Loading…
Loading…
10,111 results • Best match
Supply, Erection, Testing and Commissioning of 5 MVA, 33/6.6 kV standby transformer with allied electrical equipment for 33/6.6/0.440 KV Dehani Switchyard at Dehani Lift Irrigation Scheme. Tal- Babhulgaon, Dist- Yavatmal.
Repair And Maintenance Of Existing LT Distribution Panel at Sub delivery chamber No.1 2 3 4 7 and 12 Stage II under Dehani Lift Drip Lift Irrigation Scheme Tal. Babhulgaon, Dist. Yavatmal
Carrying out Command survey, PDN Design and estimate for command area of Rasingwadi, Vetane, Jalkemala, Gandhinagar, villages from Ransingwadi and Vetne shaft of andhali tunnel under Jihe Kathapur Lift Irrigation scheme, Dist. satara .
Preparing KML file and maps by Geotagging of pump House, Rising mains, Gravity Mains, Cluster Lines, Main Distribution Chambers, Sub-Distribution Chambers and Cluster under Dehani Lift Irrigation Scheme Ta. Babhulgaon Dist. Yavatmal.
Operation and running maintenance of 05 Nos. of forced water lubricated type vertical turbine pump with its allied equipments excluding switchyard equipments for the year 2019 20 at Karajkheda Lift Irrigation Scheme Dist.Bhandara.
Construction of Head works, Pump houses, Switchyards, Rising main, Delivery Chamber, Pumping Machinary etc. Allied Civil, Mechanical and Electrical work, Closed Pipe distribution system for Bhadale Lift Irrigation Scheme under Guruvarya Late Laxmanra
Supplying Man Power for Vasana at Wangana Lift Irrigation Scheme on Dhom Left Bank Canal
Repairs to Spillway Cleaning and Removal of Trees and other Stuff Repairs to Service Road of Chandur Distributary of Old Main Canal from RD3400 to 4425m and New Left Bank Canal from RD8450 to 9500 m with Casing Material in Selective Patch and Remov
Cinchwadi Minor Irrigation Project, Tal.Rajapur, Dist. Ratnagiri. Chinchwadi M.I. Project, Tal. Rajapur, Repairs to Spillway Waste Weir Bar, Stilling Basin Bottom Concrete and Glacier Concrete and Construction of Causway on Tail Channel.
Raperi Project Fabrication and erection of Approach Bridge Well Top Grill Ladder Trash Rack Well Top Raililng of 0.9x0.9 Mtr Gate of Raperi MI Tank under Executive Engineer Minor Irrigation Karanja Lad
Repair of Service Gate 2.05 X 1.77 M-1 No. and size 1.85 X 3.31 Mtr 1 No. of Purna Project under Executive Engineer, Medium and Minor Irrigation Division, Achalpur Dist Amravati.
Construction of concrete Gutter on Pandur Ghotge Diversion Road and DS side of Dam and also construction C.D.Work on Pandur Ghotge Diversion Sub Road for Minor Irrigation Scheme Dendonwadi, Tal. Kankavali, Dist.Sindhudurg
Renovation of 33 3 3 kV Power transformers Switchyard equipments with allied accessories and hardware etc complete along with 2 Years operation work for Lower Terana Lift Irrigation scheme Stage No 1 to 5
Design fabrication supply erection testing and commissioning Double Girder EOT crane EOT crane of 35 5 MT of Pump house at Krishna Marathwada Lift Irrigation Scheme 2 stage 4 Pangardarwad Tal Tuljapur Dist Dharashiv
M and R of Main canal For Irrigation Season of Wai Minor Project
M and R of Main canal For Irrigation Season of Nawargaon Medium Project
Krishna Koyna Lift Irrigation Scheme - Construction of V.R.B in K.M.81 of CH 80-400, K.M.86 of CH 85-600 of Takari Main Canal.
Canal Lining work and Repairs of structures of Dongargaon M I Tank of Soundad Irrigation Section of Irrigation Sub Division Nawegaonbandh
Construction of Earthwork and Structures on Sub Minor 1 and Branch Sub Minor of Sub Minor 1 of Minor No 2 and Sub Minor 1 and Branch Sub Minor of Sub Minor 1 of Tail Minor of Left Bank Main Canal of Popatkhed Stage II Minor Irrigation Tank Taluka Ako
Construction of Balance Drain Crossing on Chinchmandal Distributary and Balance Drain Crossing and Village Road Bridge on Left Minor No. 01 to 04 of Chinchmandal Distributary
INTERNAL SURFACE COATING WORK OF RISING MAIN HAVING DIA.2.2 MTR. FROM CHAINAGE 2800 MTR TO 3450 MTR BY CLEANING AND PAINTING OF RISING MAIN ETC.COMPLETE AT PURANDER LIFT IRRIGATION SCHEME
Work to construct a protective wall to prevent water from the canal near Tilari right bank distributary No. 7 in Km 26 at RBC from entering and causing damage to Mr Sagar Parab field of Tillari Interstate Irrigation Project
Constructing Earthwork and Structures of Distributary No. 1 of Right bank canal of Kordi Medium Project, Tal. Navapur, Dist. Nandurbar
Emergency repair maintenance work for Punadi Stage I II and III and Visapur Stage I and II
Providing manpower for operation and maintenance of Switchyard equipments of Kawathe Kenjal Stage I and II and Watch and Ward for Stage 1 for Two calender year
Design Supply Erection Testing Commissioning of 22 kV Feeder Bay at MSEDCL Bhatghar substation 22 kV single circuit Transmission line from Bhatghar substation to Dhom Balakwadi LIS and 22 kV outdoor switchyard alongwith 22_11 kV 8 MVA Power Xmer
Providing Manpower for operation and maintenance of switchyard and 33 kV transmission line for Jihe Kathapur Lift Irrigtion Scheme Stage 1 2 3 for one year
Erection of CCTV system in switchyard area amd premises at Punadi Stage I II and III and Visapur Stage I and II
Supply erection testing and commissioning of 20 Kw Off-grid solar project at jihe kathapur 132 KV switchyard stage-2 and 15 Kwp Off-grid solar project at jihe kathapur stage 1 and stage 2 pumphouse Tal koregoan Dist. Satara
Execution of Ancillary works For Irrigation Management on Wandri Medium Project Tal Dist Palghar to operate Konkan Irrigation Season 2023 24
Krishna Koyna Lift Irrigation Scheme (Jath Part) Balance Work of at Mhaisal Stage 6A Ankale and 6B Khalati L I Scheme (Construction of Security Cabin, Landscaping, Service Road, Toilet Block) Tal Jath Dist Sangli
Supplying , erecting , testing and commissioning of 2 Nos. of 110V DC (55cells 2V each) battery set and 1 No. of DCDB float cum booster charger set at Dehani Lift Irrigation Scheme Tq. Babhulgaon Dist.Yavatmal
The work of Supplying, installing, testing and commissioning 3 phase, 22-3.3 kV, 50 Hz., 1250 kVA, Power transformer at 22-3.3 kV switchyard of Birwadi lift irrigation scheme, Bhatsanagar, Tal. Shahapur, Dist. Thane.
