Loading…
Loading…
11,192 results • Best match
Adina Chakli Road, Patch repairing work from 20.31 km to 25.66 km (in strenches) under Malda Highway Division in the district of Malda.
Sirkabad Ajodhya Bagmundi Road from 0.00kmp to 27.462km, Road Saftey Work under Purulia Highway Division in the district of Purulia. Project ID PD232406684S000
Restoration of damaged flank from 0.00kmp to 4.00kmp of Salbari-Nagurhat road under Cooch Behar Highway Division in the district of Cooch Behar
NH-2 to Durgapur Barrge road emergent patch repairing work from 0.00kmp. to 1.00kmp. and 2.50kmp. to 4.00kmp. of Durgapur Highway Sub-Division
Emergent Patch Repair works in Belpahari-Banspahari Road from 21.00 km to 23.80 km under Jhargram Highway Division in the district of Jhargram
Rampurhat-Parulia Road from 0.00 Kmp to 3.70 Kmp, surfacing work in stretches under Murshidabad Highway Division No.II during the year 2025-26
Bishnupur-Patrasayer Road from 25.00 Kmp to 32.55 Km., surfacing work under Bankura Highway Division, P.W. Roads Dte. in the district of Bankura
Emergent Patch Repair works in Dharsa - Belpahari Road from 0.00 km to 3.00 km under Jhargram Highway Division in the district of Jhargram
Giladanga Pakhihaga road from 1.00km to 2.00 km embankment protection by providing bamboo walling, under Coochbehar Highway Division in the dist of Coochbehar.
Urgent boulder protection work beside culvert at ch. 2.5 km of Patgram Bhutan road under Coochbehar Highway Division in the district of Coochbehar
Maruganj VR 0.00km to 2.00km (in stretches) post monsoon potholes repair work under Cooch Behar Highway Division in the district of Cooch Behar.
Construction of shelves at Midnapore Highway Division Office in the district of Paschim Medinipur during the year 2025-26. (Ch. To Non-Plan)
Construction of Toilet attached to Divisional Accounts Officer Room of Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Agardanga-Simulia Road from 0.00 Kmp to 1.75 Kmp repairing work in stretches under Murshidabad Highway Division No.II during the year 2025-26
Emergent Patch repair to Haroa-Ranigachi Road from 0.50Km to 2.80Km under Barasat Highway Division No.I in the dist. of North 24-Parganas.
Salar-Kharera Road from 0.00 Kmp to 6.70 Kmp repairing work in stretches under Murshidabad Highway Division No.II during the year 2025-26
Kupila - Katakopra Road , 0.00 Kmp to 3.75 Km Surfacing Work under Murshidabad Highway Division No. I in the District of Murshidabad. (3rd Call)
Salar-Kharera Road from 1.00 Kmp to 6.90 Kmp Repairing work in stretches under Murshidabad Highway Division No.II during the year 2024-25
Patch Repair works in Narayanpur - Silda Link Road from 0.00 kmp to 2.15 km under Jhargram Highway Division in the district of Jhargram.
Manbazar-Bandwan-Kuilapal Road from 27.50km to 43.17km, Surfacing of Road under Purulia Highway Division in the district of Purulia. Project ID PD232400778S000
Emergent restoration of rain cut damages and hard shoulder of Bindol Bhatol Road from 0.00 km to 4.00 km Uttar Dinajpur Highway Division
Kenda Sindri Road via Ranjowagarh, Keshiaya, Banjora more, from 0.00kmp to 5.00kmp, Surfacing work under Purulia Highway Division in the district of Purulia.
Hura-Puncha Road from 0.00 Kmp to 10.00 Kmp, Surfacing work under Purulia Highway Division in the district of Purulia. (Project ID -PD192018251S000)
Repairing of Residential Government Staff Quarter Building and Residential Quarter of Executive Engineer under Murshidabad Highway Division No.II during the year 2026-27
Jangipara Boral Road from 0.000 KM to 3.420 KM Surfacing Work under Hooghly Highway Division-I in the district of Hooghly 2nd Cal)
Sutanga Bridge at 1st KM of Jamaldah - Ranirhat Road, Rehabilitation works under Coochbehar Highway Division in the district of Coochbehar. Project ID PD202127961S000.
Emergent protection of road flank of SH-16 Road from 52.00km to 58.00km stretches , under Coochbehar Highway Division in the dist of Coochbehar.
Santiniketan Prantik Station Road (two lane) from 0.050 kmp to 1.150 kmp emergent repairing and maintenance(in stretches) under Birbhum Highway Division-II
Brahmani bridge over river Brahmani at 12.00kmp of Katwa_Karui Road Rehabilitation work under Burdwan North Highway Division in the dist of Purba Bardhaman
Salbari Nagurhat road from 1.00 kmp to 6.00 kmp, Patch repairing work under Cooch Behar Highway Division in the District of Cooch Behar.
Clearing drain and jungle cutting from 16.00 Kmp to 28.00 Kmp of Garidhura-Mirik-Simanabusty Road under Darjeeling Highway Division during 2020-21.
