Loading…
Loading…
11,009 results • Best match
Repair works of the Official residence of the Rest Shed Banglow at Mangalbari Malda Highway Division, Outside Plaster Putty, Painting and allied works in the District of Malda under Malda Highway Division, during the year 2022 2023.
CONSTRUCTION OF TEMPORARY PANDEL AND WOODEN PLATFORM FOR THE PERIOD FROM 09.01.2024 TO 17.01.2024 AT K2 BUS STAND IN GANGASAGAR ISLAND ON THE OCCASION OF GANGASAGAR MELA - 2024 UNDER KAKDWIP HIGHWAY SUB-DIVISION, DIAMOND HARBOUR HIGHWAY DIVISION
Cleaning and maintain the drain during the monsoon period from Haldiram Junction to Airport 1 no. of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No. - I in the District of North 24 Parganas.
Day to day sweeping the road pathway and removal and disposal of waste materials from 13.700 kmp. to 14.564 kmp. on both side of Jessore Road under Baguihati Highway Sub Division of Barasat Highway Division No-I
Cleaning and repairing of drainage system in both side flank from 1.00 Kmp. to 3.00 Kmp. of Dumdum - Lauhati Road under Baguiati Highway Sub-Division under Barasat Highway Division - I, in the District of North 24 Parganas.
Emergent repairing of damaged black top surface of Domjur-Baluhati-Jagadishpur Road from Km. 1.50 to Km. 3.65 of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah during the year 2026-27
Protection work by providing Eucalyptus Bullah due to high tide river water passing through deep drain at north west side of Kakdwip Highway Sub-Division office building and adjacent campus road under Diamond Harbour Highway Division
Emergent repairing of Kunur bridge at 9th km of Muchipara - Shibpur Road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26(2nd Call)
Emergent repairing of different stretches at Kalipahari-Tirat Road (FR-17) from 2.0km. to 3.00km. by providing repairing potholes, 20mm premix and seal coat (type-B) etc. of Asansol Highway Sub-Division
Emergent repairing of Kunur Bridge Bituminous surface at 9.40 km of Panagarh-Illambazar road by profile corrective course, repairing potholes, premix carpet etc. in patches under Asansol Highway Division, P.W.(Roads) Directorate
Raghunathpur-Kantaberia (via Molandighi) road from 2.50km. To 4.50km. 6.00km. to 10.80km, emergent repair and maintenance work under Asansol Highway Division in the district of Paschim Bardwan during the year 2022-2023
Repairing of Damages at Abhirampur Paraj Kolkol Road Between Ch. 0.00 km to 4.00 km caused by PHE department for laying of underground pipe line without permission under Durgapur Highway Sub Division
Abhirampur-Paraj-Kolkol road, 1.00kmp. to 3.00kmp. and 5.00kmp. to 6.50kmp., patch repair work under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Burdwan during the year 2025-26
Repair and maintenance of Bolpur Highway Sub-Division office Building under Birbhum Highway Division-II, P.W.(Roads) Dte. In the district of Birbhum.
Repair and Maintenance of Road from Verili to Jougram Highway via Nabagram, Moyna within Jamalpur Block
Construction of Concrete Road from Nalmuri Basanti Highway to Nalmuri Kabarstan at Pranganj GP. (ID-89459777)
Construction of protection wall for vehicle beside Basanti Highway Mouza Radhaballavpur GP-Basantiunder Basanti Dev Block
Emergent rain damage repair Pandabeswar Shamla road from 0.00 kmp to 1.50 kmp and from 2.5 kmp to to 4.00 kmp Under Asansol Highway Sub-Division of Asansol Highway Division in the district of Paschim Bardhaman during the year 2021-22
Refer to BOQ
Raniganj Jamuria Road (FR-5) from 0.00 kmp to 6.50 kmp. patch repair under Asansol Highway Division, P.W.(Roads)Directt. in the District of Paschim Bardhaman during the year 2020-2021.(SL-3)
Protection of embankment by close eucalyptus bullah pilling at 516th km. (R/S and L/S) of Left out portion of NH-2 to Panagarh bypass road under Sadarghat Highway Sub-Division-II
Galsi-Guhagram Road from 13.00kmp. To 14.50km., for temporary restoration work of the existing road by repairing potholes under Asansol Highway Division in the district of Paschim Bardhaman during the year 2020-21.
Kaliphari Tirat Road (FR-17) from 0.00 kmp to 3.00 kmp patch repair under Asansol Highway Division, P.W.(Roads)Directt. in the District of Paschim Bardhaman during the year 2020-2021. (SL-1)
Conducting various test for health assessment of Kunur Bridge at 10th km of Panagarh Illambazar road (SH-14) under Asansol Highway Division in the District of Paschim Bardhaman during the year 2025-26.
Restoration of road side damaged main drain and allied works from Dakshindari-Laketown Airport flank service road of KNI Avenue under Baguihati Highway Sub-division under Barasat Highway Division No.-I in the district of North 24 Parganas
Restoration of Road side Damaged Manhole Pit with allied side works near Teghoria Kolkata flank service road of K.N.I. Avenue under Baguihati Highway Sub-division under Barasat Highway Division No.- I in the District of North 24 Parganas.
