Loading…
Loading…
10,113 results • Best match
34. Const road suresh baburao bhagat home to canal at-bhagatwasti sansar.Tal- Indapur
Construction of VRB at Ch 97400 m of New Mutha Right Bank Canal
Construction of R.C.C. Box Culvert to Canal Crossing at StP-2 M.C. Arvi
Repair of Left Bank Open Canal With RCC Half Round Pipe for Talewadi
86.CONSTRUCTION OF KUKDI CANAL TO METANGALE ROAD AT BORI BK TAL . JUNNAR
Constg. Agr Canal at Ghativade Torniche bhatle Tal. Dodamarg Dist. Sindhudurg 2nd Call
Maintence and Repairs to Krishna Canal between ch 13 500 to 28 500.
CONSTRUCTING INTERNAL ROAD TO CANAL TO KALOKE WASTI AT VIDANI TAL-PHALTAN DIST.SATARA
Repairing of VRB on Main Canal of Chikhali Nala Project (Unemployed Engineer Only)
IMPROVEMENT OF ROAD AT PANDHARPUR ROAD 60 PHATA CANAL TO MAMAJI WAGHMODE HOME
CONSTRUCTION OF APPROACH ROAD TOWARDS AQUEDUCT FROM RAILWAY UNDERPASS OF DEGAON BRANCH CANAL.
06.CONSTRUCTION OF WBM ROAD FROM CANAL TO PANDURANG SURYAWANSHI HOUSE AT.YELAVI TAL.TASGAON
Kharif watering 2020-21 on main canal distributory and minors of Nawegaonbandh M.I.Tank
Proposed Construction of CD Work on Canal Type Gutter Near Suhas Chougule Shed
60.Construction of Road Pimpalcha Mala to Canal Road At - Rui Tal- Indapur
Construction Of Road From Sanjay Kangude Ghar To Dahigaon canal Road At Deolali
13 Construction of Nira Baramati Road To Kanherwadi Ghumatvasti Canal To Waghalwadi Road.Tal.Baramati
Janta vasahat parisarat canal road javalil vividh thikani sarvajanik shauchalay durustichi kame karne
Construction of WBM BT Road From Jaysing More to Krushinagar Canal In palus
Construction of Selective Lining of Sonora Minor offtaking from Lower Wardha main Canal
Construction of Sakav At khadakwadi Mina Canal At Narayangaon Tal Junnar, Dist Pune
Construction of Diversion weir and Canal at Mhate khurd Tal - Jawali Dist- Satara
Special Repair of Adan Main Canal and Distribution Network Tal- Karanja Dist- Washim
Repairs to Outlet Gates of Chilawadi Branch Canal and Parewadi dy of CBC
Nardave Medium Irrigation Project, Tal. Kankavli, Dist. Sindhudurg. Plugging of K.T.Weir on Gad river for creation of water storage for Irrigation in year 2022 23 in K.T.Weir No.1,3 4,6,7,9,11,12 AN 13 also provision of labour for crop measureme
Repairs to Roof Painting and Providing Furniture to Tillari Irrigation Sub Divisional office Tillari Canal Sub Divisional no 02 and Tillari Canal Sub Divisional no 04 Office And Repairs to Toilet Block at Tillari Irrigation Colony charathe Sawant
Construction of Balance work of Babhalgaon Percolation Canal Tq. Latur, Dist Latur
M and R to Main Canal Of Suki Right Bank Canal and allied Works M and R Work Of Aqueduct On Suki Right Bank Canal and Allied Works M and R to Service Road and Allied works Of Suki Right Main Bank Canaland Repairs Works of Head Regulator and Other S
Construction of Foot Bridge in KM 14 of Right Bank Canal of Tillari Interstate Irrigation Project
Carrying out Periodical Observations in the Command area of Purna Project Lasina Branch Canal for the Year 2019-20.
Carrying out Periodical Observations in the Command area of Purna Project Tail Branch Canal for the Year 2019-20.
Providing Services of Private vehicles for the office of Hon Minister WRD Konkan n Tapi Corp, under the control of Executive Engineer, MSDD, Kalwa, Thane debit to Executive Engineer, Lift Irrigation n Construction Div, Jalgaon for Period of One Year.