Emergent restoration of culvert approach protection at Ch. 11.68 km of Odlabari Kranti Road under Jalpaiguri Highway Division in the district of Jalpaiguri
Repairing and Rehabilitation of Bridge at Guma Rajibpur Balisha Road under Barasat Highway Division No II in the district of North 24 Parganas
Bijoy Pharmacy to Bhatsala road Emergent Patch repairing work In Stretches under Barasat Highway Division II in the District of North 24 Parganas
Painting Works of Majherhat R.O.B. under Howrah Highway Division, in the district of Howrah during the year 2025-26. (Under Head Non Plan)
Kandi-Municipality Link Road from Ch. 0.00 Km to 0.05 Km, Widening work under Murshibad Highway Division No.II during the year 2026-27
Ground Floor of Mahishrekha Rest Shed, Floor Repairing Work under Howrah Highway Division, in the District of Howrah during the year 2026-27
Garidhura-Mirik-Simanabusty Road Ch. 13.70 Km Protection work under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27.
DRAIN UPGRADATION FROM AMIT DUTTA HOUSE TO ASIAN HIGHWAY ROAD (150 MTR) AT PART NO- 25/261 WITHIN ATHARAKHAI GP UNDER MATIGARA BLOCK
Marwari Patty road from 0.00kmp to 0.50km, patch repairing work in stretches under Cooch Behar Highway Division in the district of Cooch Behar
Mahishkuchi Dakbunglow road from 0.00kmp to 1.20km, patch repairing work in stretches under Cooch Behar Highway Division in the district of Cooch Behar
Alipurduar-Kumargram Road from 17.60km. to 19.50km. Bituminous Patch repairing work under Alipurduar Highway Division in the district of Alipurduar during 2026-27.
Desilting of drain at 1) Unsani Dakshin Para Birth Ghat to Shakti Nagar High Drain 2) North Unsani Pally Unnayan Samity Club to Dulhan Dress. 3)Unsani Laskar Para to Unsani Boro Bagan. 4) Gorpa Shetalatala Via Railway calvert to kona Expressway. 5)
Structural Cost of 4(Four) nos small Police Kiosk Chatterjeehat for construction of six lane elevated kona expressway in the state of West Bengal. (Area 5.00 m X 2.00 m) at chainage (0 540),(1 300),(1 660),(0 400)LHS (Erection Work)
Construction / Improvement Of Drain At West Sreenagar Maim Road From House Of Manik Karmakar To Belgharya Expressway Service Road And From House Of Late Hare Krishna Das To House Of Rabin Ghosh Infornt Of Almira Karkhana And From House Of Manoj Das T
Desilting of drain at 1) Unsani Dakshin Para Birth Ghat to Shakti Nagar High Drain 2) North Unsani Pally Unnayan Samity Club to Dulhan Dress. 3)Unsani Laskar Para to Unsani Boro Bagan. 4) Gorpa Shetalatala Via Railway calvert to kona Expressway. 5)
guardrail for highways Average Turn Over of Last 3 Years 1000 Lakh (s) Experience with Gov. Required 5 Year (s) Guardrail For Highways ( 5483 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Type Guard Rail Set One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard) ; One set of WSS-1: W- Beam 1 No.Posts 2 Nos. Spacers 2 Nos. Dome headed Bolts 10 Nos. Hexaxonal Headed Bolts 4 Nos. The Length of Post 1800mm (standard) ; DGSamp;D Drawing No. DGS&DG RAILWSS1 * DGSamp;D Drawing may be downloaded from the url https:dgserver.dgsnd.g ov.inrcDRG.Highway20 Rail.pdf * Compliance to DGSamp;D Drawing Yes * Read DGSamp;D Drawing and fully understood Yes * 1/3 CONSTRUCTIONAL Length of Beam, (mm) 4318.0 4318.0 Width of Beam 311 mm for W-Beam section 311 mm for W-Beam section Depth of Beam (mm) 83.0 * Thickness of Beam (mm) 3.0 * Mass of Zinc coating for W-Beam, PostSpace channel, Fish Tail Terminal, Bolt & Nut, washer (g/m2) 550.0 * CERTIFICATION ISI Marked HR Coil to IS:5986, latest, Grade 255, min. Yst 255MPa, T.S 520MPa, Elong., 17% Yes * Test Report for ISI marked HR Coil amp; Zinc Coating from Govt/NABL/ILAC accredited lab to prove conformity to the specification Yes * Test Report No and Date - * Name and Address of the Lab - * Test Report to be furnished to the buyer on demand Yes * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 K V G K Ranga Raju 734007, OC 532 SSTC C/O 99APO Teen Batti More Silliguri 5483 45
Chhatna Kantasol Road Ch 0.000 Kmp to 1.900 Km in stretches repairing and maintenance work under Bankura Highway Division in the district of Bankura.
Emergent repairing and maintenance work of DVC Feeder road in stretches from 1.00km. to 2.00km. and 3.00km. to 4.00km. of Durgapur Highway Sub-Division
Bouti Bridge at 7th km of Coochbehar - Baneswar - Alipurduar Road, Rehabilitation work under Coochbehar Highway Division in the district of Coochbehar. Project ID PD202127822S000