Loading…
Loading…
11,001 results • Best match
Repairing of Udaynarayanpur section office and cleaning of compound premises under Amta Highway Sub-Division of Howrah Highway Division in the District of Howrah during the year 2026-2027
Construction of new drain at 6.30 Km chainage of NH 34 Eklakhi Railway Station Road under Gazole Highway Sub Division of Malda Highway Division in the district of Malda.
Protective work Thakurnagar to Ramchandrapur via Sasadanga between 1.00km to 3.00 km Road under Bongaon Highway Sub Division of Barasat Highway Division No. II, in the District of North 24 Parganas.
Clearing of Bridge and Culvert of Amta Highway Section Amta Highway Sub-Division under Howrah Highway Division, in the district of Howrah during the year 2026-2027
Construction of Bituminous Road from Bhavanipur (Rail Gate) Laltu Sk house to Gholdaha Sosti s House via State highway (Belayet Munsi Collage) under Kalmegha GP Lalgola Block.
Bhedia Chora road emergent repair by potholes, Premixcarpet etc. in different stretches from 4.00 kmp to 5.00 kmp, 12.0 kmp to 13.0 kmp, 14.50 km to 15.30 km, 15.60 km to 16.60 km under Sadarghat Highway Sub-Division No-II of Asansol Highway Division
Emergent patch repairing of link road from Madhaigunj village to Muchipara Shibpur road from 0.00 km to 0.800 km, 5.70 km to 7.00 km and 8.2 km to 9.20 km in stretches under Durgapur Highway Sub-Division of Asansol Highway Division, FY-2024-25
Construction of P.C.C. road from the H/O Anup Santra to the Durgapur Expressway at Mohistikari under Chandanpur Gram Panchayat within Haripal Dev. Block
Annual Maintenance for Three Years of landscaping and beautification work at Vidyasagar Setu toll plaza and approaching road from toll plaza to Kona Expressway
Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH117 in the state of West Bengal on EPC mode
Supplying and installation of signage Board to the Bridges and Roads under Mankar Highway Section of Durgapur HighwaySub-Division
Construction of RCC drain from Asian highway via Custom Office to Babupara
Bamboo barricade at Hasnabad Bridge for safe under Basirhat Highway Sub-Division
Construction of Culvert from Bansgarh Highway to the house of Lal Kumar
CONSTRUCTION OF PCC ROAD FROM CHANDU MANDI HOUSE TO HIGHWAY AT MOYNA
INSTALLATION OF SHADE AT KALYANI HIGHWAY BUS STAND AT KAYRAPUR SANSAD 18
Highway Khadempukur Village Road with in Illambazar Block (Road Length 5.785 km)
Emergent repairing and Restoration Work In Stretches between 39.800 km to 42.900 km of NH 131A under National Highway Division No VII in the District of Malda during the year 2023to24
Repairing and maintenance of NH Division-V office with other allied works at Barasat in the District of North 24 Pgns under National Highway Division-V, during the year 2023-24.
Repairing work to the office of the Executive Engineer, National Highway Division-V at Dakbunglow More under N.H.Division No.V in the District of North 24-Parganas during the year 2020-21.
Supplying of Security Personnel (without Arms) on purely temporary basis for guarding at Mrigala Inspection Bungalow, offices etc. under the jurisdiction of Executive Engineer , National Highway Division-I, P.W. (Roads) Directorate.
SITC of IT Infrastructure work at Office of The Superintending Engineer National Highway Circle-II , located at 1st floor of Existing Office of CE WZ PWD Building, Durgapur, Dist. Paschim Bardhaman.
Consultancy Services for preparation of DPR for the work Stage strengthening work between chainage Km. 25.700 to Km 31.000 of NH12 under National Highway Division -V during the year 2025-26.
Thakurnagar Ramchandrapur Road via Sosadanga from Ch.1.00km to 4.170km Emergent patch repairing in stretches under Bongaon Highway Sub Division of Barasat Highway Division No.II in the district of North 24 Parganas.
