Loading…
Loading…
9,859 results • Best match
1x4 LED base ceiling light 36 w 3000k PBLM16363, 100 w flood light cast aluminium housing
As per eNIQ.
Upgradation to non residential building at 2, Govt. Place, Kolkata, during 2022-23. SH : Miscellaneous work, Wood work, flooring & wall lining for PrAG,s Chamber, Civil repairing work in the 2nd wing (Western end) of Treasury building (Audit portion) 1st floor at 2, Govt. Place, repair of the stair case at G.I.Pres building, Mandatory durability cracking of false ceiling in Audit portion of both Treasury building & G.I. Press building, Aluminium shutter & false ceiling of LAD department at 8, K.S.Roy Road in manager bungalow 2nd floor corridor etc.
Thorough repairing and upgradation of NHS DS Type quarters Block No 01/1-16 (14 units), 04/49-64 (14 units), 06/81-96 (13 units), 18/199-206 (07 units), total 48 authorised units inside and outside at South Parasea under Parasea Gr of Mines, KNT Area
Block Repairing including upgradation of Officers quarters in Parbelia and Dubeshwari Officers colony as per HQ norms 1.Block No SDPA/PARB/OCL/D/01/01-02 (2 inside and 2 outside) 2. BlockNo SDPA/PARB/OCL/CEQ/03/05-06 (2 inside and 2 outside) 3. Bl
Repairing of 3 block of A type (10 unit) quarter at Kunustoria Colliery. (Qtr no- (05-08, 09-12, 21-24)) and 2 block (8 unit) B type (BGF-01-04, 05-08) quarters and two unit CEQ up-gradation of LM Sarkar and GC Marai at Kunustoria Colliery.
A/R & M/O GPRA Quarters at 21, Richi Road, Kolkata. During-2024-25. SH:- Day to day maintenance work at Main Building Wing-A, B, & C including Plastering, wood work, painting, sanitary, water supply and cleaning of overhead tank, roof tank, sewer line, manhole, gully pit etc.
MOEI & fans including RMO motor pump sets i/c compound light for 42 Nos. quarters, international hostel, guest house, institute building of AIIH & PH, second campus at Salt Lake, Kolkata during 2024-25 (SH: Replacement of damaged / burnt out power wiring for geyser and AC at international guest house).
A/R & M/O GPRA at Tollygunge, Kolkata. During-2024-25. SH:- Repairing internal painting for Type-II & Type-III Quarters at the time of change of tenancy and Tank cleaning, jungle cutting, removing of all garbage from GPRA Colony and miscellaneous Civil works for 04(four) months.
MOEI & fans including RMO motor pump set i/c compound light for 42 Nos. quarters, international hostel, guest house, institute building of AIIH & PH, second campus at Salt Lake, Kolkata during 2025-26 (SH: Replacement of street light fitting by new LED i/c connection etc. as required).
Special repair of EI & fans, compound lights, street lights and gate lights etc. of Central Excise Quarters at GE Block, Salt Lake, Kolkata during the year 2025-26 (SH: SITC of street light poles with fittings, flood lights and replacement of damaged cable between the street light poles).
A/R & M/O multistoried General Pool Type-V quarters (G-9 storied) 72 Nos. in two blocks at 14, Iron side road, Kolkata during -2023-2024 SH: Providing Aluminium windows at common area, stair case passage & renovation of common toilet at ground floor and miscellaneous civil work.
A/R and M/O CPWD Quarters (Residential) at siliguri during year 2022-23. S.H.: Annual maintenance work for Repair of plaster, doors, windows, painting, removing / cleaning chokage of GI pipe, water closet, inspection pit, renewing of damaged water line, cleaning Jungle and roof of type-II Qtrs. etc.
MOEI & fans including RMO motor pump sets i/c compound light for 42 Nos. quarters, international hostel, guest house, institute building of AIIH & PH, second campus at Salt Lake, Kolkata during 2024-25 (SH: Repairing / replacement of old worn out / damaged conventional light fittings and garden light fittings).
