Loading…
Loading…
9,775 results • Best match
Construction of temporary structure with concrete pathway and other allied Civil works for rehabilitation of MMD Tenant at vacant land at North West side of Pre. No. 19A/2 at Ultadanga Main Road in KIT Housing Scheme under Housing Sector, KMDA
Sinking of one no. 150 mm x 150 mm x 250 mm dia substitute deep tubewell with fibre glass strainer by R.C. Method including connection with existing F.W. Main at KIT Housing Scheme No. XII-M under Housing Sector, KMDA
Sinking of one no. 150 mm x 150 mm x 250 mm dia substitute deep tubewell with fibre glass strainer by R.C. Method including connection with existing F.W. Main at KIT Housing Scheme No. BRS-I under Housing Sector, KMDA
Emergency repairing and strengthening of intermediate floor slab, beam, column by angle bracket at different Blocks with roof treatment at Block-9 with allied Civil works in KIT Housing Scheme No. SIH-IV and IV (S) under Housing Sector, KMDA
Internal repairing and painting of quarters at different floor level in A1 block of Bidhan Sishu Police Housing Estate during the year 2024-25
Internal electrification, staircase lighting for 10 nos. of flats (2nd floor) at 301, 302, B.B. Chatterjee Street, Kasba under Housing Sector, KMDA
Construction dwelling unit under the scheme Destitute Minority Women Rehabilitation Programme at Routhkhanda GP 1. Masura Bibi F/W Nabi 2. Rijiya Bibi Midya F/W Mahed 3. Khuseda Bibi Sekh F/W Alimohamad.
Day to Day Operation of different types of Pump motor sets including minor repair pump motor set etc. for 3 (three) roomed flats at Shyamali Housing Complex, Salt Lake
Day to Day Operation of different types of Pump motor sets including minor repair pump motor set etc. for 2 (two) roomed flats at Shyamali Housing Complex, Salt Lake
CONSTRUCTION OF 2ND FLOOR RESIDENTIAL BUILDING OF UDAYNARAYANPUR COLD STORAGE LTD
PROVISION OF NON CORROSIVE UPVC SLIDING WINDOWS WITH MOSQUITO PROOF NETS IN LIEU OF EXISTING ALUMINIUM CHANNEL WINDOWS IN ALL RESIDENTIAL QUARTERS AT VIKRAM ENCLAVE AND AZAD HIND NAGAR AND CONSTRUCTION OF ROAD WITH FOOT PATH INSIDE 25 ACRE LAND AT HA
Providing and supplying of semi-skilled person as operator for day to day back washing of Iron Elimination plant of (i) Residential Quarters of CPWD staffs at Hakimpara, Siliguri and (ii) C.R. Building (GST Bhawan), Hakimpara, Siliguri during the year 2024-25.
Upgradation of residential quarters at IC Block, Salt Lake, Kolkata during 2025-26. SH- Providing one No. Non-Ac inspection vehicle with commercial registration for the official use of the Assistant Engineer-III, O/o Executive Engineer, Kolkata-III Division, CPWD, Kolkata.
Providing and supplying of semi-skilled person as operator for day to day back washing of Iron Elimination plant of (i) Residential Quarters of CPWD staffs at Hakimpara, Siliguri and (ii) C.R. Building (GST Bhawan), Hakimpara, Siliguri during the year 2025-26.
Conversion of border security fencing from phase-II/III to new design fence along IBB in West Bengal between BP No. 243/MP to 764/2-S (Length: 210.028 Km). SH: Essential repair work to residential quarters (Type II-02 nos.) CPWD, Balurghat.
Renovation of internal bituminous road, Laying of Pre-Cast Cement Concrete Tiles with replacement of Soil pipes, waste pipes & ancillary works at Residential Quarters & Training Hostel and Construction of an accessible Unisex Toilet at P B Sarkar Building at ICAR-NINFET, Kolkata.
