Loading…
Loading…
30,394 results • Best match
Emergent repairing of damaged blacktop surface of Sarenga bridge approach at Hirapur to Nalpur Station Road from Km. 0.00 to Km. 1.70 of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah during the year 2026-27
Maintenance to the highway starting from Ahemadnagar Medhewadagaon Daund Dahiwadi Tasgaon-Sangli Road NH160 in stretches section Km 126/00 to 173/130 (Mayani Sangli Dist Border to Tasgaon) in the State of Maharashtra.
Patsimulia-Bouldah Road from chainage 7.00 Km to 10.81 Km In stretches Emergent Patch Repairing under Barasat Highway Division No.II in the District of North 24 Parganas
Bongaon Jhowdanga Panchpota Road from chainage 4.00 Km to 10.00Km Emergent Patch Repairing In stretches under Barasat Highway Division No.II in the District of North 24 Parganas
Emergent Repairing of potholes of Ramganj Udrail Daspara Road from 0.00km to 7.00 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent repairing of potholes of Solpara Rasakhowal Road from 7.00 kmp to 11.00 kmp in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent patch repairing work of Different stretches at Asansol Byepass to Domohani (FR-6) road from 1.70 km to 2.30 km by providing patching potholes, repairing potholes and 20mm premixed carpeting work of Asansol Highway Sub-Division under AHD
Emergent temporary restoration work of Different Stretches from 8.50 km to 9.50 km at Chanda-Domohani road (FR-14)in stretches by providing pot holes, repairing potholes and 20mm premix carpeting work of Asansol Highway Sub-Division under AHD
Construction of 02 nos box culvert (single cell-1.50m x 1.50m) in replacement of existing damaged culvert at 13th and 14th km of Raghunathpur-Kantaberia road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan
Chaktirth LMI Project Ta Malegaon Dist Washim Upgradation Of Nagpur Aurangabad Highway To Davha-Sudi Alternative Village Road
KIIFB-HILL HIGHWAY-SHIFTING OF HT AND LT LINES AND UTILITIES ALONG BADOOR TO IDIYADKA
Maintenanace To the highway starting from Ahemadnagar-Medhewadagon - Daund - Dahiwadi - Tasgaon - Sangli Road NH 160 in stretches section Km 173/130 to 211/00 (Tasgaon to Mhaisal Karnataka State Border) in the state of Maharashtra.
Providing and Fixing D.I. Specials 700mm to 1000mm for Laying of 700mm i/d D.I. Rising Main from 3rd Water Works Panjuana to Main Water Works Chattargarh Patti Road Sirsa Town including crossing of Ghaggar River, National Highway and Canal / Minor
Construction of Road Safety Measures for roads at National Highway Junction Points in Compliance to Honorable Supreme Court Directives under Chirang (RnB) Division under 966-Road Safety Works for the year 2023-24, Package No. CHR/RSM/2023-24/01
Watering of Plants every third day for two months minimum 12 litre water per plant for 10959 plants in the selected day every third day at Ring Road Raya Morh to Avtara Chak National Highway for the year 2023-24
Construction of 33 KV line with MVCC (161 sq. mm.) from Sariahtali 132/33KV GSS to SP Office, National Highway, Nalbari along with Railway Track Crossing, Kayakuchi for providing power supply to Nalbari Medical College, Nalbari under Nalbari ESD II
Supplying of 3(Three) Nos Security Personnel ( Security Guard without Arms) in Zone-A on purely temporary basis for guarding at office of EE, National Highway Division-V, P.W. (Roads) Directorate at Barasat in the dist of N 24 Pgns
This estimate is prepared for concreting NH Thundiyil road in ward 20.Many families use this footpath to enter to National highway. At present this footpath is poor in condition hence it is necessary to improve the condition of foot path
FOR REFILLING OF A-4 SIZE LASER / MULTIFUNCTION PRINTERS (BLACK) INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Sect
FOR COMPREHENSIVE ANNUAL MAINTANANCE OF PRINTERS INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD and Te
Supply, laying and pushing of MS casing pipe of specified thickness by trenchless method across jaipur Sikar National Highway in front of Dolphin school to transfer water from Road No 13 VKIA pump house to meetout the demand of Anokha Village
Maintenance of Culverts and Jungle cutting and drain clearance in between 3.00 Km to 12.00 Km of NH-55 (New NH-110) under National Highway Division No IX, in the Dist. of Darjeeling during the year 2025-26. (SL-02)
Supplying of 1(One) No. Security Personnel ( Security Guard without Arms) in Zone-A on purely temporary basis for guarding at office of Executive Engineer , National Highway Division-V, P.W. (Roads) Directorate at Barasat in the dist of N 24 Pgns
FOR COMPREHENSIVE ANNUAL MAINTANANCE OF COMPUTERS INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD and T
FOR COMPREHENSIVE ANNUAL MAINTANANCE OF NETWORK INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle, E/M Section, NBD and Tes
Supplying, fabrication and insertion of 200 mm dia (ID) and 16mm thick MS pipe line 80 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique for crossing National Highway-117 at Sarisha Ashram More within Diamond Harbour-II block for Layin
