Loading…
Loading…
10,112 results • Best match
Construction of Bridge over Canal at Sundrai Nagar W.N.4.
Repairs to Head Regulators and HPD of Jarendeshwar Branch Canal
Constructing VRB in Km 19 of Chankapur Right Bank Canal
Metalling Canal to Zodgevasti Chaudharivasti Road at Ghodegaon Tal.Newasa, Dist.Ahmednagar
PRAPOSED ESTIMATE FOR WATER SUPPLY PIPE LINE KALANE TO CANAL
Constructing wall near Canal at Hinganemala, Tal-Haveli, Dist-Pune.
CONSTRUCTION OF INLETS ON BRANCH CANAL OF GOSI BK LIS
Repair work on Dam and Canal of Katangi Medium Project
Repairs to Warna Left Bank Canal Minor 8 to 19
Constructing Escape in Km 07 of Suple Left Bank Canal
CONSTRUCTION OF BRIDGE OVER CANAL IN SHAHAPUR NAGAR PANCHAYAT AREA
Repairs of Structures and lining of Kanher Right Bank Canal.
Const. of Sakav on Canal road At-Vadgaon Tal-Pen
Repairs to Box Culvert at ch 0680 of Krishna Canal
M n R work to canal of suregaon and Kakaddabha
Repairs Work Of Lingnoor Canal K.M. No. 1 to 15
Repairs works of Dam and Canal at Hiwara Tq.Nandgaon Kh.Dist.Amravati
Repair of bridge slab on canal at Gut No. 2.
Construction of Outlet at ch 18400 of Sangola Main Canal
66.CONSTRUCTION OF CANAL SHIV ROAD AT ZAPWADI TAL. JUNNAR
Construction of VRB at ch 79/065 on Krishna canal.
Darna Project Godavari Right Bank Canal (Earthwork, Lining and Structures)
WIRELESS DIGITAL 16 CHANNEL RECEIVER IN THE CANAL HEARING AID
Construction of Sign board/Name board on various locations on Gosikhurd Left Bank Canal. on Gosikhurd Left Bank Canal.
Construction of Balance Pipe Distribution Network System For MR-1, ML-3, MR-4, ML-6 and Tail Dy on Branch B-3, ML-1/2 and ML-4 on Bramhapuri Distributory of Gosikhurd Right Bank Canal(Total Irrigation Potential of 1347 Ha.) including Command Area Dev
Repairs to CC lining at Km 1 and Km 4 of Barad Dy,Repair and maintanance of VRB at Km 1 of LM 10 of Tirakaswadi Branch Canal including Carrying out irrigation management work in Rabbi and Hot weather season 2025-26 under U.P.I.Section No.19
Construction of Part I III LD Works in chak OR1 To OR4 OL1 OL2 RM4 Dharmabad Br Canal IRBC UPP
Replacement of existing Earthwire by OPGW cable alongwith accessories and hardware and for diversion work of 220kV Wardha Warora DC linefrom the catchment area of Shirud Minor Irrigation Project Tal Hinganghat Dist Wardha
Construction of a protection wall for the collapsing hillside adjacent to the dam approach road between chainage 0-310 m and 0-380 m for Talvade Minor Irrigation Project, Taluka Rajapur, District Ratnagiri.
Construction of Lining of RM-7, RM-7-A, RM-8, RM-9, LM-12, LM-13-A, LM-13-B, SM-1/LM-13-B, SM-2/LM-13-B, LM14, SM-1/LM-14 and LM-15 on Tirkaswadi Branch Canal at 69380 m on IRBC
Construction of Lining of LM-1, RM-2, RM-3, LM-4, RM-5, RM-5A, RM-6, RM-6A, LM-7, LM-7A, LM-8, LM-8A, RSM-1/LM-8A, LSM-1/LM-8A Minors on Distribution Network of Chenapur Branch Canal AT 66400 m on IRBC.
Special Repair to Main Canal of M.I. Tank at Guguldoh Tah. Ramtek.Special Repair to Main Canal of M.I. Tank at Guguldoh Tah. Ramtek.
M and R TO LEFT CANAL SERVICE ROAD OF MEDIUM PROJECT EKRUKH, TAL. NORTH SOLAPUR.
Removing Silt from Main Canal (RD-10.00 to 23.00 km) and cutting thorny bushes from I.P and S.R. side on Main Canal of Lower Wardha Project..
Manufacturing Erection of H.R.gate at tail structure of Koparde aproach canal under tarali project, under control of Executive Engineer Kanher canal division no.02,Karavadi(Karad)
Repairs to Canal Syphons at Ch.4500m, at Ch.8970m, at Ch.15150 m and minor no.4 ch.1297 of Morba Branch Canal. Tal.Mangaon, Dist.Raigad
Removing Silt from Main Canal (RD-0.00 to 10.00 km) and cutting thorny bushes from I.P and S.R. side on Main Canal of Lower Wardha Project.
Construction of Earthwork and Structures of Khairna Minor and Moharna Minor No.1 on Branch Canal N.3 of Gawarala Distributory of Gosikhurd Left Bank Canal
REPAIRS and RENOVATION WORK OF BUILDING AT COLONY PREMISES OF LOWER WARDHA CANAL DIVISION FOR OFFICE BUILDING OF LOWER WARDHA CANAL SUB-DIVISION NO.1 PULGAON
Construction of Sluice Valve and valve Chamber on various Dy-Do gates, , H.P.C. on Dy 3 Jadhavnagar road , Canal crossing and Sluice valve Takari Main canal
REPAIR OF DIRECT OUTLET GATES ON MAIN CANAL KM. 1 TO 5, MINOR NO. 25 A AND RIGHT BANK CANAL OF BARSHI L.I.S. TAL. BARSHI, DIST.SOLAPUR
Construction of Earthwork and Structures on Moharna Minor No.4 and Tail Minor on Branch Canal No. 3 of Gawarala Distributory of Gosikhurd Left Bank Canal
Construction of Gravity Pipe Main Off taking from Thanegaon Branch on Left Bank Canal of Bodalkasa Tank to Right Bank Canal of Bhadbhadya M I Project
Repairs and Reconstruction of Tail outlet structure cum dissipation structure on Nisatkheda Distributory offtaking from Mauda Branch Canal of Pench Left Bank Canal of Pench Project
Construction of C C Lining Of Km 1 Darganhalli Canal and Head Regulators Of Miner 11 to 15 of Darganahalli Canal of Ekrukh L I S
Repair of Pitching To Yerala Aqueduct (Left and Right Side) At Takari Main Canal Km 45 and Pitching Work of Escape At Main Canal Km 44.
Construction of Balance Earthwork, lining and structure in Km 102 to 114 of Majalgaon Right Bank Canal and Anandwadi Branch Canal of Jayakwadi Project Stage-II
Anti Corrosive Treatment to Radial gates, Irrigation Outlet Gate, Power Outlet Gate, Escape Gate, Stop Leg Gate etc. of Terwanmedhe Pick up Weir of Tilari Interstate irrigation Project, Tal-Dodamarg, Dist-Sindhudurg.
Supply of man power for Irrigation Management in Kharif and Rabbi Season in 2019-20 of Antargaon Irrigation Section of Panchdhara project and Takli Borkhedi project Tah. Seloo Dist.Wardha 2nd call
Job work for operation and petty running maintenance of V.T. pumps in irrigation and Non irrigation programme at Takari Stage II to IV pump house with allied mech. and elect. Equipments