Providing and supplying of semi-skilled person as operator for day to day back washing of Iron Elimination plant of (i) Residential quarters of CPWD staffs at Hakimpara, Siliguri and (ii) C.R. Building (GST Bhawan), Hakimpara, Siliguri during the year 2023-24.
A/R & M/O to the Residential Quarters of Income Tax (Type-III 80 nos & Type-IV 22 nos) at Ayakar Niwas, Ultadanga, Kolkata during 2024-25.SH:- Balance works of day to day as well as preventive maintenance works as per complaints.
Emergent relaying of damaged portion of existing sewer line for Block Nos.-2,3,4,5, 6 and 8 in KMDA Housing Scheme No. BRS-II, Dum Dum Road, Kolkata (2nd Call)
Replacement and reconnecting of rising, distribution and water supply line along with R.W., waste water line at B-02, 05 and 07 at erstwhile KIT Housing Scheme No. BRS-II, 16, Dum Dum Road under Housing Sector, KMDA
Supplying and engagement of mathor mistry and mathor mazdoor (male) for cleaning of underground sewer line etc. on daily basis in KIT Housing Scheme No. BRS-III, Hudco more, Ultadanga under Housing Sector, KMDA (for 12 months)
Emergent repairing and construction of varandha railing at Block-1,3,4,5, weather board and concreting work at Block-1 and plinth protection work at Block-3 along with other allied civil work at KIT Housing Scheme No. BRS-I, B.T. Road under Housing
Internal repairing and strengthening of ceiling, lintel, beam etc. of Bl-8, F-10, Bl-7, F-24, Bl-5, F-6 and common passage of Bl-7 with allied Civil works in KIT Housing Scheme No. BRS-LXXXI under Housing Sector, KMDA
BEAUTIFICATION OF BORO MATH MIDDLE FIELD OF HOUSING UNDER BALLY GP
A/R & M/O residential building at GOI Press colony, General pool area santragachi, Howrah during 2023-24. SH: Roof treatment of CPWD enquiry office cum residential building.
New Constn.of 66 Nos. S.S.Dwelling Unit Bldg. S and P,Elect.and Infra.work at Mujnai T.G. (J.L.No.39,Plot No.321) for Phase-I Chaa Sundari Housing Scheme for T.G.Workers by H.Deptt., Govt. of W.B. in the Dist. of Alipurduar, during 20-21.
New Constn.of 44 Nos. S.S.Dwelling Unit Bldg. S and P,Elect.and Infra.work at Manabari T.G.(J.L.No.21,Plot No.302,305,306,524) for Phase-I Chaa Sundari Housing Scheme for T.G.Workers by H.Deptt., Govt. of W.B. in the Dist. of Jalpaiguri, during 20-21
Maintenance of garden, lawn, hedges etc. within LA Block Housing Complex and at CMDs official residence for 2 years
Supplying and engagement of mathor mistry and mathor mazdoor (male) for cleaning of underground sewer line etc. on daily basis in KIT Housing Scheme No. BRS-IV, HS-IV, Fish Market under Housing Sector, KMDA (for 12 months)
Thorough internal repair, maintenance and painting of flats at Building no. B9 at LA Block Housing Complex, Salt Lake
Roof Treatment of Hostel Buildings and Staff Quarters in Sainik School Purulia
Replacement of water tank including replacement of some water distribution, R.W., waste water pipe line and fixing of FRP Door in KIT Housing Scheme No. Civic Center at Ultadanga, Kolkata
Dismantling and Recasting of endangered top roof and replacement of O.H. tanks by PVC tanks and allied works of Blocks 12, 16 and 7 in Housing Scheme No. BRS-III
Emergency time to time cleaning of chowked under ground sewer line and other allied works in KIT Housing Scheme No. BRS-XI, BRS-LXXXI, LIGH-I, XV M(S) and BRS IV and HS-IV and Fish Market under Housing Sector, KMDA
Emergency maintenance contract upto 31.12.2024 in the Financial year 2024-25 for the Housing Schemes and Markets of 114A, 114B, Jadavpur Super Market, 28, 247 DPS Road in Sch. No. 107, Housing Scheme No. SIH-I , XXXV-R including W.W. Hostel at Chriri
