Loading…
Loading…
10,113 results • Best match
SPECIAL REPAIRS TO FINANCE DEPTT. AND IRRIGATION DIVISION OFFICE IN ADMINISTRATIVE BUILDING AT -YAVATMAL.
Kai Sanas sports ground yethil field area madhe irrigation system saha lawn tayar karne.
Repairs to irrigation Sub-Divsion Ashta office Building at Ashta Tal- Walwa Dist- Sangli
Supplying Manpower by outsourcing for section offices of Kanher Irrigation Subdivision No.1, Satara
Repairs of roof and Renovation of office Buidings at Ambadpal Irrigation Colony, Tal-Kudal
M and R works under jurisdiction of Jayakwadi Irrigation Sub Division N.14 Wadigodri
Providing unskilled Mazdoor/Helper for Irrigation management, maintenance for Pali Section Tal.Sudhagad Dist. Raigad
Lekage Repair Of Gadhinglaj Irrigation Sub. Division, Gadhinglaj Office Building, Tal-Gadhinglaj, Dist. Kolhapur
Repair Work For Patgaon Dam Maintainance Section, Patgaon Under Vedaganga Irrigation Sub Division Gargoti.
Providing Technical and skilled, unskilled manpower Through Outsourcing for Dhom Irrigation Sub Division Koregaon
eTender for allotting Lohashigve Irrigation Tanks on lease for fishing Tal Nandgaon Dist. Nashik
Repairs to Old Pimpra Rest House Under Pimpra Irrigation Section At Nira Tal.Purandar Dist.Pune
Construction of Flood Control War Room and Record Room at Sangli Irrigation Division Office.
Providing Labour for Patrolling during Rabi and Hot Weather Irrigation under Tumsar Section for the Year 2020 21
Nardave Medium Irrigation Project, Tal Kankavali, Dist Sindhudurg. Construction of approach road from K. T. Weir No. 1 at Nardave to Jambhavade Rehabilitation Gaothan
Construction of Irrigation Bandhara and Protection Wall At - Turmal Tal Pen DIST RAIGAD
Repairs to Nallah syphon at RD 500m on Main Canal of Mandangaon
UPPLYING PUMP OPERATOR AND HELPER FOR PUMP OPERATION, PUMP REPAIR (755 HP WPIL MAKE) AT DAHIGAON LIFT IRRIGATION SCHEME STAGE 1, SUPPLYING PUMP OPERATOR AND HELPER FOR PUMP OPERATION, PUMP REPAIR (730 HP KBL MAKE) AT DAHI
Repairs to roller type Emergency gate leaf of size 2.70 2.70 m at pump house,Desilting the pump house sump,gated piers,Silt pocket Cleaning and painting of Trash rack at Karajkheda Lift Irrigation Scheme,Dist Bhandara.
Supplying erecting testing commissioning 110 Volt 150 AH VRLA Battery Set with Battery charger for control and protection of 33/11 KV 10 MVA power transformer and allied equipments in the Wakurde Lift Irrigation Scheme Stage II
Repairs to VRB in Km 4 on Minor D 20 Of ILBC, Repairs to VRB in Km 3 on Minor 31 Of ILBC , Repairs to CC Lining AT Km 31 Of ILBC and Carrying out Irrigation management work of controlling canal in Rabbi and H.W. season for UPI Section No.
Repairs to Damaged Lining and Structures Ujjani Left Bank Canal Km. 0 to 126.for
Constructing Concrete Lining to Canal under M. I. Tank at Khanapur, Tal- Ajara, Dist- Kolhapur.
Job work for operation and petty running maintenance of V.L. Gates at Satpewadi and V.T. pumps at Takari Stage I Pump House in Irrigation and Non Irrigation programme with allied Mechanical and Electrical Equipment.
Upper Wardha Irrigation Sub-Division No. 2,Tivsa Under Irrigation Section Anjansingi Under Gavha Farkade Water User Association, Gavha Farkade, Ta. Dhamangaon Railway For Repairing Work, Empower, Strengthening and Handing Over of Distribution System
Job work for operation and petty running maintenance of V.L. Gates at Satpewadi and V.T. pumps at Takari Stage I Pump House in Irrigation and Non Irrigation programme with allied Mechanical and Electrical Equipment
Upper Wardha Irrigation Sub-Division No. 2,Tivsa Under Irrigation Section Kurha Under Suryaganga Water User Association, Anjanwati, Ta. Dhamangaon Railway For Repairing Work, Empower, Strengthening and Handing Over of Distribution System (799.96 Ha.)
