Loading…
Loading…
11,205 results • Best match
Amlai Link Road from 0.00 Kmp to 2.50 Km by brick stitching work in stretches under Murshidabad Highway Division No.II during the year 2026-27
Bharatpur-Lohadahaghat Road from 0.5 Kmp to 4.50 Kmp by brick stitching work in stretches under Murshidabad Highway Division No.II during the year 2026-27
Link Road to Amgachia Health Centre, Repairing and Maintenance Work in patches under South 24- Parganas Highway Division in the District of South 24 Parganas
Emergent road side protection work at 6th KM of Cooch Behar Baneswar Alipurduar road (SH-16) under Coochbehar Highway Division in the district of Coochbehar.
Hatinada Khamar road, From 13.50 Km to 20.00 Kmp, Dressing ,Chilchalling and Restoration of Road Flank under Purulia Highway Division in the District of Purulia.
R.C.C. Box Bridge over local khari at 0.60th Km of Dewanhat - Balarampur Road,Rehabilitation Work under Coochbehar Highway Division in the District of Cooch Behar .
Salkia-Panutia Road from 0.00 Kmp to 11.30 Km, Dressing and chilchalling works in stretches under Murshidabad Highway Division No.II during the year 2026-27
Flank restoration and repairing of HP Culvert at Ch 2.7 km of Raiganj Barsoi Road under Uttar Dinajpur Highway Division during the year 2026 27
Manbazar Bandwan Kuilapal Road, from 40.00 kmp to 43.170 km, repairing of road surface in stretches under Purulia Highway Division in the district of Purulia.
Bandwan Asanpani Road, chainage from 0.00 kmp to 3.00 kmp, repairing of road surface in stretches under Purulia Highway Division in the district of Purulia.
Chakberia (Kalabaru Ghutiari Shariff) Road from 0.00 to 4.070 Km Surfacing work under South 24 Parganas Highway Division in the district of South 24 Parganas
Tufanganj-Dhalpal-Bhatibari road from 4.00kmp to 6.00kmp, restoration of hard shoulder in stretches under Cooch Behar Highway Division in the district of Cooch Behar
Repairing the east side boundary wall along with meter room of Mora torsha stackyard under Cooch Behar Highway Division in the district of Cooch Behar
Bhaluka Bazar to Bhaluka Road Railway Station road from 0.00 kmp to 7.80 km, Strengthening work under Malda Highway Division in the District of Malda.
Patch repairing work both side approach road of Bhagirathi Bridge and Miyapur ROB in stretches under Murshidabad Highway Division No.I. during the year 2025-2026.
Muchia-Singabad Road from 0.260 km to 8.310 km, Surfacing work under Malda Highway Division in the District of Malda Project ID PD252648046S000 (2nd CALL).
Internal ring road with Gajoldoba Tourism Hub at ch 1.4 km Emergent repair and restoration work under Jalpaiguri Highway Division in the district of Jalpaiguri
Simulpur Chatra Road from 0.00 km to 3.00 Km Emergent Patch Repairing work under Barasat Highway Division No.II in the District of North 24-Parganas.
Habra Kumra Road from 8.00 km to 10.50 Km Emergent Patch Repairing work under Barasat Highway Division No.II in the District of North 24-Parganas
Patgram Bhutan Cross Road from 0.00 kmp to 10.00 km, Surfacing work under Coochbehar Highway Division in the district of Coochbehar. Project ID PD 252639861S000.
Hatimore to Ambari-Falakata road installation of Road marking and Cats eye for existing speed bumps under Jalpaiguri Highway Division during the year 2026-27
Hiring of inspection vehicle under Murshidabad Highway Division No.II, P.W. (Roads) Directorate for use of the Assistant Engineer, Quality Control Sub-Division, P.W. (Roads) Directorate
Mathabhanga Hazrahat road from 2.00 KM to 5.00 KM (in stretches) patching and repairing potholes work under Coochbehar Highway Division in the district of Coochbehar.
Khalaigram to Khetifulbari road from 5.00km to 8.00 km, emergency patch maintenance work in different stretchts under Jalpaiguri Highway Division in the District of jalpaiguri.
