C/o irrigation well NHO Manzoor Ahmad Tali, GH Mohd AND Others at ward no 7 sohipora
Construction of irrigation drain from Sher Mohd to Lal Din Deedad at Ward 02 Drugmulla A Chayalpati.
Delopment of irrigation kul with plugging through stone and alternate pit system at Bhatshat NLO Manzoor Ahmad
Reconditioning of gate at D/O 54000 and D11A installed on New partap canal and Reconditioning of gate at D1 and D2 installed on LIS Ambran.
please reffer BOQ
please refer BOQ
Electrification of the Head Works site by way of Supply, Installation, Testing and Commissioning of two No. High Mast lighting system with installation of LED lights along the periphery of the site of Head Works at New Partap Canal
Stage Contract for annual repairs and maintenance and day to day work of various assets viz Khuls, Office, Buildings, Quarters etc. of Irrigation Sub-Division Siot of Irrigation and F.C. Division Nowshera under MH-2702 for the financial year 2026-27
Detailed estimate for repair and maintenance of 02 Ton cap. gates main minors HR including replacement repairs of its various componentsfixtures etc. for their continuous and smooth operations on Main Tawi Canal.
Silt clearance of D10 of Main Ranbir Canal from RD 02 to 1820 Mtr
Repair/renovation of Rajal Main canal at RD 1675-1700Mtr, RD1890-1910M including a pullie slab at RD 1970-1974Mtrs and desilting/mulba clearance at RD 1510 to 2830mtrs at places of Rajal Main canal.
Improvements to Dadi Canal at Critical / Vulnerable Spots for the work Checking of Leakages by way of Providing RCC Jacketing to Existing Damaged Lining walls with Bed Treatment at RD 3284 mtrs of Dadi Canal
Augumentation of Basantpur Canal by way of Shifting of its headworks to Ravi Canal at Rd 2330 from existing Ravi River which shall be defunct after commissioning of Shahpur Kandi Dam project. RD 166 - 420M
Repair/ Restoration of Damaged Panels between RD 84065 to 84565 mts of Main Ravi Canal
Face lifting Up-keeping of Jewel Canal road on the eve of Darbar Move 2022
Silt clearance of D-10 of Main Ranbir Canal from RD 3 to 1820 Mtr.
Clearance of Silt Jungle from D 10 of Man Ravi Canal RD 3000 to 9000M
Improvement/ Restoration of D-3 of Main Garkhal Canal at places and other allied works.
Silt clearance of D-10 of Main Ranbir Canal from RD 4175 to 6950 Mtr.
Improvement Restoration of D1 of Main Ranbir Canal at places between RD 0 to 8800M
Repairs annual periodic maintenance of gates installed at Dharap and other locations on Ranbir Canal.
Clearance of silt/ jungle from RD 2500-5800M of D-18 of Main Ravi Canal
Silt and Mulba clearance from Kharote Syphon at RD 24045 M of Main Ravi Canal
Restoration Modernization of D 10 of Main Ravi Canal RD 100 to 3000M at places
Improvement/ strengthening of minor M1 of D1 of old basanter canal from RD 0-600M
Annual maintenance of various trash racks installed on Tawi and Ravi Canal during closure period.
Improvement of Main Ranbir Canal by way of pitching and grouting at RD 9350-9550Mtr
Repair to various regulatory gates on distributaries falling in Domana area of Main Ranbir Canal
Clearance of Silt Jungle from D 16 of Main Ravi Canal RD 5300 to 7850M
Construction of Protection work at Canal Feeding to Filtration Plant Dhani Dhar (under Distt. Capex)
Clearance of Jungle/ Silt from RD 0-2000 mts of D2 of Old Basantar Canal
Annual periodical maintenance strengthening of Rathian Head Gates installed on Ranbir Canal and its distributaries
Jungle clearance and Silt/Mulba Clearance from RD 24500M to 27500M from Main Ravi Canal.
Face lifting upkeeping of Jewel Canal road on the eve of Annual Darbar Move 2020
Constt. Of Passenger shed near Ravi Canal and const. of Passenger Shed at w.no. 3
Clearance of Silt and Jungle from D3B of Main Ranbir Canal Length 250Mtr Dayaran, Bhalwal
Silt clearance of D-10 of Main Ranbir Canal from RD 4170 to 6950 Mtr.
Jungle clearance and silt and mulba clearance from Main Ravi Canal RD 26400m to 28880m
Silt clearance from Rattian Minor and Malikpur Minor of D-10 of Main Ranbir Canal.
Clearance of Silt/jungle of Hamirpur Minor of Ujh Canal from RD 0 to 3000M.
Clearance of silt/jungle from Main Ravi Canal between RD 13000 to 14250M excluding structures.
Restoration Up gradation and Improvement of Main Ravi Canal RD 65113 to 65400M at places
Improvement of Main Pargwal Canal between RD 1190-1300 M at places incl. allied works
Construction of muthu bund at Head site of Augmentation of Siot canal by Crate lining.
Constt of T/road M/road to M/Canal to SC ST Moh W.No.7
Improvement of disty U 3 of Main Ujh Canal RD 2200 to 2550M at spots
Silt clearance of D-10 of Main Ranbir Canal from RD 1820 to 2965 Mtr.
Constt. of lane/drain from H/o Yashpal to canal at Keranwali pyt chack Salarian
Clearance of Silt Jungle from Ujh Canal RD 0 to 3000M Down Stream Bein Nallah
Jungle and silt clearance from RD 1000 to 1800m of D2 of old basantar canal