Loading…
Loading…
1,425 results • Best match
Area Based Comprehensive Road Improvements, Strengthening and Maintenance in State Highways and Major District Roads for length of 168.20 Km in Gobichettipalayam and Nambiyur sub divisions of Gobichettipalayam Construction and Maintenance Division
Widening, Strengthening, Improvements to riding Quality including Reconstruction of Box Culvert and Construction of Centre Median and Protective wall works in the Government roads of Madurai Highways Cand M SubDivision MDU-055
Package-30 Widening, Improvements of Government roads in Vedasandur (Highways) C and M Sub-Division including CD work, Constriction of Retaining wall , Box Culvert , including Upkeeping for a period of 60 Months
Construction of Quality Control Building (Sub Work) for the work of Area Based Comprehensive Road Improvements,Strengthening and Maintenance is State Highways and Major District Roads for a Length of 253.877 Km...
Widening and Improvements Improvements to riding quality Drain CD works and Up Keeping for a period of 60 months to Government Highways roads in METTUPALAYAM H CM Sub Division JurisdictionPackage No 63
Widening Improvements Improvements to Riding Quality Reconstruction of Box Culvert CD Works and Construction of Protective Wall works in the Government roads of Thiruvadanai Highways C and M Sub Division MDU 021
Improvements, Construction of protective wall CC Drain and Up Keeping for a period of 60 months to Government Highways roads in Coonoor H C and M Sub Division Jurisdiction Package No. 21
Widening of Minor Bridge Construction of Culverts Reconstruction of Minor Bridge Culverts Construction of Retaining Wall and Construction of Drain on Government Roads in Ulundurpet Highways C M Sub Division TVM-36
Area Based Comprehensive Road Improvements, Strengthening and Maintenance in State Highways and Major District Roads for length of 133.40 Km in Sathyamangalam and Thalavadi sub divisions of Gobichettipalayam Construction and Maintenance Division
Area Based Comprehensive Road Improvements, Strengthening and Maintenance in State Highways and Major District Roads for a Length of 253.877 Km in Pattukottai and Peravurani Sub divisions of Thanjavur H CandM Division
Urban Developments Widening and Improvements Improvements to Riding Quality Construction of RCC Drain with Cover Slab Reconstruction of Culverts on Government Roads in Gudiyatham Highways C and M Sub Division TVM 9
Widening and Improvements Construction of Culverts Reconstruction of Culverts Construction of Retaining wall Construction of Drain and Curve Widening on Government Roads in Walajah Highways C and M Sub Division TVM 4
Widening and strengthening CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in KINATHUKADAVU H C and M Sub Division Jurisdiction Package No 36
Widening and Improvements Improvements to riding quality CD works Drain and Up Keeping for a period of 60 months to Government Highways roads in METTUPALAYAM H CM Sub Division JurisdictionPackage No 60
Widening, Strengthening, Improvements to riding Quality including Reconstruction of Box Culvert, Construction of Well Protective wall and Toe wall works in the Government roads of Vedasandur (Highways) CandM Sub-Division (MDU-025)
Package-34 Widening, Strengthening , Improvements of Government roads in Natham (Highways) C and M Sub-Division including CD work , Protective work using plastic waste , including Upkeeping for a period of 60 Months
Urban Improvements, Widening, Strengthening, including Junction Improvements, Widening of Slab culverts and Construction of Centre Median works in the Government roads of Madurai West Highways C and M Sub-Division MDU 058
Widening Improvements Reconstruction of Box Culvert Construction of Retaining wall Well Protective wall CD Works and protective works in the Government roads of Vedasandur Highways C and M Sub Division MDU 008
Package-23 Widening, Strengthening Improvements of Government roads in Dindigul (Highways) C and M Sub-Division including CD work Construction of Center median, Drain including Upkeeping for a period of 60 Months
Improvements to Riding Quality and Reconstruction of Box Culvert, Construction of Box Culvert, Minor Bridge, Providing Speed Breaker works in the Government roads of Devakottai Highways C and M Sub Division MDU121
Improvements to riding quality Widening of pipe culvert, Constrution of protective wall and Up Keeping for a period of 60 months to Government Highways roads in Kothagiri Sub Division Package No. 64
Construction of Quality Control Building (Sub Work) for the work of Area Based - Comprehensive Road Improvements,Strengthening and Maintenance is State Highways and Major District Roads for a Length of 253.877 Km...
