Loading…
Loading…
11,244 results • Best match
Samaspur Baghon road from 0.00 kmp to 7.43 km, providing metal beam Crash Barrier, Traffic Safety Measures work under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur (2nd CALL).
Potholes repairing of Dhadika to Kalyan Chak Road from 0.00 kmp to 20.00 kmp, Patch repair work under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Jibanti-Sherpur Roads from 13.50 Km to 14.00 Km, 14.50 to 15.00 Km and 17.10 Km to 17.60 Km patch repair under Murshidabad Highway Division No.II during the year 2020-21
Emergent road safety works in connection with distressed Khukurdaha Bridge at 9.90 Km of Panskura - Ghatal Road under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Garidhura-Mirik-Simanabusry Road restoration of khadside road bench damaged due to heavy rain at 26.95 km under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Jalpaiguri to Choulhati road-Emergency damaged Near bridge aboutment Repairing work at ch. 6.80kmp (At Jamuna Bridge) under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2023-24.
Repairing Potholes and mending damaged wearing coarse from 0.00 Km to 2.00 km of Ambari Falakata Rly Crossing to Paramunda More Road under Jalpaiguri Highway Division in the district of Jalpaiguri
Installation of concertina barbed wire at the top of the existing Boundary wall of Salar Stackyard under Murshidabad Highway Division No.II in the district of Murshidabad during the year 2023-24
Upper Chengmari T.G. to Nepali Line Bhutan Border Road ch. 0.490km to 0.565km(L.H.S) Embankment protection work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2025-2026.
Emergent Restoration in Patches of Kankra Kachua Road from 0.00Km to 0.85Km, 2.05 to 2.55Km and 3.10Km to 3.95Km under Barasat Highway Division No.I in the district of North 24-Parganas
Garidhura-Mirik-Simanabusty Road restoration of khadside road bench damaged due to heavy rain at 21.1 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Dhadika -Kalyanchak Road from 0.00 kmp to 15.00 kmp, patch repairing work in different stretches before monsoon under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Matigara- Kurseong Road, Clearing of Drain, Jungle cutting and white washing from 14.90 km to 21.00 Kmp under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Construction/Installation bituminous Speed Breaker along with traffic signage at Basirhat College to Champapukur Road under Basirhat Highway Sub-Division of Barasat Division No.I in the dist. of North 24-Parganas.
Monteswar Dainhat Road SH-15 from 0.00 Kmp to 24.500 Km, Surfacing work under Burdwan North Highway Division in the district of Purba Bardhaman. Ch. to.- State Development Schemes. (2nd Call)
Sinking of 1(one) No.100 mm x 50 mm dia. P.V.C. Tube well at Amjhora Stack yard under South 24 Parganas Highway Division in the District of South 24 Parganas.
Uluberia - Boaliaghat Road from 8.00 Km to 12.48 Km Emergent Patch Repairing and Flank Restoration work under Howrah Highway Division in the district of Howrah for the year of 2025-2026
Nilgunj-Santoshpur Road -- Emergent repairing work from 6.0 Kmp. to 8.3 Kmp. in stretches under Barasat Highway Division No.II in the dist. of North 24 Parganas during the year 2023-24.
Dinhata Balarampur Road from 10.00 km to to 20.00 km, emergent rain damage repairing work (in stretches)(2nd Phase) under Coochbehar Highway Division in the district of Coochbehar during 2025-26.
Installation of speed breaker with informatory boards and sign boards of different roads under Falta EPZ Highway Sub-Division in the district of South 24 Parganas during the year 2025-26.
Chotojagulia Kotra Road Emergent potholes repairing work from 4.00 kmp 6.50 kmp in stretches under Barasat Highway Division II in the district of 24 Parganas North during the year 2023 2024.
Bamangachi Fultala TO Auxillium Convent School Road from 1.80 Kmp to 3.80 Kmp Emergent potholes repairing work under Barasat Highway Division NoII in the dist Of North 24 Parganas 2nd Call
Protection work near approach road of temporary R.S.J. Bridge PANA at Ch. 9.25km. of Kalchini-Jaygaon road under Alipurduar Highway Division in the district of Alipurduar during the year 2021-22.