Krishnagar - Debipur - Jalangi Road from 4.500 km. to 8.00 Kmp. surface repairing work (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
Barasat Byepass Road from 10.00 km to 11.90 Km Emergent Patch Repairing work under Barasat Highway Division No.II in the District of North 24 Parganas.
Balarampur-Barabazar-Sindri Road, from 25.00 Kmp to 32.00 Kmp, Maintenance and repair work in stretches under Purulia Highway Division in the district of Purulia.
Repair and renovation of E.I work for VVIP visit at Bishnupur Bungalow, Rest House at the Bishnupur stackyard under Executive Engineer, Bankura Highway Division, P.W.Dte.
Patch repair works on Ghatdurlabhpur Madhaipur Road from 0.00 Kmp to 1.2 Km in stretches under Birbhum Highway Division-II, in the District of Birbhum
Patch repair works on Rajnagar Khoirasole Road from 9.00 Kmp to 11.00 Kmp in stretches under Birbhum Highway Division-II in the District of Birbhum
Dihibhurshut to Rampur Health Centre Link Road from 0.00 kmp to 2.30 km, Widening and Strengthening work , under Howrah Highway Division, in the district Howrah
Kanupur -Bahutali road from Ch. 3.60 Km to 5.60 Km Patch repairing work in stretches under Murshidabad Highway Division No.I. during the year 2026-2027.
Rangdhamali to Bodaganj Road from 0.00 kmp to 6.30 kmp, Surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 252637797S000.
Peshoke Mungpoo Road Parapet painting from Ch. 0.00 kmp to 17.00 kmp under Darjeeling Highway Division in the district Darjeeling during the year 2026-27.
Taldangra Panchmura Chowbeta Road from ch. 5.00 km. to 10.00 km. Clearing bushes, disposal of garbage under Bankura Highway Division in the district of Bankura.
Sahebbari Hat village Path from 0.00 Kmp to 9.14 Km, patch repairing work in stretches under Cooch Behar Highway Division in district of Cooch Behar.
Katlamari Health Centre Road from 0.300 km. to 1.950 Km. surface repair work (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
Tufanganj Balabhut road from 4.0 km to 6.0 th km, Patch repairing work in stretches under Cooch Behar Highway Division in district of Cooch Behar.
Sir, pls approve ok
Dudhia Bridge at 5.70 Km of Garidhura-Mirik-Simanabusty Road Rehabilitation work in the district of Darjeeling under Darjeeling Highway Division during the year 2020-21.
Patch repair works on Dubrajpur Hetampur Feeder Road from 2.13 Km to 3.50 Km in stretches under Birbhum Highway Division-II, in the District of Birbhum
Pirakata - Sijua-Goaltore Road from 0.000 kmp to 16.157 kmp, patch repair under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Tajpur - Betahut Road from 0.00 kmp. to 9.45 km, Surfacing work under Tamluk Highway Division in the district of Purba Medinipur. Project ID PD212244735S000. 2nd Call
Basirhat College to Champapukur Road from 0.00 Kmp to 4.50 Km,Surfacing work under Barasat Highway Division No. I in the district of North 24 Parganas.
Raina Jamalpur Road from 0.00 kmp. to 10.00 kmp., strengthening work under Burdwan South Highway Division in the district of Purba Bardhaman Ch. to.- RIDF-XXVIII.
Chandpara Nahata Akaipur Road from 10.23 Km.to 23.73 Km. Strengthening Work under Barasat Highway Division No-II, in the District of North 24Parganas under RIDF-XXVIII
Pachundi - Uddharanpur Road from 0.00 kmp. to 2.00 kmp, Widening and Strengthening work under Burdwan North Highway Division in the district of Purba bardhaman. (2nd Call)
Installation of Height restriction bar on distressed Khukurda Bridge at 9.90 km of Panskura - Ghatal Road under Midnapore Highway Division in the District of Paschim Medinipur.
Ranaghat - Aanghata (Old) Road From 0.00 kmp to 12.11 kmp, Strengthening work under Nadia Highway Division No. II in the district of Nadia under RIDF-XXVI
Emergent Patch repair to Arbelia R.S. to Arbelia Village Road from 2.45Km to 5.50Km under Barasat Highway Division No.I in the dist. of North 24-Parganas.