Loading…
Loading…
30,392 results • Best match
Day to day sweeping the road pathway and removal and disposal of waste materials from 13.700 kmp. to 14.564 kmp. on both side of Jessore Road under Baguihati Highway Sub Division of Barasat Highway Division No-I
Maintenance works of BDO Office Battala to Nazat Puraton Hatkhola Road in stretches from chainage 3.30 kmp. to 5.80 kmp. under Basirhat Highway Sub-Division of Barasat Highway Division-I in the district of North 24 Parganas
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I.
Pre monsoon cleaning of road side drain culvert etc. from 0.00 km. to 3.00 (Airport flank) of K.N.I. Avenue under Baguihati Highway Sub-Division of Barasat Highway Division no. I in the District of North 24 Parganas.
Post moon soon repairing work of Munshirhat-Penro-Khila-Rajapur Road, from Ch. 9.00 kmp to 12.20 kmp of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year 2025-26.
Repair works of the Official residence of the Rest Shed Banglow at Mangalbari Malda Highway Division, Outside Plaster Putty, Painting and allied works in the District of Malda under Malda Highway Division, during the year 2022 2023.
CONSTRUCTION OF TEMPORARY PANDEL AND WOODEN PLATFORM FOR THE PERIOD FROM 09.01.2024 TO 17.01.2024 AT K2 BUS STAND IN GANGASAGAR ISLAND ON THE OCCASION OF GANGASAGAR MELA - 2024 UNDER KAKDWIP HIGHWAY SUB-DIVISION, DIAMOND HARBOUR HIGHWAY DIVISION
Cleaning and maintain the drain during the monsoon period from Haldiram Junction to Airport 1 no. of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No. - I in the District of North 24 Parganas.
Day to day sweeping the road pathway and removal and disposal of waste materials from 13.700 kmp. to 14.564 kmp. on both side of Jessore Road under Baguihati Highway Sub Division of Barasat Highway Division No-I
Collection of user fee through fee collecting agency on the basis of open competitive bidding in the state of Rajasthan toll plazas located at Manglana-makrana-borawad Highway (SH-2B) including Makrana-Bidiyad-Parbatsar Highway (SH-2D)
Cleaning and repairing of drainage system in both side flank from 1.00 Kmp. to 3.00 Kmp. of Dumdum - Lauhati Road under Baguiati Highway Sub-Division under Barasat Highway Division - I, in the District of North 24 Parganas.
Emergent repairing of damaged black top surface of Domjur-Baluhati-Jagadishpur Road from Km. 1.50 to Km. 3.65 of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah during the year 2026-27
Providing WBM road from BT Road to Vinayaka Temple near Adhenapalli ST Colony, Highway to V Nagarathnam House near Sreenivasapuram, Highway to Yasodamma House near Kothuru ST Colony at Adhenapalli GP in Pakala Mandal. (Item No.4)
Repairs To Bridges in Highway Connecting Bhatkala with Soraba (SH50) at Ch. 36.80 Km and 66.00 Km and in Highway Connecting Hanabal(SH-107) to Kogar cross (SH-50)(SH252) at Ch. 320.20 Km in Sagara Taluk
Emergent repairing of Kunur bridge at 9th km of Muchipara - Shibpur Road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26(2nd Call)
Emergent repairing of different stretches at Kalipahari-Tirat Road (FR-17) from 2.0km. to 3.00km. by providing repairing potholes, 20mm premix and seal coat (type-B) etc. of Asansol Highway Sub-Division
Emergent repairing of Kunur Bridge Bituminous surface at 9.40 km of Panagarh-Illambazar road by profile corrective course, repairing potholes, premix carpet etc. in patches under Asansol Highway Division, P.W.(Roads) Directorate
Raghunathpur-Kantaberia (via Molandighi) road from 2.50km. To 4.50km. 6.00km. to 10.80km, emergent repair and maintenance work under Asansol Highway Division in the district of Paschim Bardwan during the year 2022-2023
Repairing of Damages at Abhirampur Paraj Kolkol Road Between Ch. 0.00 km to 4.00 km caused by PHE department for laying of underground pipe line without permission under Durgapur Highway Sub Division
Abhirampur-Paraj-Kolkol road, 1.00kmp. to 3.00kmp. and 5.00kmp. to 6.50kmp., patch repair work under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Burdwan during the year 2025-26
Protection work by providing Eucalyptus Bullah due to high tide river water passing through deep drain at north west side of Kakdwip Highway Sub-Division office building and adjacent campus road under Diamond Harbour Highway Division
Repair and maintenance of Bolpur Highway Sub-Division office Building under Birbhum Highway Division-II, P.W.(Roads) Dte. In the district of Birbhum.
