Loading…
Loading…
6,609 results • Best match
Re construction of Kastigarh Canal from RD 15000 17500 m and left out spots from RD 3000 8000 m of e NIT 09 08 2023 24 Dt 28 02 2023.
Construction of Field Channel/ Drain at work Novout Dara in village Dooniwari for a length of 295 mts. From RD 00-295 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 918200 --
Construction of Field Channel at work Site Wanbal Yen in village Dangarpora for a length of 240 mts. From RD 100-340 -- Project Sumbal Canal Distributaries -- Estimated Cost Rs. 948100 --
Construction of Field Channel at work site Ranchi Yen in village Zalpora for a length of 300 mts. From RD 100-400 -- Project Sumbal Canal Distributaries -- Estimated Cost Rs. 1454500 --
Construction of Field Channel at work site Gama Yen in village Dalipora for a length of 200 mts. From RD 78-278 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 839600 --
Construction of park including chain link 4 X 4 fencing seasonal plantation along the Main Ravi Canal both sides as per land availability from RD 85365 to 85515 at Vijaypur
Please refer to BOQ
please read BOQ
boq
Please refer in BOQ
Providing, installation, testing and commissioning of silent type, modular design, vibration free, light weight Eco-friendly Diesel Generator Set of 3 Phase 15.0 kVA capacity at Head gate at Pargwal canal.
Fabrication/ Installation along with allied works of various components of mechanical regulatory gates installed at RD 2700, RD 8600, RD 11400, RD12150 and RD 12575 of main Canal of L.I.S Rajal.
Construction of Field Channel at work site Badji Daji Yen in village Rambarigadh for a length of 170 mts. From RD 00-170 -- Project Sumbal Canal Distributaries -- Estimated Cost Rs. 584000 --
Please refers to BOQ
Please refer as per BOQ
Please refers to BOQ
please refer BOQ
repair maintenance of 2 and 5 5 Ton cap. gates installed on Main Tawi and Ravi Canal including replacement repairs of its various components fixtures etc. for their continuous and smooth operations
Repair and maintenance of 02 ton capacity gates installed on Tawi Canal main/minors/head regulatory including replacement/ repairs of its various parts /components/fixtures etc for their continuous and smooth operations
Construction of Field Channel at work site Bagh Yen in village Rakh-e-Shilwath for a length of 250 mts. From RD 00-250 -- Project Sumbal Canal Distributaries -- Estimated Cost Rs. 838200 --
Please refer to BOQ
Construction/Extension of Field Channel at work site Kharbone Yen in village Batpora-Wakura for a length of 225 meters from RD500-725.
Construction/Extension of Field Channel at work site Check Yen in village Check- Watalbagh for a length of 350 meters from RD00-350.
Construction/Extension of Field Channel at work site But Khah Yen in village Khranihama for a length of 250 meters from RD00-250.
Repair, Replacement of damaged components along with allied works of Escape and Cross Gates at RD 2700, RD 6500 , RD 8600 and Cross at RD 11400 installed at main Canal of L.I.S Rajal.
Repair and maintenance of 02 Ton capacity main/minors/head regulatory/cross and escape gates including replacement /minor repairs of its various parts/components/fixtures etc. installed on Tawi Canal of RTIC Jammu
Construction of Field Channel at work site Mir Yen in village Shadipora for a length of 600 mts. From RD 00-50 and 00-550 -- Project Sumbal Canal Distributaries -- Estimated Cost Rs. 1942800 --
Repairing, Renovation, Maintenance and Extension of Field Channel at work site Sandoor Yen in village Wakoora for a length of 500 mts. From RD 200-700 -- Project Dab Canal -- Estimated Cost Rs. 1652900 --
Construction of four numbers G plus 6 Hostels for IIM Jammu at Jagti, Jammu. Construction of Hostel block including internal water supply, sanitary installation and internal and external electrical works, retaining walls and slope stabilization, ... and irrigation lines, ... and irrigation lines, ...
Construction of Field Channel/ Drain at work site Bagh Zilla Yen in village Wakura Ganderbal for a length of 150 meters from RD00-150.
As BOQ
Please refer to BOQ
Please refer to BOQ
As boq
i. Improvement of D-9 between RD 16340 - 25900m Mtr by way of pitching, grouting (RD 20420 to 21200 Mtr of D-9) under State Sector Capex Budget.
Providing and Laying of T-wire Crates on Jandial Ground to GHS Agore Link Road (Under Capex Budget) Crates on Canal to Jamat Ali House Road Ward No. 04 Lower Ranjan (Under Capex Budget).
Construction of Field Channel/ Drain at Harim Dalvout Koul Main in village Hardpora for a length of 245 mts. From RD 00-75 and 150-320 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 2016500 --
Repairing, Renovation, Maintenance and Extension of Field Channel at work site Nadwav Dara in village Batapora for a length of 270 mts. From RD 00-270 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 1147000 --
Repairing, Renovation, Maintenance and Extension of Field Channel at work site Dar Daji Dara in village Doulatpora for length of 200 mts. From RD 05-205 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 862000 --
Repairing, Renovation, Maintenance and Extension of Field Channel at work site Shalla Dara in village Hardpora for a length of 270 mts. From RD 00-270 -- Project Marval Canal Distributaries -- Estimated Cost Rs. 882200 --
Mobile and Smartphone Data Extraction and Analysis Tool
Power Generator - DG Set (up to 900 KVA) (Q2)
Smartphone (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6829471 Dated : 27-10-2025 Bid Document 1/6 Number of Auto Extension count 2 Past Performance 10 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 1.00 ( ) Duration of ePBG required (Months). 13 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : IC Prov CID HQRS, Home Department Jammu and Kashmir, Jammu and Kashmir Police, (Mohd Ashraf Peer)
PLEASE REFER BOQ
Refer to BOQ