Loading…
Loading…
10,124 results • Best match
CONSTRUCTION OF 3 NOS. DROP HUME PIPE CULVERT AND 5 NOS. CART TRACT BRIDGE ON MURADGAON TAIL MINOR, PADEGAON MINOR NO. 1 and 2,DEOLI BRANCH CANAL, DEOLI MINOR NO.2 and 3 OF LOWER WARDHA PROJECT.
Construction Of VRB at RD 13800 m, Inlets at RD 16720, 16880, 17400, 18180, 18380, 14980 m, Escape Cum CR at RD 17345 m and Guniting Work at RD 1600 m on Branch Canal of Pentakli Project.
4701-Special Repairs to Tail Dy of MRBC and Tail Dy and Dy 3 of Pathardi Branch Canal of MRBC By Linning Repairs, Structure Repairs, SWF Repairs, Minor and Outlet Repair, Embankment Repairs and Office Buildig Repairs.
A) Providing WBM Road Form Shankar Dattu Nanavare Home To Balu Mane Home Road At Kadalas, Tal. Sangola. Dist. Solapur.(B) Providing WBM Road Form Raju Waghmode Home To Canal Road At Kadalas Tal. Sangola. Dist. Solapur.
Const. of PDN including surveying, Designing, Drawing and Const. Maint. the system for a period of five years after completion of const. out off which first three year irrigation with WUA and next two year handing over the area to WUA for Wasani M.P.
Appointing Private Vehicles and Drivers on lease basis required for 3 Sub Division Field offices Under Irrigation Project Construction Division, Ratnagiri under Ratnagiri Irrigation Circle, Ratnagiri.
A) Renovation of Malhar Bunglow in Primises of Irrigation at Trimbak Road B) Extention of Malhar Bungloqw in Premises of Irrigation at Trimbak RoadTal. Dist. Nashik
CONSTRUCTION OF LIST IRRIGATION SCHEME YERAL TAL ROHA DIST RAIGAD
Providing An Laying Underground RCC drainage Pipe line at Shree Ram nagar, Dwarka nagari, Raj Rajeshwari mangal karyalaya area, Aayodhya nagar, Saraswati nagar, Canal road, Pawar wadi,Borade mala, Pimpalpatti road to Panchak STP area
Const. of Civil and other allied work of Rising main,Delivery chamber,Gravity Main, Distribution system and 5 year Operation and Maintenance of Mula High Level R.B.Pipe Canal (Wambori Chari Stage II) Tal. Rahuri Dist. Ahmednagar of Mula Project
Providing Of Labour and diamond drilling material for NX Diamond drilling- 2 Nos bore of total depth 70 Mtr. and 6 Diamond Drilling of 2 Nos of bores of total depth 70 mtr at Medium Irrigation Project Sapan,Tal- Achalapur,Dist.- Amarvati
Fabrication and Erection work of EOT for Irrigation Outlet EG. Design, Manufacturing and Erection of 10 MT capacity EG Hoist. Material,Fabrication, Erection of CRCA Cabin at Dam top and left bank EG. Repairs and maintenance of LBIO SG and EG. At Gir
Office work and Field work in the month of January 2026 to June 2026 for Hatnur Dam Section and Operation of irrigation outlet submersible pumps in gallery and Maintenance and repair work of Radial gates and complete electrical system of Hatnur Dam
Construction of Check wall at M.I. Tank Chinchvad, Construction of Irrigation Outlets, Selective Linning, HPD n CD Work on LBC n RBC of M.I. Tank Chinchvad, Construction of Selective linning on LBC of M.I. Tank Roshani n on RBC of M.I. Tank Jategaon
Providing Unskilled labours for Tondapur Medium Project and Section Office and 5 MI projects for Safety at day and night and for Irrigation Management in Rabbi season 2023-24 and Filling Raincuts of Earthen dam of Tondapur Modium and Repairs to Appro
Manufacturing And Supply Of New K.T.Weir Curved Type Needle Gates Qty. 1050 Nos. Of Size 2.15 X 0.5 Mtr. At (Mandki - 100 Nos., Jeur - 350 Nos., Pimpri Khurd - 350 Nos. Nira - 250 Nos. etc. Various Site Under Dy. Engineer, Nira Irrigation Sub Divisio
Hot weather Irrigation and management works for year 2020 21 on Bodalkasa Medium Project Paldongari Mendha Ex Mal Tank and Clearance weeds bushes and trees on us and ds slopes of bund cross drains toe drains nalla portion repair to drains and etc
Gadnadi Medium Irrigation Project,Taluka Sangmeshwar, District Ratnagiri. Construction of Parshall Flume at RBC Ch.3350 and 17610 m, CR Cum Escape at RBC 4970,9270,15120 and 20820 m and at LBC Ch 4510 and 6970 and CT Flume at LBC Ch.550 m,
Labour for patrolling during kharif Irrigation for year 2020-21 of Umarzari Sonegaon Kalimati M.I.Project and Chirchadbandh Tedha Ex.Mal.Tank and Removing of tress and bushes of Us and Ds of dam Repair destrub pitching of dam and Ds of end weir etc.
