Loading…
Loading…
133 live45 closing this weekmost from Dakshin Gujarat Vij Company Ltd. (DGVCL) and KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
133 results • Best match
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Preparation of GIS based Revised Master Plan- 2041 for the Local Planning Area (LPA) of Bangalore Development Authority
Custom Bid for Services - Conducting Bathymetric Survey, Sedimentation Study and Drone-Based Topographical Survey of Nathpa Dam Reservoir of Nathpa Jhakri Hydro Power Station (1500 MW), District Kinnaur, Himachal Pradesh Similar Category Drone ... Service GIS related Survey Services ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Site survey including underground utility verification, Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including Documentation of All ... with GIS Mapping / ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Konnagar Hooghly District
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Chandannagar, Hooghly District
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bansberia, Hooghly District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bhadreswar , Hooghly District.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Uttarpara Kotrang, Hooghly District
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Halisahar, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP oror new proposed STP site for treatment at Baranagar, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Titagarh , North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Garulia, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Naihati, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Kamarhati, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bhatpara, North 24 Parganas District.
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Panihati , North 24 Parganas District.
Preparation of GIS based maps and Planning Report for area of 145 sq.km (approx) (Chinsurah- Mogra Panchayat Samity (part), Singur Panchayat Samity (part), Polba Dadpur Panchayat Samity (part)) under the jurisdiction of KMPA for LUDCP
Preparation of GIS based maps and Planning Report for area of 117 sq.km (approx) (Barrackpore-I Panchayat Samity (part), Chakdah Panchayat Samity (part), Haringhata Municipality (Part) and Haringhata Panchayat Samity (Part)) under the KMPA for LUDCP.
Preparation of GIS based maps and Planning Report for area of 71 sq.km (approx)(KMC(Part),Rajpur-Sonarpur Municipality (Part)) under the jurisdiction of Kolkata Metropolitan Planning Area (KMPA) for LUDCP under Section 31 of the WBTC(PD) Act, 1979.
KMDA/CIVIL/E and AM/Planning Circle/SE/07 OF 2026-27, Dt. 27.08.2026
05/KMDA/CIVIL/SE(CRS)/EandAM OF 2026-27 Date. 27.08.2026