Krishna Koyna Lift Irrigation Scheme - Mhaisal LIS (Jath Part ) Construction of Piped Distribution Network of CADWM Work on Mangalvedha Sub mains on Umadi Dy. (ForAsabewadi,Shivangi, Lavangi, Yalagi, Soddi Including Running, Operation and Main
Providing Annual Operation and running maintenance of 12 Nos. of forced water lubricated type Vertical Turbine Pump with its allied equipments excluding switchyard equipments for the year At Nerla Lift Irrigation Scheme Dist. Bhandara.
Providing Annual Operation and running maintenance of 02 no.of forced water lubricated type Vertical Turbine Pumps with its allied equipments excluding switchyard for Nimn Chulband Lift Irrigation Scheme Dist.Bhandara for the Year 2023-24.
Operation and running maintenance of vertical turbine pump and with its allied equipments of stage .1 at various SDC . 34 Nos for year 2024. 25 at Dehani Lift Irrigation Scheme stage. 1 Dist Yavatmal
Takari Lift Irrigation Scheme Repair and Maintaince work of Takari Stage 1 to 4 including removal of Leakage work fitting of 3 track sliding windows fitting of birds barrier net and other related work
For the Year 2023-24 For Operation of 12 nos. of Forced water lubricated type Vertical Turbine Pump with its allied equipments excluding switchyard equipments for the year at Nerla Lift Irrigation Scheme Dist.Bhandara.
Repairing Forced Water Lubricated Vertical Turbine Pump No 8 bracket 4 No 900 HP Pump House I and 4 No 325 HP Pump House II at Dehani Lift Irrigation Scheme Stage I, Dist Yavatmal
Design with quality assurance plan at all stages of Design manufacturing supply erection testing and commissioning of 03 Nos Submerged centrifugal Pump Vertically Mounted with motor with allied equipments for Bordinala Lift Irrigation scheme
Design with Quality Assurance Plan at all stages of Manufacturing Supply erection testing and commissioning of 100 HP (Tentative) submerged Centrifugal ( Pontoon mounted) pumps 2 nos and allied equipments for Ranjani Lift Irrigation Sc
Design manufacture supply erection testing and Commissioning of 33 to 3 point 3 kV Switchyard with allied equipments alongwith Power Auxiliary Transformer and associated work at Tukai Lift Irrigation Scheme Tal Karjat Dist Ahmadnagar
Providing Annual Operation and running maintenance of 03 no.of forced water lubricated type Vertical Turbine Pumps with its allied equipments excluding switchyard for Gurukunj Mozari Lift Irrigation Scheme Dist.Amravati for the Year 2023-24.
Providing Annual Operation and running maintenance of 03 no.of forced water lubricated type Vertical Turbine Pumps with its allied equipments excluding switchyard for Rajegaon Kati Lift Irrigation Scheme Dist.Gondia for the Year 2023-24.
Upgradation implementation of automation work based on SCADA of Phase-1 and Phase-2, operation and maintenance of complete automation system (up to 5 year) of Dehani Lift Irrigation Scheme under Bembla River Project
SUPPLYING, ERECTION, TESTING AND SUCESSFULLY COMMISSIONING OF VERTICAL BLADDER TYPE VESSEL WITH LOAD CELL ARRANGEMENT AND THREE STAGE SURGE SUPRESSION KINETIC AIR VALVE FOR AMBHORA LIFT IRRIGATION SCHEME STAGE II TAH - KUHI, DISTT - NAGPUR
Operation and running Maintenance, of electro-mechanic equipments during Rotation/Non rotation complete job for Wakurde Lift Irrigation Scheme Part I-Stage II Pumphouse Tal. Shirala, Dist. Sangli for Year 2025-26, 2026-27.
Operation and running Maintenance, of electro-mechanic equipments during Rotation/Non rotation complete job for Wakurde Lift Irrigation Scheme Part I-Stage I Pumphouse Tal. Shirala, Dist. Sangli for Year 2025-26, 2026-27.
Repairs to Canal Gates on Left Bank and Right Bank Canal to Torana Project, Under Executive Engineer, Buldhana Irrigation Division, Buldhana.