REPAIRING OF ROAD BY LAYING INTERLOCKING CONCRETE BLOCK AT E.M. BYPASS SERVICE ROAD (NORTHERN FLANK) FROM PC CHANDRA GARDEN, GATE NO-1 TO BASANTI HIGHWAY IN WD-66 UNDER BR- VII
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Kharagpur-Chandikhol-Cuttack-Khorda-Tangi section of Kharagpur-Cuttack-Visakhapatnam Corridor passing through the
Repairing potholes by precoated chips at different Roads within the jurisdiction of Sadarghat Highway Sub-Division No. II under Asansol Highway Division, P.W.(Roads) Directorate
Road Sefety work at Ch. 1.80 Kmpnear Hastikanda of Kastogoria to Thakurpura road under Mollarpur Highway Sub-Divisioon of Birbhum Highway Division-I, in the district of Birbhum during the year 2025-26.
Patsimulia Boaldah Road from 0.00 Kmp to 5.00 Kmp, Emergent Patch Repairing work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II in the District of North 24 Parganas.
Chandpara Palla Road from Ch. 0.00 Kmp to Ch. 3.40 kmp, Except from Ch.1.157 km to Ch. 1.249 km and from Ch. 1.593 km to Ch. 1.664 km, Emergent Patch Repairing work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II,
Emergent patch repairing of Muchipara Shibpur Road from 1.50 km to 3.00 km, 4.70 km to 6.20km, 9.10 km to 10.80 km, 13.30 km to 14.20 km and 15.30 km to 16.50 km in stretches under Durgapur Highway Sub-Division of Asansol Highway Division FY-25-26
Operating and guarding the existing pumping station at Sreebhumi on KNI avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Hiring of One No. inspection vehicle for 01(One) year for the office of the Assistant Engineer, Kakdwip Highway Sub-Division of Diamond Harbour Highway Division, P. W. (Roads) Directorate.
Operating and guarding the existing pumping station at Sreebhumi on KNI avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Operating and guarding the existing pumping station at Sreebhumi on KNI avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the district of North 24 parganas.
Operating and guarding the existing pumping station at Sreebhumi on KNI avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Patch repair work of Baguihati Hatiara Road from 0.00 kmp. to 0.50 kmp. under Baguihati Highway Sub Division under Barasat Highway Division No.I in the district of North 24 Parganas.
Plantation of Road side Garden near Raghunathpur and Teghoria on K.N.I Avenue under Baguihati Highway Sub-division under Barasat Highway Division No. -I in the District of North 24 Parganas.
Patch repairing at Bagu High School Road from 0.000 kmp to 1.000 kmp Under Baguihati Highway Sub-Dn. of Barasat Highway Division No.I, in the District of North 24 Parganas.
Supply of materials at Amta Stackyard for emergency repairing work during monsoon under Amta Highway Sub Division under Howrah Highway Division in the District of Howrahduring the year-2025-26
Hiring of One No. inspection vehicle for 01(One) year for the office of the Assistant Engineer, Kakdwip Highway Sub-Division of Diamond Harbour Highway Division, P. W. (Roads) Directorate
Patch repairing of Patipukur Rajarhat Road from 0.00 kmp. to 1.60 kmp. under Baguihati Highway Sub-Division under Barasat Highway Division No. I in the District of North 24 Parganas.
Operating and guarding the existing pumping station at Sreebhumi on KNI avenue under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
Repair of Kestopur subway Eastern side road in front of Desopriyo Balika Vidalaya under Baguihati Highway Subdivision under Barasat Highway Division No. - I in the District of North 24 Parganas.
Bridge at 1st. Kmp. of Kalipahari Tirat Road, Rehabilitation work, under Asansol Highway Division in the district of Paschim Bardhoman.
Road safety work of Panagarh-Illambazar road by raised pavement markers/Road Studs/ Cats Eye etc. under Asansol Highway Division
Supply and laying of different size cables and Replacement of the damaged loopbox cover of each pole by new one at Basanti Highway (From FP. 01 to FP.05) as and when required.
Bongaon Jhowdanga Panchpota Road from 12.00 Kmp to 15.00 Kmp Emergent Patch Repairing work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II in the District of North 24 Parganas.
Periodical Cleaning and up keeping of Bunglow and Stackyard premises of Bongaon Highway Sub-Division office, Maslandapur Section office, Bibhutibhusan Smriti Ghat and Chandpara andPanchpota stackyard premises under Barasat Highway Division No. II Gov
Periodical Cleaning and up keeping of Bungalow and Stackyard premises of Bongaon Highway Sub Division Office Maslandapur Section Office Bibhutibhusan Smriti Ghat and Chandpara an Panchpota stackyard premises under Barasat Highway Division No. II