FOR REFILLING OF A-4 SIZE LASER / MULTIFUNCTION PRINTERS (BLACK) WITH CHIP INSTALLED AT RDD, Chief Architect (CE-RDD), Chief Engineer Capital Zone, Chief Engineer National Highway, Chief Engineer Bridge, SE Bridge, PIU, Circle 1, Circle 2, E/M Circle
Trenchless laying of DI K-7 water supply pipe line under ROW of National Highway, without cathodic protection having M.S. casing pipes, following the entire NHAI specifications, and the footnotes of the drawing to be approved by the NHAI authoriti
Supplying, fabrication and insertion of 350 mm dia (ID) and 16mm thick MS pipe line 60 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique for crossing National Highway-117 at Sarisha 246-More within Diamond Harbour-II block for Laying
Consultancy services for preparation of Detailed Project Report for Repair and Rehabilitation of 22 twenty two nos Bridges and Culverts of NH14 Old NH 60 NH 114 Old NH 2B NH 114A under National Highway Division No XII PW Roads Directorate
Providing Four Nos Security Guard un-Armed for round the clock guarding arrangement for Office of the Executive Engineer National Highway Division No-IV and Office of the Assistant Engineer Purulia NH Sub-Division PW Roads Dte and attached Stack yard
Maintenance of Culverts and Jungle cutting and drain clearance in between 15.00 Km to 21.00 Km of NH-55 (New NH-110) under National Highway Division No IX, in the Dist. of Darjeeling during the year 2025-26. (SL-01)
Repair and Maintenance of National Highway NH-40 from Barapani -Shillong - Km 61.80 to Km 79.000 of NH 40 along the existing road in the State of Meghalaya for the FY 2022-23 Item Rate Basis , Total length - 17.20 km
One time improvement of existing Mohanpur Bypass National Highway Road NH-108B from Design Km 6.500 existing Km 6.80 to design Km 19.300 existing Km 21.400 in the State of Tripura FY 2023-24 on percentage rate basis 3rd Call
Shifting of 11 KV Feeder No 3 (R /L) line and 33 KV Distt. hospital line near Govt. Polytechnic Faizabad due to Construction of New over Bridge Footh Path By National highway Authority of India Under Electricity Distribution Division Ist, Faizabad
Emergent patch repairing work of Different stretches at Chanda - Domohani Road (FR-14) from 8.00 kmp to 8.50 km and 9.500 km to 10.00 km by providing patching potholes,repairing potholes and 20mm premixed carpeting work of Asansol Highway Sub-Divn.
Construction of new hume pipe culvert in place of existing damaged hume pipe culvert at 19th km of Chora-Bhatkunda-Mankar road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Rehabilitation and Construction of wing walls including other allied works of the culvert at 4th km of Burnpur Samdhi Road under Asansol Highway Division , P.W.(Roads) Directorate in the District of Paschim Bardhaman during the year 2020-21(SL-2).
Temporary restoration of potholes on hard crust by jhama metal along 5.4km. to 8.4km. and 10.40km. to 11.50km. (in stretches) of Galsi-Guhagram Road under Asansol Highway Division in the district of Paschim Bardhaman during the year 2020-21. (SL-1)
Lalganj-Domohani Rd (FR-8) proposed construction of one number 6.00m span slab culvert at 4th km (3.36 km) replacing the old damaged culvert under Asansol Highway Division , P.W.(Roads) Directorate in the District of P Bardhaman during the yr20-21
Construction of a Box culvert in replacement of a damage slab culvert at ch. 0.791 km of Pandabeswar-Samla (FR-21) Road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Emergent patch repairing work of different stretches at Chanda-Domohani Road (FR-14) from 8.00 kmp. to 8.50 km. and 9.00 km. to 9.50 km. by providing patching potholes, repairing potholes and 20mm premix carpeting work of Asansol Highway Sub-Division
Paraj R.S. to Silla Road from 7.50 km to 10.00 kmp for temporarry restoration work of the existing road by repairing potholes under Asansol Highway Division , P.W.(Roads) Directorate in the District of Paschim Bardhaman during the year 2020-21.
Galsi-Gohogram Road from 2.000km to 2.200km, 3.80 km to 3.9 km and 4.50 km to 4.60 km (in stretches) Patch Repairing work of the existing road under of Asansol Highway Division, P.W. (Roads) Directorate, in the district of Purba Bardhaman
Feasibility study, fixation of alignment for construction o 2 (Two) nos bridge A) Bakbandi Bridge over river Nuni at Khankhowa More near NH-19 B) Blue Factory Bridge over deep channel near Blue Factory over RCI Road under Asansol Highway Division
Left out portion of NH-2 to Durgapur Barrage Road (SH-9) from 6.00km. to 6.10km strengthening work of the existing carriageway under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Maintenance of Bigra-Dignagar(Ph-II0 road by potholes, premix cerpe etc. in stretches from 0.2 to 0.6km., 1.5 to 1.6km., 2.2 to 2.4km., 2.50 to 2.70km., 3.40 to 3.50km. and 4.40 to 4.50km. under Asansol Highway Division, P.W. (Roads) Directorate,
Selection of Developer for Development of E-Way Hub along Purvanchal Expressway and Bundelkhand Expressway
Refer to BoQ