Emergent structural strengthening of intermediate slab, beams, floor at Block 02, flat no. 13, Bl-04, Fl-46, 47, 48, Bl-05, fl-24, Bl-7, fl-3,17 with other allied work at KIT Housing Scheme No. BRS-LXXXI under Housing Sector, KMDA
Half yearly emergency maintenance contract for six months in the financial year 2023-24 for the Housing Schemes and markets of 114A, 114B, Jadavpur Super Market, 28, 247 DPS Road in Scheme 107, Housing Scheme No. SIH-I, XXXV-R including W.W. Hoste
Annual Maintenance and Repair Works of Different Housing Estate under Kolkata South _ I Division_ Housing Directorate during the year 2023_24_For Roads _ Building and Sanitary _ Plumbing Works at RHE Sahapur FOR 88 NO FLATS
Construction of Cement Concrete Pathway Connecting All Residential Quarters at NBWAP
General repairs, maintenance, painting, colour washing of service buildings, staff quarters, Gate lodges, horticulture, repairs and maintenance of bridges and FOBs under Senior Section Engineer/Works / Beldanga and other new minor works etc. in the jurisdiction of Assistant Engineer/ Berhampore Court.[Zone No. 27, Period ending 30.06.2027]
Execution of (i) Construction of 10 unit new Type-III staff Quarters at different Colonies in Kharagpur & (ii) Construction of 30 bedded new hostel building with modern amenities for the purpose of 3-Phase in motion training at Kharagpur Settlement under the jurisdiction of ADEN/Settlement/KGP.
A/R and M/O to Central Excise and Income Tax staff quarters at Himachal Vihar, Matigara, Siliguri during the year 2025-26. SH: Operation and maintenance of iron removal filtration plants and cleaning of U.G. sump and PVC tank from January 2026 to December 2026.
Construction of A Type (Two Section) School Building, 09 Staff Quarters, Boundary Wall Ramp for Handicapped up to 1st Floor and Floor and other Facilites as per KVC Norms for Kendriya Vidyalaya at NFR, New Jalpaiguri, West Bengal . SH: Providing and Supplying of Structural Design and Drawings.
AR and MO to CPWD Office, CPWD quarter, Central Excise & Income Tax staff quarters at Himachal Vihar, Matigara, Siliguri during the year 2024-25. (SH: Operation and maintenance of Iron Removal Filtration Plants and cleaning of U.G. Sump & PVC tank. (from Nov 2024 to Oct 2025).
Open e-tender for the civil work of Improvement and upgradation of staff quarters at Kachari Colony, NE Colony and Rail Kunj Bhagalpur in the section of Senior Section Engineer/ Works/ Bhagalpur under Assistant Divisional Engineer/ Bhagalpur in the jurisdiction of Senior Divisional Engineer-II/Malda.
Zonal works for General repairs and maintenance of service buildings, staff quarters, Gate lodges and others new minor works etc. from Barasat Railway colony (including) to Hasnabad under Section Engineer/ Works/Barasat in the jurisdiction of Assistant Engineer/Barasat. [Zone No.12 for the period ending 30.06.2027]
Top Housing and Bottom Housing for constant contact polyurethane
Comprehensive Annual Maintenance of 6 nos. KONE 8- Passenger Elevators installed at Rohini Housing Complex, Ultadanga, Kolkata.
Strengthening of public Health Measures in KMDA Housing Schemes under Division-I and Division-VI of KIT Wing under Housing Sector, KMDA for 4 (four) months in the year 2026
Strengthening of public health measures in KMDA Housing Schemes under Division-I and Division-VI of KIT Wing under Housing Sector, KMDA for the year 2025