Loading…
Loading…
386 results • Best match
RFID TAG FOR LHB COACHES
Procurement of 209 nos PTs and 47 nos VTs along with 2
TAGGING OF RFID FLUROSCENT SLEEVE ON TOOLS
TAGGING OF RFID FLUROSCENT SLEEVE ON TOOLS
Set of RFID tag and Blind rivet
GPS Tracking System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6502919 Dated : 28-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Unbranded Access Controlled Handle Door Lock Only RFID card, Unbranded Access Controlled Handle Door Lock Only RFID card based Access Control
Custom Bid for Services - Providing SnD SAP Office VTS Monitoring Assistance at BPCL Sangrur TOP
RFID based vehicle management system and upgradation of
RFID based vehicle management system and upgradation of
Procurement of RFID Tags and EM Tattle Tapes
ANTI JAMMING GPS MODULE AND ANTI SPOOFING GPS MODULE
RFID Tags, RFID Desktop Reader, Lap Track Software, Installation and Commissioning and Training, 4 Port Reader, Antenna 12 DBI, Mounting Pole, RF Cable
GIS mapping of Encroachment, Plantation, Grow more food, Vacant Railway land etc. on Railway land in the jurisdiction of Sr.DEN-lII/FZR & DEN-HQ/FZR using Survey grade hand held GPS device and processing the data in (.Shp) file format, duly link with the attributes of assets as required for IR GEO portal.
Implementation of RFID Technology in Central Library of the
Access Reader Controller TDAF Realtime for RFID System (Q3)
SUPPLY OF EQUIPMENT FOR RFID CUM QR BASED DPT
GPS Tracking System (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6597027 Dated : 22-08-2025 Bid Document 1/5 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
GPS Tracking System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 1 Bid Number : GEM/2025/B/6603481 Dated : 23-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
GPS PCB, Communication Module
hand held gps
hand held gps
hand held gps
hand held gps
Purchasing of GPS