Widening and strengthening Improvements to riding quality CD Works and Up Keeping for a period of 60 months to Government Highways roads in ANAIMALAI H CM Sub Division Jurisdiction Package No 42
Strengthening, , Improvements to Riding Quality, Reconstruction of Box Culvert, Construction of Retaining wall , Drain works, Raising the Concrete Shoulder, Providing Paver Blocks in the Government roads of Bodinayakkanur Highways Cand M SubDivisionM
Widening Strengthening, including Widening the Existing Pipe Culvert Reconstruction of Box Culvert and Construction of Retaining Wall and Toe wall Works in the Government roads of Oddanchathiram and Palani Highways CandM SubDivision MDU033
Urban Improvements, Widening and Improvements, including Construction of Retaining Wall, Drain, Reconstruction of Culvert and Providing Paver Block Works in the Government roads of Vathalagundu (Highways) C and M Sub-Division (MDU-030)
Improvements at km 1/500 - 4/050 of Cumbum - Cumbummettu Road including Construction of Retaining wall MD 90 works in the Government roads of Uthamapalayam Highways C and M Sub Division MDU 087
Widening and Improvements, Widening of curve CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Thalavady H CM Sub Division Jurisdiction Package No 11
Widening Strengthening including Reconstruction of Box Culvert Culvert Widening of Box Culvert Slab Culvert Construction of Retaining wall and Well Protective wall Works in the Government roads of Athoor Highways CandM SubDivision MDU020
Widening and Improvements with Paved ShouldersImprovements to Riding Quality Reconstruction of Culverts Construction of Drain and Construction of Centre Median on Government Roads in Vellore Highways C and M Sub Division TVM 7
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 65
Widening Strengthening including Widening the Existing Pipe Culvert Reconstruction of Box Culvert Construction of Retaining wall and Toe wall Works in the Government roads of Oddanchathiram and Vedasandur Highways CandM Sub-Division MDU025
Package-36 Widening Strengthening Improvements of Government roads in Athoor (Highways) C and M Sub-Division including CD work , Protective work, Retaining wall and Drain including Upkeeping for a period of 60 Months
Widening End to End and Improvements Construction of Storm Water Drain with Footpath Construction of Culvert Providing Junction Improvements Works in Government Roads of Erode Highways C and M Sub Division TPR 044
Widening and Improvements Improvements Improvements to riding quality Junction improvements and Up Keeping for a period of 60 months to Government Highways roads in COIMBATORE H NORTH CM Sub Division JurisdictionPackage No 50
Package-40 Widening, Improvements of Government roads in Oddanchathiram (Highways) C and M Sub-Division including CD work Constriction of Retaining wall using plastic waste , including Upkeeping for a period of 60 Months
Widening from Intermediate Lane to Two Lane and Strengthening at km 7/0 - 9/2 of Paramakudi - Keerandai Road including CD works in the Government roads of Paramakudi (Highways) CandM Sub-Division MDU073
Widening and Improvements Improvements to Riding Quality Construction Reconstruction of Cross Drainage Works Construction of Retaining Wall and Protective Wall in Government Roads of Bhavani Highways C and M Sub Division TPR 005
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 67
Widening and Improvements Widening of Culvert Reconstruction of Culvert Construction of Retaining Wall Construction of Well Protective wall Works in Government Roads of Kodumudi Highways C and M Sub Division TPR to 046
Widening and Improvements Improvements to riding quality CD works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in SULUR H CM Sub Division JurisdictionPackage No 66
Package45 Widening and Improvements of Government roads in Sivagangai Highways C and M Sub-Division including Reconstruction of Culvert , construction of Retaining wall ,Reconstruction of narrow and damaged pipe Culvert including Upkeeping for
Widening Improvements Improvements to Riding Quality Junction Improvements and Construction of Box culvert including Reconstruction of Culvert works in the Government roads of Thiruppathur and Karaikudi Highways C M Sub Division MDU 043
ImptsImpts to Riding Quality Rebuilding Laying Paver Block ReConstn of Box Culvert and Including Upkeeping for Period of 60 Months on Govt Roads in Krishnarayapuram Highways C M Sub Division Package No 23
Package 27 Widening Improvements of Government roads in Vathalagundu Highways C and M Sub-Division including CD work with approach road Constriction of Retaining wall including Upkeeping for a period of 60 Months
Package 22 Widening Improvements of Government roads in Dindigul (Highways) C and M Sub-Division including CD work Protective work and Drain using plastic waste including Upkeeping for a period of 60 Months
Package 46 Widening and Improvements of Government roads in Sivagangai (Highways) C andM Sub-Division including Reconstruction of Culvert , construction of Retaining wall ,Reconstruction of narrow and damaged pipe Culvert including Upkeeping for
Widening from Two Lane to Two Lane with Paved Shoulders and strengthening at km 16/9 - 19/9 of Thirukoilur - Asanur road on Government Roads in Ulundurpet Highways CandM Sub Division TVM 124
Widening and strengthening Improvements to riding quality CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in ANAIMALAI H CM Sub Division Jurisdiction Package No40
Widening and Improvements Improvements Construction of Retaining Wall Works and including Up Keeping for a period of 60 months on Government Roads in Udumalpet Highways C and M Sub Division Pkg No 31