Loading…
Loading…
10,111 results • Best match
CONSTRUCTION OF INLET, ESCAPE, and VRB ON ASHTA DISTRIBUTARY at RD 38580 OF BEMBLA MAIN CANAL.
Construction of Balance Part - I Work On Bory Distributary offtake RD. 91110 M.on Bembla Main Canal
Repairing of the Structures and Embankments of Distributary No. 7 (Mohandul) offtake chainage 40/240 m of Bhatsa Right Bank Canal
Provding Cementatious Grout in Gap Between old and New Pipe near D/S control valve unit at Ambeghar Minor Irrigation Scheme, Tal.Pen, Provding Cementatious Grout in Gap Between old and New Pipe near D/S control Valve unit at Bamnoli Minor Irrigation
Proposed plumbing work and sprinkler irrigation system at 60 m. wide DP road (Near J.P.Infra) at Ghodbander at Mira road (E) in M.B.M.C. Area.
Krishna Koyana Lift Irrigation Project(Mhaisal LIS) Kavathemahankal Part Construction of Balance work of Bedag main Canal Km 1 to 9 and Construction of VRB at Ch 3/350 M Foot Bridge at Ch 9/820 M on Kalambi Branch Canal
Krishna Koyna Lift Irrigation Project - Mhaisal LIS (Jath Part)- Construction of balance distribution system in Pipe Distribution Network and Command Area Development work in PDN on Jath Main Canal Km 53 to 81 AND Jath Branch Canal Km 1 to 16
Mhaisal Lift Irrigation Project (Jath Part) Irrigation Management and maintenance of Mangalwedha dy - 1 and 2 during rotation and Non rotation period for year 2020-21
Construction Of Approach Road To Pumphouse Under Krishna Marathawada Irrigation Project, Lift Irrigation Scheme No. 1, Stage 4 At Village at Bavi Tal. Bhoom, Dist. Dharashiv
Krishna Koyna Lift Irrigation Scheme - Irrigation management and maintenance of Extended Gavan L. I. S. during Rotation and Non Rotation period for the year 2024-25
Fabrication and erection of 0.9x0.9 Mtr 4 Nos canal gate and 1.2x1.2 Mtr 1 Nos canal gate of Popatkhed project with Embedment Part Gate Leaf and Screw Stem Hoist 5 MT cap under Executive Engineer Minor Irrigation Division Akola
Providing Operational Staff for Operation of Pumps and Its Allied Equipments in Pump House at Vishnupuri Lift Irrigation Scheme Dist. Nanded for rotation during Year 2025-26.
Repairs and Renovation of canal lining and allied strutures on main canals of medium and minor tank and irrigation manangent works under SD 01 Parbhan
Construction of Selective C.C. Lining at Left Bank and Right Bank Canal (LBC Km 0.00 to 6.00 and RBC Km. 0.00 to 4.00 ) at Upper Manar Lift Irrigation Scheme, Tq. Ahmedpur Dist. Latur
Krishna Koyna Lift Irrigation Scheme- Mhaisal Jath Part Construction of Balance Command Area Development Works in Pipe Distribution Network of Bagewadi Birnal Dy And Its Minors On Jath Main Canal Tal.Jath Dist Sangli
Krishna Koyana Lift Irrigation Project Construction of Sluice Valve chamber for Direct Outlets and Head Regulators of Sonsal Left Bank Km 1 To 23 and Chinchani A Feeder Canal Km 1 To 11
Krishna Koyana Lift Irrigation Scheme Jath Part Construction Of Valve Type Escape For Nalla Feeding at CH. 76300, 76800 and 79800m on Jath Main Canal Km 53 to 81 Tal Jath Dist -Sangli
Krishna Koyana Lift Irrigation Project Converting Direct Outlets and Head Regulators of Sonsal Left Bank Km 1 To 23 and Chinchani A Feeder Canal Km 1 To 11 in to Sluice Valve chamber
Construction of Drain crossing, side drains and apron in selected patches in R.D. 8000 to 10700m. of Pendhari Mokhala Distributory offtaking at R.D. 8730 m from main canal of Mokhabardi Lift Irrigation Scheme
Krishna Koyana Lift Irrigation Project - Mhaisal LIS - Kavathemahankal Part - Construction of C. C. Lining of Dy No.1, 2 and 4 of Salgare Branch Canal km 11 to 30, Tal. Miraj, Dist. Sangli
Construction Of Balance DHPC and HPC on Gadpendhari Distributory And Nimgaon Distributory From Nerla Main Canal On NILS.