REWINDING OF 615 KW 3 3 KV 3 PH SQUIRREL CAGE INDUCTION MOTOR SUPPLY OF BEARINGS OF 3.3K.V., 3PH615 KW SQUIRREL CAGE INDUCTION MOTOR CLEANING OF RADIATOR ASSEMBLY02 NOS COMPLETE WORK AS PER SPECIFICATION FOR DAHIGAON LIFT IRRIGATION SCHEME STA
Estimate framed in the office of Executive Engineer TLIPMD Ogalewadi for the probable expenditure that will be incurred for Irrigation Section Office Karad and Irrigation Section office Takari to collect water circulation charges and water charges pr
Supply of Skilled, Semiskilled an Unskilled Manpower for Irrigation Management in Kharif,Rabbi an Hot Weather Season In 2020-21 for Bor Section, Hingani Section,Kelzer Section, Dahegaon Section, Antargaon Section under irrigation Sub Division,Seloo o
Providing Manpower for doing field work and office work such as Taking water levels of irrigation projects , preparing assesment of Irrigation water charges and recoverd water cess from farmers under Vedganga Irrgation Sub Division, Gargoti for the
Providing Room services in Irrigation Rest House and House Keeping services with supply of cleaning material including Electrician, Plumber, Carpenter and Gardener service in Sinchan Seva Bhavan, Pench Irrigation Rest house and Offices at Plot No.13
Repairing of Mangrul dy Mangrul Minor Mangrul Tail Minor and its distrubution systems offtaking from v.b.c. under irrigation section No 1 Mangrul Dastagir of Irrigation Sub Divi No 3 Dhamangaon, for handing over Bhaskar Maharaj W.U.A. Chinchpur.
Under Chandgad Irrigation Sub Division Chandgad Providing Man power for Irrigation Management Work on Patane, Here Kitwad Khadakhoil Kalasgade Nittur No.2 Jelugade Lakikatte Ambewadi Kajirne Dindalkop Sundi Kitwad No.2 MI Tanks Tal. Chandgad and Ku
Repairs to Residential Quarter in Akola Irrigation Colony Gorakshan Road and Civil Line Road along with Sanitation Plumbing Electrical and other related Works Morna Colony Carpet Area 1142 sqm Irrigation Colony Carpet Area 2067sqm and Repairs to
Carrying out Servey, Preparation of Detailed Estimates using Innovative Techniques and Methods for Restoration of Canal Irrigation Capacity of Hatta Branch Canal 0 to 2660KM
Repair Of Nh-66 Intake Well And Canal Syphone Between Banda Branch Canal Of Km 37 Taluka Sawantwadi, Dist Sindhudurg of Tilari Interstate Irrigation Project
Providing labour for controlling outlet and escape gate, vigilance and Maintainance For Tilari Left and Right Bank Canal andLink canal of Tilari Interstate Irrigation Project.
Repairs of Irrigation Project Construction Sub Division No.3 Office Colony at Lanja Tal Lanja Dist.Ratnagiri. Class III A and III B Quarters
1 Repairs Maintenence to CR Gate Radial Type of size 5 5 3 5 M 4 Nos at 44km 55km of Kukadi Left Bank Canal under Deputy Engineer Kukadi Irrigation sub division no.2 Nighoj Repair to Manufacturing erecting providing of Sliding type gates s
special repairs to dharangaon dharaninala drainage scheme on lower girna canal for the year 2025-26
Repair of canal Syphon at RD 2400 mt. Repairing of Nalla siphon at RD 2700 mt, Rep. of VRB at RD 5500 and 6500 mt. of Nandora main canal of Nandora M.I.Project.
Maintenance and Repairing of HPD at Ch.1/795, 2/335, 3/750 and Ch.4/170 m of Hetawane Left Bank Canal and Canal Lining 20 M length for above HPD
Repairs and maintenance of C.R.and Escape Gate of Various sizes with allied Hoist Mechanism Total 24 Nos on Kayadhu Branch Canal (0 to 90 KM) of Isapur Right Bank Canal Dist. Nanded.
Repair to embankment and construction of HPC at RD 6600 m and Construction of Box Type canal from RD 300 m to RD 400 m on Main canal of Kusarla M.I. Tank