Loading…
Loading…
6,599 results • Best match
please refer BOQ
As per NIT
Clearance of Jungle from Main Ravi Canal RD 61104 to 64400M at places
Protection of syphon at RD 9587 M of Main Tawi Canal Balole Nallah
Rejuvenation of old field channel at D2 and DOLs of Main Tawi Canal
Silt and jungle clearance from Old Ujh Canal between RD 1800 to 4200M.
Repair/reconstruction of damaged RCC panels at various spots of Wangath link canal
Repair/ Restoration of canal Service Road along with retaining wall(-)700M CHEP-III
Silt/Mulba clearance from Canal Syphon in Janglote at RD 26204M of MRC
Clearance of Silt Jungle from Main Ujh Canal from RD 12200 to 17640M
Improvement/ construction of culvert from RD 24550M of Main Tawi Canal at spots
Macadamization of Road Sai Kalan Canal to Chak Bulla (L 1.50km) (2nd Call)
Clearance of Jungle/ Silt from RD 84140-85900 M of Main Ravi Canal
Clearance of Silt Jungle from Ujh Canal RD 3000 to 6200M at places
Clearance of Silt Jungle from Ujh Canal RD 3000 to 6200M at places
Imp/Restt of Bhella Canal at spots in between RD 0-2800 mtrs.
Upgradation and Improvement of Duddar Canal R 8000-11800 mtrs (UT Capex Budget)
Extension of Thumba Nehoti Gravity canal from RD 4850 to 5900Mtrs (Allied works).
Uppgradation and Improvement of Duddar Canal RD 2285-8000 mtrs (UT Capex Budget)
Fabrication, and installation of D1, D8 and D9 gate installed on Kathua canal.
Silt clearance from the Maggar Syphon of the Main Ravi Canal Rd 20896
Improvement of disty U 1 of Main Ujh Canal RD 750 to 850M
Desilting of Barrel and Supply channel of New Partap Canal at Head work.
Constt of Culvert on Canal near H/O Parvesh Kumar at Gurah Beldaran
Clearance of Silt and Jungle from Main Ujh Canal RD 5100 to 9675M
Construction of walkway along the canal at Digiana park in ward no 46.
Clearance of Jungle from Main Ravi Canal RD 61104 to 64400M at places
Clearance of Blocked Ujh Canal Syphon at RD 20950M near village Chan Morian
Clearance of Silt Jungle from Main Ravi Canal between RD 64400 to 67700M
Clearance of silt Jungle from Ujh Canal RD 0 to 3000M at places
Restoration of Sehswan Link Channel of Main Ravi Canal at spots Part B
Restoration of Sehswan Link Channel of Main Ravi Canal at Spots Part A
Improvement of RB Canal at RD 0/200-0/450 Kms at spots.
Repairs to 3 no gates on Main Ranbir Canal along with allied works
Silt/Jungle clearance from Main Ravi Canal RD 10540 to 11265M excluding structures.
Constt. Of Road from Canal to the H.O. Doulat Ram W.No.3 Thakra
Improvement of Main Canal between RD 837-1265M of LIS Ranjan at spots.
Constt of T/road from Canal to Baba nar Singh mandi W.No. 02
Jungle and Silt Clearance of Main Ravi Canal form RD 35840 -37300 M
Improvement of RB Canal between RD 0/0-6/750 kms at places
Repair /Renovation of Chowkidar /Mali Quarter in Rajinder Park at Canal Head, Jammu
Clearance of Silt and Jungle from Ujh Canal between RD 17800 to 23900M
Silt/Mulba clearance from Canal Syphon in Barwal at RD 30875M of MRC
Reconstruction of Damaged Head works on Escape side of Wohan Canal Right (Fresh)
Repair to damaged parapet along the canal of USHP-I at various spots
DAMAGE OF CANAL SECTION OF CHANDUCHAK MINOR OF D10A OF D10 OF MRC
Improvement of Bhella Canal between RD 0/0-0/500 kms at places.
Clearance of silt from Kathera I Canal Syphon at RD 27285M of MRC
Clearance of Silt/Jungle from Main Ujh Canal from RD 2900 to 4150M
Remodeling/Reconstruction of Field Channelsm in Plum concrete on Hamirpur- Mangtian Canal CAD