Construction of Earthwork and Structures From Km 11 to 16.14 on Main Canal Of Surewada LIS Tah.Bhandara Dist.Bhandara
CONSTRUCTION OF GATED CHECK DAM Medshingi,Gherdi,Aalegaon No.1,2 TAL.Sangola, DIST. SOLAPUR
Providing and erecting Butterfly Sluice Valve 1100 mm dia with its Components at Purandar Lift Irrigation SchemeBaramati Branch Chainage No 10180 Under Executive Engineer Neera Right Bank CanalDivisionPhaltan
Providing and Fixing Information Sign Board At Head of The Branch Canal , Distributary and Minors In 01 To 113 K.M. of Bembla Main Canal.
Supplying Labour for irrigation management in the canal Km.01 to 54 for the Konkan Season 2023-24 of Bhatsa Right Bank Canal.
Repairs to restore efficiency of Vertical turbine pump no. 1 560 HP at stage 5 of Purandar Lift Irrigation Scheme.
Providing Security Services for pump House Satge 1A, 1B, Switchyardand Barrage fo Tembu Lift Irrigation Project Tal Karad Dist Satara
Repairing works of gate and outlet in selected portion of 5R of Kawlewada Distributory under Dhapewada Lift Irrigation Stage I
Construction of Switch Yard Compound Wall at Stage 2 for Dhangarwadi Lift Irrigation Scheme at Helgaon Tal Karad Dist Satara
Supplying, Erection , Testing and Commissioning of Earth Mat at the pump house of Talodhi Mokasa Lift Irrigation Scheme Dist. Gadchiroli
Supplying, erecting, testing and commissioning of earth mat for 6.6 KV Pump House at Reguntha Lift Irrigation Scheme, Dist- Gadchiroli.
Providing one Unskilled Guard each for the Division office and the six Sub Division office under Ambhora Lift Irrigation Scheme.
Removing Providing fabricating and fixing Rubber expansion joint dai. 900 mm for delivery line at Karajkheda Lift Irrigation Scheme Dist.Bhandara
Construction of Compound Wall At Pump House Area in Bramhagavhan Lift Irrigation Scheme Part-2 Tq. Paithan Dist. Chhatrapati Sambhajinagar
Construction of balance structures and drain crossings on Kinhala distributory and its minors of Mokhabardi Lift Irrigation Scheme.(Second Call)
Providing and laying cement concrete pipe for approach roads for Dehani Lift Irrigation Scheme At. Dehani Tq. Babhulgaon Dist. Yavatmal.
Construction of Main Gate and Fencing to Pump house premises with Auxillary works of Haldipurani Lift Irrigation Scheme Ta.Chamorshi Dist.Gadchiroli
Construction of Control Room at Jihe Kathapur Barrage under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme Tal. Koregaon, Dist. Satara.
Construction of Approach Road for Pump House No II of Dhangarwadi Lift Irrigation Scheme at Helgaon Tal Karad Dist Satara
Construction of Forebay Pump House Switchyard Manifold Rising Main and Delivery Chamber at Ch 27775 On Degaon Lift Irrigation Scheme
Construction of protection wall for approach channel of pump house for upper manar lift irrigation scheme tq ahmedpur dist latur
Construction of Office Building for Water Users Association 09 Nos of Haldi Purani Lift Irrigation Scheme Tah. Chamorshi Dist. Gadchiroli.
Supplying erecting testing and commissioning of 4 MVA transformer at switchyard of Gurukunj Lift Irrigation scheme Tq. Tiwsa Dist. Amaravati.
Strengthening Approach Road to Distribution chamber of Jamner branch of Waghur Lift Irrigation Scheme no 1 Tal. Jamner Dist Jalgaon.
Renovation, Erection, Testing and Commissioning of 30 MVA, 220, 6.9 kV Power Transformer at Tembhu Lift Irrigation Scheme Stage 1A.
Construction of Fencing and gate of pump house premises and related work at Kotgal Lift Irrigation Scheme Tah Distt Gadchiroli
Providing Manpower To Perform Work Of Labour, Pump Operator At Upper Wardha Dam, Lbhr, Rbhr, And Gurukunj Lift Irrigation Scheme
Providing and supplying kinetic air valve of various dia. for Dehani Lift Irrigation Scheme At. Dehani Tq. Babhulgaon Dist. Yavatmal.
Construction of BGM Lining on balance length of heavy embankment of Kinhi Distributory of Ambhora Lift Irrigation Scheme Stage II.