MOEI & fans including RMO Motor Pumps Sets i/c compound light for 42 Nos. Quarters International Hostel, Guest House, Institute Building of AIIH & PH, second campus at Salt Lake, Kolkata during 2022-23. (SH: Providing services for day to day operation and maintenance of IEI, pump, DG & lift)
MOEI & fans including RMO motor pump set i/c compound light for 42 Nos. quarters, international hostel, guest house, institute building of AIIH & PH, second campus at Salt Lake, Kolkata during 2025-26 (SH: Replacement of old tube light fitting by new LED i/c connection etc. as required).
Repair replacement of fly proof wire, External Painting and replacement of bathroom fixtures of Type -VI Quarter I,II and Repair maintenance, External Painting in entire building, Internal Painting in Quarter No (02 and 04) and replacement of fault
Annual Maintenance and Repair Works of Different Housing Estate under Kolkata South _ I Division_ Housing Directorate during the year 2023_24_For Roads _ Building and Sanitary _ Plumbing Works AT LIG Entally _ LIG kareya Road FOR 72 Nos AND 10 Nos Fl
Renovation and Repairing work of front veranda of A1 and A2 block at RHE Tamluk under Medinipur Division, Housing Directorate Renewing front veranda along with other items of work during the year 2024-25 under Medinipur Division, Housing Directorate.
Renovation and Repairing work to RHE Tangra Road Govt Housing Estate for internal renovation of Flat A7 A6 and A5 with necessary cement work rendering wall surface with putty painting and allied works at 48 Tangra Road Government Housing
Urgent Maintenance Work (R and B and S and P) at Outside of L.I.G.H.E. (Sankharipukur) Housing under Burdwan Division,Housing Directorate for replacing of damaged pipe line cleaning water tank,Cleaning Septick tank with allied Some Buildings F.Y25-26
Replacement and Renovation work of the existing electrical wiring of fifteen nos B type quarters_ three nos C type quarters and nine nos D type quarters at RHE Dinemardanga_ under Chinsurah Electrical Section HD
NRS MEDICAL COLLEGE and HOSPITAL Roof Treatment Patch Work Using APP at the P W D. Sub Division Office BMS III Quarters Menials Quarters and Electrical Sub Station during the Financial Year 2025 26
Upgradation of existing Effluent Transportation System (ETS) connected to CETPs 1 to 4 including 03 (Three) months Trial run at Calcutta Leather Complex, Bantala, South 24 Parganas, West Bengal . For EPS-7. (2nd call)
Upgradation of existing Effluent Transportation System (ETS) connected to CETPs 1 to 4 including 03 (Three) months Trial run at Calcutta Leather Complex, Bantala, South 24 Parganas, West Bengal . For EPS-8. (2nd call)
Upgradation of existing Effluent Transportation System (ETS) connected to CETPs 1 to 4 including 03 (Three) months Trial run at Calcutta Leather Complex, Bantala, South 24 Parganas, West Bengal . For EPS-5. (2nd call)
Conducting Risk Assessment with Mitigation Measures in respect of the Existing Clusters for Santoshpur and Bodai Cluster under Textile Dyeing category (2nd call)
Land filling work up to a depth 200 mm below from the adjacent road level for new tanneries at Calcutta Leather Complex (CLC) Bantala, 24 PGS (South), (2nd call)
Upgradation of existing Effluent Transportation System (ETS) connected to CETPs 1 to 4 including 03 (Three) months Trial run at Calcutta Leather Complex, Bantala, South 24 Parganas, West Bengal . For EPS-1. (2nd call)
Conducting Risk Assessment with Mitigation Measures in respect of the Existing Cluster for Bantala Leather Complex Cluster under the Category Tannery. (2nd call)