Construction of gabion wall to Aqueduct escape at ch 34400 of Krishna Canal Karad. Construction of WBM road SR side Krishna Canal at ch 31330 kmt to 33140 kmt. Construction of WBM road SR side Krishna Canal at ch 35400 Kmt to 36963 Kmt Dsist Sangli
Resectioning of Old main Canal from RD 0 00m to 17240 m and New Main canal from RD 0 00 M to 17340 M along with its Distributory and Minor and Repairs to structrures of Old Main Canal at RD 3460 8250 etc Of Morna Medium Project
Canal Lining in selected patches to RBC and LBC, resectioning of main canal in patches, construction of canal crossing at RD 1560 m RBC, Maintenance and repairs to RBC 0 to 7.5 km, Maintenance and repairs to LBC 0 to 17.0 km of Torna Medium Project
CONSTRUCTION OF CEMENT CONCRETE GUIDE WALL AT THE END OF TAIL CHANNEL (CH. 150 M ), CROSS DRAINAGE ON APPROACH ROAD AND CROSS DRAINAGE AT HEAD REGULATOR OF MINOR IRRIGATION TANK AT VANI (KH.), TAL.DINDORI, DIST. NASHIK
Repairs to Aquaduct R.D. 1485m. for karanji MI Tank Main canal
Construction Of Bailgada Ghat To Canal Approach Road AT JARKARWADI TALUKA AMBEGAON DIST PUNE
Work of preparing photo copies (Xerox) of various documents of Govt. office as per details given in the Tender Notice
Supplying Labours for Irrigation Management During Rabbi Season 201920 of Purna Medium Project tq chandur bazar
Constructing inlet CR Shetphal Tank Maintance repairs to dam and canal constructing gated escape to Shetphal Canal constructing RCC chamber on outlet of shetphal Dam and other miscellaneous works.
Construction of Canal Distribution system for Kochi (Ambezari) M.I.TankTq Ghatanji Dist Yavatmal (L-Earthwork and structures of main canal 0 to 9.11 km, minor no 1,2,3,4 and its subminors)
Repair to Earthwork of Canal and Providing Dry Rubble Pitching to Outer Slop of Main Canal of Kusarla M.I. Tank from RD 1440m to 1530m, Tah. Nagbhid, Dist. Chandrapur
Repairs to inlets Nimgaon Minor ch 1 obliq 800 to 2 obliq 000 minor No 3 4 7 9 18 of Karjat Branch Canal of Kukadi Left Bank Canal
Constructing lining of 250 m length at km 7 of Sule Right Bank Canal and Constructing lining of 450 m length at km 15 of Sule Right Bank Canal
Construction of Box Culvert and R.D. 1140m. On Tail Minor offtaking from Deoli Sub Branch Canal and Construction of Protection Wall and R.D. 3759m. on Deoli Sub Branch Canal.
Reconstruction of direct outlets on main canal at R.D. 600m, 1100m,1250m, 1980m and 2000m on main canal of Rotha-2 M.I. project. Tah. Wardha Dist. Wardha 2nd call
Construction Of Balance Earthwork And Structure Of Nimgaon Minor 1 , Nimgaon Minor 2 And Padegaon Minor 1 Offtaking On Deoli Branch Canal of Main Canal of Lower Wardha Project
Repairs to HPC on main canal and repairs of waste weir and approach channel and HPC RD 1040 m and RD 2080 m on main canal of Ringdev M.I.Tank.
Construction of CC Lining at RD 150 m on Main Canal and Repairs to CC Lining and Aquaduct at RD 16125 m on Main Canal of Naleshwar Medium Project
Construction C.C Lining of km 1 at HPC 0 865 on Left Bank Canal and Nalla Diversion work at km 7 of Link Canal of Shirapur L I S
Construction of Cross Regulator and Escape at RD 1610 m, 2665 m, 5700 m, 12520 m, 14300 m with Balance Works on Dighori Branch Canal of Asolamendha Main Canal
Reconstruction of Cross Regulator at RD 800m on Main Canal Repairs to Outlet at RD 2000, 2020, 4000, 4600 and 4950 on Main Canal of Betekar Bothali Medium Project.
Providing Barricades Balance Quantity in KM 0 to 72 of Chaskaman Left Bank Canal and Repairs of Foot Bridge in KM 0 to 60 of Chaskaman Left Bank Canal
Canal Resection work of Danapur Branch canal Belkhed Branch Telhara Distributory Wadi Wankhed Warud Ghodegaon Belkhed Distributory and Sub Distributory Minors and Sub Minors on it under Wan Project