KIIFB 16 17 DEVELOPMENT OF HILL HIGHWAY SH 59
Emergent rain damage repair Pandabeswar Shamla road from 0.00 kmp to 1.50 kmp and from 2.5 kmp to to 4.00 kmp Under Asansol Highway Sub-Division of Asansol Highway Division in the district of Paschim Bardhaman during the year 2021-22
Baksha-Agrauraj Highway se Pr. Pa. hote hue pich road tak evam Brahman Basti Amit Pathak ke purva tak-Lepan
Development of 24 meter wide DP road from Bavdhan khurd Gloria grace to highway service road.
Construction work of BT divider Road and drain from Nimbadi chouraha to Highway bypass road, Kuchera.
(WORK NO-6) GRAM PALI KE DELHI-SAHARANPUR HIGHWAY SE NEHAR TAK PAINTING ROAD NIRMAN KARYA
Beautification Work at Footpath, Eastern Express Highway, BKC Connector From Bhuyari Marg to Chunabhatti Bus Stop
Construction of Penting road from Bhinga Highway to Malhipur L/R in village Wajirpur, Block Chittaura
7. Construction work of drain and interlinking road from Powayan Highway to Bhanu Mishra Advocate house
Construction of walking track from Barotiwala Baddi Highway Towards Dano Mata Mandir, Ward No 5, Baddi
Strengthening of BT Road at Ward No 11 Highway City Cross Streets in Sarkarsamakulam Town Panchayat
M/o Green Belt Express Highway (LHS) 01 Km to 02 Km with two year maintenance.
Construction of Drain from Punjab National Bank railway bridge ke niche to Jyoti Nagar highway puliya
CONSTRUCTION WORK OF CC ROAD AND DRAIN FROM THE HIGHWAY TO SANNO BEGUM HOUSE IN POJEPUR.
NAGAR PANCHAYAT MEERAPUR KE DUMPING YARD SE BIJNOR HIGHWAY KI AUR C.C. DWARA SADAK NIRMAN KARYA
Construction work of SPH Raod kalandrpur naher Ki Patri to Kuragav Yusufpur highway Tak Link Road.
Construction work of Drain From Mahesh Petrol pump to near Bypass along Mundwa Nagaur Highway raod.
Construction work of Ishwari Singh Purva link road from revenue village Atheha Kumbhi Aima Highway (12)
STBT to Road From Nagar Manmad Highway to Shelke, Sadaphal, Jadhav, Dudhade Road (Ward No. 8)
Repair With Renewal Work of UFA Road to Highway Hote Hue Shivgargh Purani Basti Link road
3.CONSTRUTION OF ROAD at VADGOAN ANANAD ALE FATA HIGHWAY TO SAIRATNA SOCEETY ROAD TAL JUNNAR
GRAMSABHA BAGRETHI ME MOHAMMADI PASGAWAN HIGHWAY SE BAGARETHI SAMPARK MARG PAR LEPAN AWAM PULIYA NIRMAN KARYA
Block Airaya Antargat Gram Amao Me Highway Road Se Om Prakash Ke Ghar Tak Interlocking nirman
Construction Of W.B.M Road From Aurangabad Jalgaon Highway To Pimpalgaon Road Shiv Road For M.C Sillod
M/o Green belt two year Maintenance Express Highway (LHS) 13.50 Km to Safipur under pass
Proposed work of WBM road at ward no 20 ratnagiri nagour highway to mallu matil mala.
Vadgaon Budruk highway service rasta rundikaranamadhil M.Ra.Vi.Vi. companyche HT feeder v pol sthalantranache urvarit kame karne.
CONSTRUCTION OF CC ROAD FROM HURKAT HOUSE TO AKOLA HIGHWAY IN P.NO. 05, WASHIM(UNDER N.P.FUND)