Design, Drawing, Construction and Commissioning of Complete Sewerage Network System in Turnkey Basis Under Infrastructural Development works at Footwear Park in Calcutta Leather Complex, Bantala, at 24Pgs(S) (Part-III) (2nd call)
Deployment of semiskilled labour as pump operator for operation of pump at Bow Barrack
Design, Drawing, Construction and Commissioning of Basic Common Infrastructural works for Proposed Leather Goods and Allied Industrial Park (LG AIP) on Turn Key Basis in Calcutta Leather Complex at Bantala, 24 Parganas (S) (Part IV) 2ndcall
Design, Drawing, Construction and Commissioning of Common sewage Treatment Plant (CSTP) of capacity 0.80MLD including 03(three) months Trial Run and 01(one) year Oand M of all Civil and Electromechanical Works onTurn Key Basis in Foundry Park of FCDA
Deployment of private security Guard/Supervisor for safe guarding of (G plus 5) storied Logistic Hub for one year (365 days) round the clock in three (03) shifts at Gardenreach. (2nd call)
Construction of Cable Trench of WBSEDCL Line for Newly Constructed Electrical Sub-station Building for CFC, ILPA at Calcutta Leather Complex(CLC), Bantala, 24 Parganas (South) (2nd call)
Preparation of Detailed Project Report for the expansion of the existing 0.8MLD CSTP at FCDA Foundry Park, Howrah. (2nd call)
Construction of Secured Land Fill (SLF) at Calcutta Leather Complex, Bantala,South 24 Parganas.(3rd call).
Balance 30 percent of land filling works upto a depth of 200mm below from the adjacent road level for new tanneries at Calcutta Leather Complex (CLC), Bantala, 24 pgs (south) (Part-II) (2nd Call)
Construction of Infrastructure works and Structural andfinishing works upto 2nd floor level for Part III building of Proposed (G plus 5) Storied Logistic Hub at Garden Reach, Kolkata.(2nd call).
Construction of RCC Covered drain and laying 315 mm dia. HDPE pipe (force main) infront of existing CETP boundary wall at Calcutta Leather Complex ( CLC), Bantala, 24 Parganas (South). (2nd call)
Development of proposed CFC Building for Leather Shaving Scrap Burners at Calcutta Leather Complex, Bantala, South 24 Parganas. (2nd Call)
Design, Drawing and Construction of Common Facilities Centre (CFC) building with ancillary works on Turn Key Basis for Footwear Park at Calcutta Leather Complex (CLC), Bantala, 24 Parganas (South) (2nd call)
Environmental Impact Assessment (EIA) study for Calcutta Leather Complex (CLC) for enhancement of permitted raw hide processing capacity from 1000 MT/Day to 1600 MT/Day as a whole in Calcutta Leather Complex (CLC), Bantala, 24Pgs(s) (2nd call).
Storm Water Drainage Network for New Tanneries in added area of Calcutta Leather Complex, South 24 Parganas. (Part-II). (4th rd call.)
Rejuvenation Work for STP-III including existing drainage channel (Interception and Diversion) for Pollution abatement Jorapani and Fuleshwari River and Operation and Maintenance of the same for a period of 05 (Five) years at Siliguri under SJDA
Upgradation of existing Effluent Transportation System (ETS) connected to CETPs 1 to 4 including 03 (Three) months Trial run at Calcutta Leather Complex, Bantala, South 24 Parganas, West Bengal . For EPS-4. (2nd call)
Construction of new domestic sewer line of 325M. in length for separating domestic waste from existing combined sewer line at Calcutta Leather complex (CLC), Bantala, 24 Parganas. (South). (3rd call)
Structural strengthening and repairing of exterior surface of Block No.- 3 and 4 and other allied works at Lake Gardens Super Market under Scheme No - 114A.
Construction of Temporary Approach road for Short Term SLF site at Calcutta Leather Complex (CLC), Bantala, 24 PGS (S) (2nd call