena Chowk to Mathura Road, Mathura Road to Modi Mill Flyover under Sub Division R 12 of Division SER 1
A/R and M/O PWD roads under Sub-Division South East Road-12, of Division South East Road-1, during 2022-23. SH Repair of U-Turn Modi Mill Flyover service lane of Mathura Road).
Providing C.C Kerb wall from Pillar P5 to P18 (Up to Nirmala Convent Road) under neath of newly constructed Flyover of Benz Circle in Works Division-3 area. Rc.E3-PD-III(Parks)-108625/2022 5th call
Providing C.C Kerb wall from Pillar P5 to P18 (Up to Nirmala Convent Road) under neath of newly constructed Flyover of Benz Circle in Works Division-3 area. Rc.E3-PD-III(Parks)-108625/2022 2nd call
Construction of Compound wall to (4 Nos) Open sites i.e., at Swarajya nagar church park beside flyover bridge (02Nos) and Swarajya Nagar Park in division No. 17th (Under 14th Finance Commission Grant 2019-20)(3rd Call)
Supply, delivery & fixing of sump dust filters, Granite, LED lights, foam boxes & nozzles & other items for fountains on Landscape portion on F1H2O park under Kanaka Durga flyover at Bhavanipuram in 26th division in Circle-I area
2025-HOR01-CB-235 Development of soft landscaping and Garden work below telugu thalli flyover (4Spans S. No 19-20 to22-23 ), From Sangam theatre jn to Chandana Residancy (opp)Zone-IV Area, Including 6Months Maintenance
2025-HOR01-CB-235 Development of soft landscaping and Garden work below telugu thalli flyover (4Spans S. No 19-20 to22-23 ), From Sangam theatre jn to Chandana Residancy (opp)Zone-IV Area, Including 6Months Maintenance
Providing RGB Serial Sets, 8mm Serial sets,120/150w Flood Lights at Penna Barriage road and old check post road to Kissan Nagar centre (Flyover bridge) Navalakulathota Tepposthavam and Gobbemmalu festival on Dated: 16.01.2023 and 17.01.2023
Providing boundary basement wall in place of old damaged GI Chain Link Mesh and Development of Plantation along Eluru Canal Bund from Govt. Press to Madhuranagar flyover in Circle-II area. Rc.PD-III (Parks)-120826/2020.
Desilting of RCC Culverts and removing and laying of RCC Slabs over CC Drain at both sides of Bhimavaram Road, main from from New Flyover to SV Ranga Rao Statue and KN Road in Tadepalligudem Municipality
Providing of wall painting with concepts, Abstract patterns and Decorative themes on selec ted wall at Gooty road flyover bridge (Right side) and C.Camp circle to nandyal road central medians, Gayatri Estate Central Median in Kurnool.
Unipole Cluster No.33, After Mukarba Chowk Flyover to to Burari Flyover Gole Chakkar (Left Side Only), Civil Lines Zone
Annual Maintenance for Lighting System of Flyover Proper and at Grade of Lock Gate flyover under HRBC for 12-Months
Design, Manufacturing, Supply and Supervision for installation of POT PTFE Bearing
DSITC of 25KV, AC, 50Hz, Railway Electrification OHE modification works at various locations in connection with Katni Grade Separator Bypass Line Project and Supply, Testing and Commissioning of T and