Dewatering of water logging from different chainage of K.N.I. Avenue (ch. 5.95 kmp., 6.50 kmp. and 7.00 kmp.) during monsoon under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the Dist. of North 24 Parganas.
Mandirtala to Kajipara Road from 0.30 km to 0.80 km, footpath repairing work in stretches and other allied work of Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah during the year 2025-26
Munshirhat-Penro-Kjila-Rajapur Road-Emergent Repairing Work from Ch-4.00 kmp to 8.00 kmp of of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year of 2025-26.(Sl.- 01)
Cleaning of road side land with necessary Temporary fencing with Bamboo and allied works near Laketown Airport Flank on K.N.I. AVENUE under Baguihati Highway Sub-Divn. of Barasat Highway Division No.I in the Dist. of North 24 Parganas.
Dismantling, Shifting and fixing of Net Fencing, W-Profile Crash Barrier, M.S.Pit Cover etc at different location of K.N.I. Avenue under Baguihati Highway Sub-Divn. of Barasat Highway Division No-I in the Dist. of North 24 Parganas.
Repairing potholes with shelmac PR on different spot of KNI Avenue and VIP Flyover both flank as and when required under Baguihati Highway Sub Division of Barasat Highway Division No I in the district of North 24 parganas
Restoration of damages due to road cutting by CESC of Jessore Road (Paver Block Surface) near Airport 2.5 no. gate (Ch. 14.49 Kmp.) at Barasat bound Road under Baguihati Highway Sub-Division of Barasat Highway Division No.-I
Name of the desired road is not showing in the Drop-down box in the RCMS Application Division - Howrah Highway Division Sub division- Amta Highway Subdivision Name of the road - Amta Bridge Approach. Please help in this regard
Gardening,maintenance of Fountain and all electrical instruments and cleaning,sweeping and guarding 24 hours without arms at Teghoria Park on Kolkata Flank of KNI Avenue (at 6.00 kmp) under Baguihati Highway Sub Division of Barasat Highway Division
Maintenance and repairing of Rain water pipe line from Kestopur to Joramandir along (Airport bound flank) of VIP elevated corridor under Baguihati Highway Sub- Division of Barasat Highway Division No.-I in the District of North 24 Parganas.
Pre monsoon cleaning of road side drain culvert etc. from 0.00 km. to 3.00 km. (Airport flank) of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No. I in the District of North 24 Parganas.
Patch repairing of Patipukur-Rajarhat Road for rain damaged stretches at VIP bound road from 3.95 kmp. to 5.00 kmp. Under Baguihati Highway Sub-Dn. of Barasat Highway Division No. I, in the District of North 24 Parganas.
Construction of Temporary Pandal and wooden platform for the period from 09.01.2025 to 17.01.2025 at ONGC Road Temporary Bus Stand at Kakdwip on the occasion of Gangasagar Mela - 2025 under Kakdwip Highway Sub-Division, Diamond Harbour Highway Divisi
Patch repairing of road in stretches at Munshirhat Puras Road from Ch. 2.00 kmp to 5.00 kmp in streches of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year 2025-26.
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the District of North 24 Parganas.
K.N.I. Avenue (V.I.P. Road) flyover from 3.05 kmp. to 5.15 kmp.- Painting of flyover crash barrier (6 faces including outside) under Baguihati Highway Sub-Division under Barasat Highway Division No.-I in the district of North 24 Parganas
Repairing and Maintenance Work in patches of Pandua Polba Road from 0.00 km to 3.00 km and 7.00 km to 8.00 km under Hooghly Highway Sub Division of Hooghly Highway Division No. I in the district of Hooghly.
Construction of temporary pandal and wooden platform for the period of 09.01.2023 to 17.01.2023 for office at Halder Chowk Buffer Zone on the occasion of Gangasagar Mela 2023 under Kakdwip Highway Sub-Divn of Diamond Harbour Highway Division
Repairing of road side kerb, channel, drainage pit etc. at Kaikhali, Teghoria, Raghunathpur, Kestopur and Bangoor on airport flank service road of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No.-I in the District
Patch repairing work in stretches between chainage 0.00 kmp to 1.0 kmp of Dihibhurshut to Rampur Health Centre Road under Amta Highway Sub-Division of Howrah Highway Division, in the district of Howrah during the year 2025-2026.
Urgent cleaning and repairing of drainage system in both side flank from 4.750 Kmp. to 6.050 Kmp. of Patipukur - Rajarhat Road under Baguihati Highway Sub-Division under Barasat Highway Division - I, in the District of North 24 Parganas.
Emergent Repairing and upcoming monsoon prevention work for Hume Pipe Causeway over Kumirer Khal at Chainage 13.500 KM, and sundari khal at Chainage 12.300 KM of Kharar-Hajipur Road. Under Ghatal Highway Sub-Division of Midnapore Highway Divisio
Restoration of Road side Damaged Manhole Pit with allied side works near Raghunathpur Airport flank service road of K.N.I. Avenue under Baguihati Highway Sub-division under Barasat Highway Division No. I in the District of North 24 Parganas.
Gardening, maintenance of Fountain and all electrical instruments and cleaning, sweeping an guarding 24 hours without arms at Teghoria Park on Kolkata Flank of KNI Avenue (at 6.00 kmp.) under Baguihati Highway Sub Division of Barasat Highway Division