Repair and Maintenance of Irrigation Outlet EG of size 1.8 x 2.1 M. 2 Nos. of Kolkewadi Dam at Koyna Project III rd.Stage and Painting Repair and Maintenance works of Various Gates of Pophali TRT at Koyna Project I st and IInd. Stage.
Gadnadi Medium Irrigation Project, Tal. Sangmeshwar Dist. Ratnagiri, Formation of Water User Association as per MMSIF Act 2005 and handing over to Water Users Societies Command Area of R B C km 0400 M To 38500 M with Kuchame Distributory and LBC k
Repair works for the canal section at Palus branch Bambavade canal Minor no 3 km at ch 2330 tal Palus Dist sangli
Repair works for the Canal section at Palus branch main canal Km 29 at HPC structure and Km 30 at near strcture
Construction of Pipe Distribution Network of Main Line Zone 1 from RD 3.3 km To 7.2 km and Zone 2 from RD 3.3 km To 8.52 km of Right bank Canal of Pandhari Medium Project Tq.Warud District Amravati
Repair of Tank, Pipe Leakages, Gratings, Flow Meter, Painting, and Other Petty Works of the Chichala Closed Pipe Distribution System under Subdivision No. 5 at Chainage 31,670 m of the Asolamendha Main Canal, under Asolamendha Project Renovation Divi
Construction of Earthwork and Structures from RD 792 m to 1500 m and Balanced Work of Structures and Earthwork from RD 1500 m to 15330 m inclunding Wild Life Passes on Khindasi Feeder Canal Ta Ramtek Dist Nagpur
Preparation of detailed construction plan for PDN including necessary command survey, linear survey for pipe laying, Chak planning, designing of pipe network and preparation of estimate for Canal No.2 BLI Scheme Part- II Tal. Paithan, Dist. Abad
Repairs and maintenance of extension joint of penstock pipe in open conduit main canal emergency gate of size 1.91X3.53M. 45 M.T. hoist capacity and service gate of size 1.91X3.53 M. 45 M.T.and related works at Chandrabhaga Medium Project,
A) Improvements to Neware - 15 Section Ujani Canal Road Ch 00/00 to 2/00 VR 427 Tal Malshiras , B) Improvements to MDR 118 to MDR 92 Neware Ch 0/00 to 1/00 VR 601 Tal. Malshiras
M and R to Chaskaman Dam by Epoxy Plaster to U/S face of Monolith No.1,2,5, Construction Of Barricades in KM 0 to 72 of Chaskaman Left Bank Canal and Construction Of Generator Room at Chaskaman DAm
Strengthening to existing service Road from Arphal Canal to Jihe Kathapur Barrage at Ch. 2.00 kms to 2.80 kms. by soil stabilisation technique using chemical additives and construction of CD work under Guruvarya Late Laxmanraoji Inamdar Lift Irriga
M and R to Drain inlet for Canal Recharge at Between km 37 to 42 , At km 41 and of Dy - No. 2 at km No.3 and other Allied Work on L. G .C. of Girna Project.
Construction of conversion in Pipe Distribution Network of selected Minors and construction of Command Area Development works in PDN of Kavathemahankal Main Canal KM 56 to 73 including Running, Operation and Maintenance of System for Five years after
Construction of Command Area Development works in PDN on the distribution system of Salagare Main Canal Km 1 to 10 including Running, Operation and Maintenance of System for Five years after completion of work, Tal- Miraj, Dist- Sangli.
