Loading…
Loading…
3,494 results • Best match
Estimate for Repair of Wall and Wing Wall at KM 35.410 of JLN Main Canal.
Repair of 20 Cs VT Pump as Pump House 07 Additional Loharu Canal Jhumpa Disty
White washing, painting, distempering Junior Quarter No. 1-9 (Block-B) in Canal Colony Tohana
Digital demarcation of land boundary of Augmentation of Canal from RD 0 to 20 Km
Renovation of Qtr. No. 16/3 1st floor in Augmentation Canal Colony, Meerut Road, Karnal
Completion of Center verge from Patiala Chowk to Canal,M.C.Jind (Only For L/C Societies)
CONSTRUCTION OF ROAD FROM PEGA TO CANAL REST HOUSE PEGA MAIN ROAD IN JIND DISTT.
Repair, plaster and painting of boundary wall of Canal Colony, Sector-16A, Faridabad (Re-invited).
Const of Independent Canal Based Water Works for Village Dhani Puria and gujjran Distt Hisar
Repair of damaged Canal lining near village Tajewala Bridge at WYC HE Project HPGCL Bhudkalan
Roof repair of quarter T-1 to T-8 in Canal Colony, Sector-16A, Faridabad.
Internal clearance of seepage drain along Loharu Canal RD13500 to 9000 LandR and 3500-9000L
Repair and maintenance of store room Toilet of Qtr No 8 in Canal Colony Rohtak
Sump clearance for Pump House MC-II at K.M. 15.650 of M/Garh Canal (Retender)
Rehabilitation of Loharu Disty. From RD 0-107000 Tail offtaking from RD 115500 Loharu Canal
Water Supply line from Gurgaon canal to Main water tank of the J.C. Bose University.
Various repair work in quarter S6 and S 8 in canal colony sector 16A Faridabad
Reparing white washing and painting work of Pump House No. 1 (RD-0) Loharu Canal.
Providing Independent Canal Based Water Works and Prov FHT connection at Village LALI Tehsil Ratia
Estimate for constructing V.R Bridge at Km. 39.750 of main JLN Canal(out of norms)
Raw Water Arrangement at Canal Based Water Works in Medical College Village Koriawas Distt. Mahendergarh
Construction of road with interlocking tile in sainipura village from canal to dumping station Hansi.
Dismantling of cross drainage syphon and removal of debris from SYL Canal at K.M. 15.808.
Dismantling of cross drainage syphon and removal of debris from SYL Canal at K.M. 15.808.
PROVIDING AND LAYING OF DI PIPE FOR WATER DISTRIBUTION IN MUGAL CANAL PHASE-II (Recall)
Special repair of Subordinate rest house and demolition of field hostel in Canal Colony, Mahendergarh
Laying Pipeline for connecting pond Balawas to Canal From Km. 10.405 (Tail) of Bawal Disty.
Repair of Railway road from Railway station to Mugal Canal in ward no. 12, Karnal.
PROVIDING AND LAYING OF DI PIPE FOR WATER DISTRIBUTION IN MUGAL CANAL PHASE-II (Recall)
Laying pipeline for connecting village pond Bariawas to canal Raliawas Disty. at km. 1.250 R
laying of chequered tile in Kothi no. 6 at Aug Canal Colony Meerut Road Karnal
Clearance of jungle, weeds, jalla, grass etc. from RD. 149000 to 168000 of Gurgaon Canal.
Repair and renovation of S type quarter (S-10 Single Storey) in Canal Colony Ambala
Repair work of footpath near Shop no. 124, Mugal Canal, Ward No.12, M.C. Karnal.
Distempering, white washing and special repair of quarter No.3 in Canal Colony Charkhi Dadri
Clearance of Water way from syphons and inlet of SYL Canal K.M. 13.000 to 21.000
Re-construction of trash rack slab at Pump House No-1 and 2 Nigana Canal
Repair and fixing of 30 Cs VT Pump at Pump House NO.4 Loharu Canal
Internal Clearance of sump of Main and Additional Pump house No. 2 of Loharu Canal.
Supply, erection and commissioning of 20 Cs. Pump at Pump House No.7 Loharu Canal
Estimate for special repair and other allied work in House No.2, Canal Colony, Rewari.
Distempering, white washing snowcem and special repair of Quarter No.8 Canal Colony Charkhi Dadri
Estimate for Construction of Parapet and wing wall at Km. 42.320 of Main JLN Canal.
Construction of gate, guardroom and rising of boundary wall of office campus canal colony, Jagadhri.
Distempering, whitewashing, snowcem and special repair in quarter No.9 new canal colony Charkhi Dadri
Repair and maintenance of store room toilet of quarter No 9 in Canal colony Rohtak
Repairing White washing Snowcem Distempering and Painting in Superintending Engineer residence in Canal Colony Jind
Repair of quarter No. J-6 and J-8 in Canal Colony, Sector-16A, Faridabad.
Manhole clearance with sewer lines with repairing of Manhole in Canal Colony, Sector-16A, Faridabad.
Providing canal based water supply in Hans Enclave by Crossing NH-8 through Trenchless technology and making connection from Rising main fully recharged i/d pipe line 1200mm x 300mm at Rajiv Chowk near Beri Bagh, Ward No-27 under Municipal Corporatio