Loading…
Loading…
10,111 results • Best match
Repairs and maintenance of outlet gate of left bank canal Right bank canal Manar godavari canal 1 Mannar Godavari canal 2 Dam outlet gate of LBC RBC Annual Maintance of Godbole gate at Lower Mannar Project.
CONSTRUCTION OF LAND DEVELOPMENT WORK (PART 1) FOR OUTLETS OF SALAEWADA, KESALWADA AND CHIKHALI MINOR AND SUB MINOR ON NERLA MAIN CANAL Of NLIS
Construction of Earthwork, Additional structures and Selected lining of Minors and Sub Minors on Distributory L2 at RD 18440m of B1 Branch on Gosikhurd Right Bank Main Canal.
PandhariMedium Project Tq. Warud, Dist. Amravati Construction of Railway crossing for Zone-1 Distributary of Pandhari Medium Project
Repairs and Maintenance to Variuos sizes of Canal Gates at Sindhi Rahati, Jamgaon, Chinchala and Telgaon Branch Canal of Isapur Righat Bank Main Canal, Dist Nanded
Repairs and maintenance of Sliding type canal gates of (size 0.3 x 0.3 Mtr-35 No, size 0.45 x 0.45 Mtr- 13 No., size 0.6 x 0.6 Mtr- 50 No., size 0.9 x 0.9 Mtr-04 No., and size 1.0 x 1.0 Mtr-06 No.) at various locations at Jamda Left and Right Canal
Repairs of Old Main Canal From RD0 To 17010 m and New Main Left Bank Canal From RD 0 to 17370M Along With all Distributories Minors and Sub minors with Tail Earthwork and Supplying labour for management work for Kharip Rabi and Hot Weather Season of
Construction of Direct Out Let DOR 9 at RD 12040 M and DOL1 at RD12080 M and Additional VRB at RD14000 M of Old Main Canal and Construction of VRB at R D 15000 M and of New Left Bank Main Canal of Morna Medium Project
Mfg including Material Labor Fabri. Painting Transportation and Erre. of Dismantle type Cabin Cum Shed On Intake Well and DSSG Hoisting Arrangement. Staircase inside the Intake well from RL591.487m TO RL648.15m etc. at Dhamni Irrigation Project.
Construction of Part - I Work on Dongargaon Minor and Direct outlets of Kinhala Distributory offtaking at RD.107880 m. on Bembla Main Canal
Construction of Other District Road Bridge on MinorNo. 1 to 20 and Construction of Cross Regulator in Km 12 of Kosara Branch Canal.
Construction of Part - I Work on Mardi Minor and Bambarde Minor of Kinhala Distributory offtaking at RD.107880 m. on Bembla Main Canal.
Construction of Balance CTB, INLET on Karanji minor No.2 and its sub minor offtaking at RD 71610 m of Bembla Main Canal.
Construction of Part - I Work on Wadgaon Minor and its Subminor of Kinhala Distributory offtaking at RD. 107880 m on Bembla Main Canal.
Supply of Manpower for Irrigation Management in Rabbi season in 2022-23 under Irrigation Sub Division Seloo Tah. Seloo, Dist.Wardha.
Jain Irrigation Systems Limited Solar Water Heating System 1000, Jain Irrigation Systems Limited Solar Water Heating System 1000 Litres Capacity
Construction of parking shed for vehicles in Tapi Irrigation Development Corporation, office and Jalgaon Irrigation Project Circle office premises, Tal.Dist.Jalgaon
Supply of Manpower for Irrigation Management in Rabbi season in 2021-22 under Irrigation Sub Division Seloo Tah. Seloo, Dist.Wardha.
Supply of Man Power by out sourcing for Irrigation Management work to Urmodi Irrigation Sub Div, Vaduj and Sectional Offices.
Supply of Man power by Out Sourcing for Irrigation Management work to Urmodi Irrigation Sub Div, Vaduj and Sectional Offices.
Irrigation management work Rabbi Hot weather Irrigation for year 2020 21 of Khamari Kati Fulchur and Mundipar Ex Mal Tank
Construction of compound wall with wire fencing at Udgir Irrigation Colony and at Wadhona Irrigation Colony tq. Udgir Dist. Latur
Construction Of CC Drain From Dr. Dhore Hospital To Canal AND Shri Sunil Vade Shop To Canal AND Sahil Shop To Canal AND Shri Shrawan Darpawar To Canal In Sai Nagar At Shivsena Vasahat, In P.No 18
Repairs and Maintenance to Canal Gates of size 300 X 300 mm-22 nos Canal gates of Isapur Left Bank Main Canal (0 Km to 90 Km) and Chalgani Branch Canal of Upper painganga project Dist. Yavatmal.