Construction of Command Area Development works in PDN on the distribution system of Salagare Branch Canal Km 11 to 30 including Running, Operation and Maintenance of System for Five years after completion of work, Tal- Miraj, Dist- Sangli
Repair Manufacturing of Gate size .6x0.6mtr. 6 No, Escape gate size 1.2 X 1.2mtr. 2 No, 2.5X3mtr. 6 No,2.5X1.51 No Total 15 gates 49,52.800,52.850, 62.720,63,66.540,68,70.930 km Screw stem Hoist along with its components atChaskaman Left Bank Canal
KKLI Project- Takari LIS- Construction of Conversion in PDN and CAD work of Dy of Takari Main Canal Km 71 to 77 including Repair, O and M of the system for five years, Tal-Khanapur, Tasgaon, Dist- Sangli.
Shifting and Increasing Height and New Erection Testing Commissioning of 11 0433KV Pole Mounted DTC 11KV HT and LT lines crossing on canal length of Upper Pravara LBC on ch 11320 at village Unchkhadak tal Akole Dist Ahmednagar
Job work of Manufacturing Erection of Intake Gate 1.2 x1.2 mtr - 2 nos. and Trash Racks with embedment leaf stem hoist M.S.Grating Cover Roof AND Truss arrangement etc for Dhangarwadi LIS AT Ch 58/225 of Arphal canal
Maintenance and Repairs to Hol Additional 2.7 Murum Dr.No.3 Korhale 13.15 Dr.No.1.2, Hol Dr.No.1 Dr.No.4 Drainage Scheme in the command area of Nira Left Bank Canal Tal. Baramati Dist. Pune for the year 202425.
Manufacturing Transportation and Erection of Embedments Gate Leafs, 8Ton Capacity Screw Stem Hoists for Sliding type Cross Regulating Gate of 2.5 M 2.9 M size 3 Nos GhanadHivtad main canal of C.H. 19160 and Manufacturing with QAP fabrication
CONSTRUCTION OF PANDHAN ROAD FROM FARM GULAB PACHBHAI TO SANJAY DOYE AT MOUZA DHAPRLA, TAKA ROAD TO FARM OF PRASHANT DHAKUNKAR AT MOUZA DHAMANGAO, FARM OF CHINDHUJI CHOUDHARY TO BOTEZARI CANAL AT MOUZA MALEWADA TQ. BHIWAPUR, DISTRICT NAGPUR
Repairs and maint of various size canal gates including providing Nut stem rod hoist frame seal plates bearing stemnut gate leaf pedestal worm wheel shaft greasing of stemrod anticorrosive painting of hoist of LIS stage No1and2 Kadakpurna Project
Construction of Inlet at Ch 170 obliq 400 170 obliq 800 172 obliq 740 174 obliq 880 176 obliq 120 176 obliq 400 176 obliq 920 180 obliq 440 and 181 obliq 515 of Kukadi Left Bank Canal
Providing Nala Crossing Near Aqueduct at Ch. 5300 and Ch. 5700 and Providing Repairs to Mandawane Minor, Providing Lining, Providing Repairs to Service Road and Providing Embankment and Other Ancillary Works at RAJNALA Right Bank Canal, Tal - Karjat,
Construction of RCC Box For Railway Crossing at RD 44.40 Km. of Ghodazari Branch Canal.(BR No-221-A at KM 1165/3-4 Between Alewahi-Sindewahi Stations On Gondia-Chandafort Section (BG) by Pushing Method) 2nd Call
Carrying out repair work to Head Regulator of Dys on Main canal Km 81 to Km124 of NRBC Maintanance and repair work of Distrubution system and Raising Height of embankment of N R B C in Natepute Section
Construction of Valve Chambers Footbridges and Command Area Development and Water Management work CAD and WM for Direct Outlet on Ghanand Hivtad Canal in KM 1 to 32 Including Running and Maintenance of the system for five years
Supply Materials for Construction of C. Conc. Road _ (National Highway to Gajanan Sonwane to Canal and Cement Road to Taj Sheikh and National Highway to Radheshyam Marashkolhe)_Under D.P.D.C. (Jansuvidha Vishesh Anudan) Yojana (2021-22) At GP Mansar