Gocharan-Dhosarhat Road from 0.00 kmp to 5.00 kmp, emergent patch repairing work in different stretches under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-08)
JATIAKALIMORE TO GADRA ROAD AT CHAINAGE 4.95KM CULVERT REHABILITATION WORK AND CHAINAGE 3.50KM FOR EMERGENT FLANK PROTECTION WITH PCC TOE WALL WORK UNDER JALPAIGURI HIGHWAY DIVISION DURING THE YEAR 2023 24
Bamangachi Fultala-Auxillium Convent School Road from 0.80 kmp. to 3.80 Kmp Emergent potholes repairing work in stretches under Barasat Highway Division No II in the dist. of North 24 Parganas
Shifting of office of West Bengal Highway Development Corporation Limited from 4th and 5th floor of HRBC Bhavan, Munshi Premchand Sarani, Hastings to Dr. Deodar Rahaman Road, Lake Gardens, Kolkata-700033
Gabtala Bridge Approach at 7th kmp of Sikharpur kulti Canal Road, repairing painting and maintenance work under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-01)
Kulgachi Barnia Road from 0.00 Kmp. to 10.00 Km., Emergent Potholes repair under Nadia Highway Division No. I in the District of Nadia during the year 2020 2021 (Pre Monsoon work)
Narajole - Daspur Road from 1.50 km to 7.50 km, patch repairing work in different stretches before monsoon under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Chhatna-Susunia-Kusthalia road at Ch-13.91 km Chandra-Dhapali Repairing of Both sides Bituminous Road Approaches of the Temporary Diversion Road under Bankura Highway Division in the district of Bankura.
Garidhura-Mirik-Simanabusty Road, Clearing of Drain, slip and jungle cutting from 6.00 kmp to 12.00 kmp under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Fatepur-Dehaband Road, from 4.00 km to 9.50 km, Maintenance of Road Flank Portion under Dakshin-Dinajpur Highway Division in the district of Dakshin-Dinajpur during the year of 2022-23
Laskarhat - Tapan Road from 1.00 Kmp to 6.00 Kmp (in Stretches), Emergent patch repairing works under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-2026.
Emergent Maintenance Work for repairing of Boinchee Bhastara Majinan Belmuri Road from 16.00 Km. to 16.50 Km. in patches work under Hooghly Highway Division No. I in the District of Hooghly
Emergent Restoration in Patches of Kankra-Kachua road from 4.20Km to 4.90Km, 5.70Km to 6.25Km and 7.20Km to 7.60Km under Barasat Highway Division No.I in the dist. of North 24-Parganas
Kuye Bridge (Rejaul Karim Setu) over river Kuye at 17.35 Km of Kuli - Burwan - Gramsalika - Majlishpur - Ramjibanpur Road, Rehabilitation work under Murshidabad Highway Division No II in the district of Murshidabad.
Pandua-Kulti Road from 0.81 km to 1.79 km and 2.40 km to 2.60 km (in stretches) maintenance and repairing work under Burdwan South Highway Division during the year 2025-26
Kashiram Das Setu (charki Bridge) over river Ajoy at 97th km. of Ramjibanpur Ketugram Katwa Road (SH-6), Rehabilitation work under Burdwan North Highway Division in the dist of Purba Bardhaman.
Garidhura-Mirik-Simanabusty Road, Clearing of Drain, Slip and Jungle Cutting from 8.00 kmp to 16.00 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Pailan Nepalgunj Road from 0.00 kmp to 7.40 km, Repairing and Maintenance work in Patches at different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Box Bridge over local Khari at 2nd Km and 4th Km of Pransagar to Dahapara Road, Rehabilitation work under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur.(2nd Call)
Bankura Saltora Road Ch. 3.00 kmp to 4.00 kmp and Ch. 14.00 kmp to 20.00 kmp in stretches Maintenance and Repairing work under Bankura Highway Division in the district of Bankura.
Khudiram Road from 0.000 kmp to 4.000 Kmp, Surfacing work, Concrete Paver Block Pavement in stretches including construction of cross drainage structures, Surface drain and Protective works under Midnapur Highway Division
Repair and Maintenance of Kakdwip-Streamerghat Road from 0.934 kmp to 1.384 kmp under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela - 2023
Repairing of protection work of approach of the slab culvert at Ch. 17.50kmp. of Alipurduar-Kumargram Road under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Re-Construction of single barrel Hume Pipe (1200 dia) culvert at 2.130 Km in place of damaged culvert of Boro-Jamtoria Road under Purulia Highway Division in the District of Purulia.
Road Furniture and Traffic Safety Measures near Majhir Bari at Ch.38th km of Changrabandha -Jamaldaha-Mathabhanga Road ( SH-16),under Cooch Behar Highway Division,in the dist of Cooch Behar.
Pandua Kulti Road from 0.10 km to 0.80 km and 1.80 km to 2.40 km (in stretches) maintenance and repairing work under Burdwan South Highway Division during the year 2025-2026
Emergent embankment repairing and protection work from 75.00km to 77.00km (in stretches) of Mathabhanga-Cooch Behar road (SH-16) under Cooch Behar Highway Division road in the district of Cooch Behar