Construction of Part I and III LD Works in chak OL7 TAIL of RM66, OR-1,OR-2, TAIL SM1 RM66 IRBC UPP C,hak DOL 1,DOR 14 on Karkheli Branch Canal IRBC UPP
Restoring Embankment Due to Heavy Rainfall at ch 41120 to 41310 m and Construction of Foot Bridge at ch 41670 m Of Banda Branch Canal in km 42 Of Tillari Irrigation Project Tal Dodamarg Dist Sindhudurg.
Repairs to Fall cum VRB of LM 15 ,Repairs to Fall of LM13 of Nimgaon branch canal including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.14 Ardhapur
Command Area Survey, Planning, design and preparation of Estimates for work of part 1 (OFD Works) in Pipe Distribution Network/ Open Network in command area of Khatav Canal K.M. 0.00 to 76.00 of Urmodi Irrigation Project
Repairs to Fall in 14 km and C C Lining at 11300 m of Chenapur branch canal including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.16,17 Lahan
Construction and Renovation of Earthwork and Structures of Borchandali Distributory at RD 30825 m and Virai Distributory at RD 32840 m offtaking from Main Canal of Asolamendha Project and creation of 1108 Ha. of irrigation potential.
Manufacturing And Supply Straight 1536 Nos And Curved 335 Nos Type Needle Gates For K T Weirs For Bhima And Mann River Under Ujjani Canal Subdivision No. 52 Mangalwedha For Bhima Irrigation Division Pandharpur Dist Solapur.
Providing Operational Staff and carry out job work required for operation and petty maintenance, supervision by means of electrician and Semi-Skilled Mazdoor for Control Room of Pump House, Pump -motor Rotation including all electrical equipments wit
Supplying, Erecting , Testing and Commissioning of 9 Nos. 11/0.433 kV, 100 kVA transformers at S.D.C 1, 4, 5, 9, 15, 16 ,18, 23 and 24 and Repair, Maintenance, illumination arrangement with LED fiiting street light with accessories at Dehani and Ch
Construction of Cross Regulator at R.D. 1000 M on Main Canal of Gosikhurd Left Bank Canal
Ekburji Medium Project Tq Dist Washim Canal Embankment and lining of Right and Left bank canal
CONSTRUCTION OF VRB at CH 8 obliq 785 PONDHAWADI BRANCH CANAL OF KUKADI LEFT BANK CANAL
Construction of Lining of LM-20, LM-21, LM-22, LM-23, LM-24, LM-27, LM-28, RM-10, on Tirkaswadi Branch Canal at 69380 m on IRBC.
Construction of Pipe Distribution Network from Km. 1 to 7 and Kandalgaon and Gadegaon Minors of Right Bank Canal Stage-2 of Barshi Lift Irrigation Scheme including formation of WUA of all above disnet, running and maintainanace of the system for Five
Const. of Part I and III of L.D. Works in Chak OR1,2,3 4 and OL1,2,3,4 On RDY1 of Karkheli Branch Canal of IRBC of UPP
Krishna Marathwada LIS N0. 2 Stage No 4 Construction of HPC For Crossing of Canal at Ch. 5640 And Ch. 7660 Tq Tuljapur Dist Dharashiv
Construction of Earthwork and Lining of RM-3, LM-5, LM-7 on Nimgaon Branch Canal at 56360 m on IRBC.. Tq. Ardhapur Dist - Nanded
Removal of Debris in Railway Syphon KM 45 on Gosikhurd Right Bank Main Canal, Tah Bramhapuri, Dist. Chandrapur(3rd Call)
Rehabilitation of irrigation system of Sitepar Ex-Mal Tank Tah Sakoli Dist. Bhandara
Rehabilitation of irrigation system of Sangadi Ex-Mal Tank Tah Sakoli Dist. Bhandara
Rehabilitation of irrigation system of Walmazari Ex-Mal Tank Tah Sakoli Dist. Bhandara
Rehabilitation of irrigation system of Umri Ex-Mal Tank Tah Sakoli Dist. Bhandara
Providing manpower for operation and maintenanace of Switchyard equipments and filteration and topping of Transformer oil of Lalnala Lift Irrigation Scheme Tal.Samudrapur Dist.Wardha for Two years.
Providing manpower for annual operation and regular maintenance of 33/6.6KV switchyard equipments at Borghat Lift Irrigation Scheme Tal-Mul Dist. Chandrapur for Two calender years
Providing outsourcing staff for running and attending the office of Takari Electrical E and M Lift Irrigation Division Sangli for one year i e 12 Months
Operation and Maintenance of 33_6.6 kV switchyard equipment at Ambhora Lift Irrigation Scheme stage 1 and stage 2 Tal . Kuhi , Dist. Nagpur for the year 2020_21