Loading…
Loading…
1,26,423 results • Best match
Transformer oil topping up and Filtration work for Transformers and switchyard equipments at Visapur Lift Irrigation Scheme Stage 1 and 2
Supplying of filtered transformer oil for top up of power transformers installed at Takari Lift Irrigation Scheme Stage 1,2,3 and 4
Replacement of 33 KV SF6 Circuit Breaker CT and providing of lightning arrestor in switchyard area of Takari Lift Irrigation scheme
Emergency repair and maintenance work and running of switchyards and HT lines of Takari Lift Irrigation Scheme Stage 1 to 4
Supply Installation Testing and commissioning of maintenance free earthing system to the Tembhu Lift Irrigation Scheme Stage I to Stage V
Annual Plan-2022-23 PAZHAYANNUR BP PROVIDING LIFT IRRIGATION FACILITY FOR PANJAL VADAKKEPATTU PADASHEKHARAM-PANJAL GP-S0148/23- General Electrical Work
Supplying erecting and commissioning of secondary bay and auxiliary transformer in switchyards of Urmodi lift irrigation scheme stage 1 and 2
Implementation of Minor Irrigation Scheme at Kshet Bandhu at Kulidiar village of P.O. Nayansukh,Farakka. ) SL.NO.4 Part-B (3rd call).
Implementation of Minor Irrigation Scheme at Krishak Sangha at Kulidiar village of P.O. Nayansukh,Farakka. . SL.NO.2 Part-B (3rd call).
Implementation of Minor Irrigation Scheme at Sech Bandhu at Kulidiar village of P.O. Nayansukh,Farakka. . SL.NO.3 Part-B (3rd call).
Construction of Gairi Gaon Surface Flow Minor Irrigation Scheme at Mouza-Simbongdera.
Musey Khola New Minor Irrigation (MI) Scheme at Mouza-Takdah Tea Garden
Construction of Structures (CTB,VRB) on North Canal and South Canal of Bramhagavan Lift Irrigation Scheme Part I Stage II, Tq. Paithan Dist. Chhatrapati Sambhajinagar.
FDR-2025- Permanent restoration of Inspection path from D-25 and Distributory canal of Nizamsagar Main canal to Damarancha Main Lift Irrigation Scheme-2d call
LIFT IRRIGATION PIPE LINE EXTENSION
Micro Irrigation facities at the land of i) Amulya Roy son of Churkutu Roy and ii) Obedul Haque son of Sasiuddin at Part No 13/31 (HEAD OF FUND- 5th S.F.C)
On Turnkey Basis Construction of Teriya nala Dam and micro irrigation System Under Badadev Micro irrigation Projcet, as per detailed scope of work but not limited to that
Design, Supply, Installation, Testing and Commissioning of Multi Stage Split case/ Centrifugal Pump with Stainless Steel Impeller, Coupled to Squirrel cage InductionMotor and its allied accessories for up-gradation of Lift Irrigation scheme Baroo 1st
Electrical works at Lift Irrigation scheme Guiwa of MISD Pattan.
Plan 2019-2020,Annamanada GP, chettikunnu lift irrigation pipeline extension
Renovation of Haritkranti Lift Irrigation Scheme,Pusnad Tal.Shahada Dist. Nandurbar
Renovation of Shri.Uttar Tapi Lift Irrigation Scheme,Biladi,Tal.Shahada Dist.Nandurbar
Electrical works at Lift irrigation scheme Darwazbal of MISD Sumbal
ponneri parakadav Lift irrigation pipe line exstension in kulukkalur Gp.
. Renovation of Shri.Vishwatirth Lift Irrigation Scheme, Kakarda Tal. Dist Nandurbar
Electrical works at Lift irrigation scheme Hamdara of MISD Pattan
Electrical works at Lift irrigation scheme Kanipora of MISD Sumbal
Electro-mechanical and allied works at Lift Irrigation Scheme Aadipora.
Repairs to damaged CGI shed at lift irrigation scheme Chainabal.
Repairs to 05 cusec pump at Lift Irrigation Scheme Magraypora.
Repairs to electric substation at lift irrigation station Aijipur trewa
S0104/23 VARANDARAPPILLY GP-MUTHUMALA LIFT IRRIGATION WARD 14 RETENDER
Electrical work to be carried out at lift Irrigation Khadniyar.
S0072/24 Ammadam lift irrigation maintenance ward-9 Paralam GP
Electrical work to be carried out at lift Irrigation Khadniyar.
Electrical repairs at various Lift Irrigation schemes of MISD Sopore
Mechanical works at Mazbugh Lift Irrigation Schemes of MISD Sopore.
Mechanical works at various Lift Irrigation schemes of MISD Sopore
Construction of A Lift Irrigation Scheme At Bhaginghar, Tal - Velhe
2023-24 Meloor GP - Naduthuruth Parudeesa Lift Irrigation Road Maintenance
Mechanical works at Lift irrigation scheme Sheerbugh of MISD Pattan.
Electrical work to be carried out at lift irrigation Zehanpora.
Mechanical works at Lift irrigation scheme Markundal of MISD Sumbal
Mechanical works at Lift irrigation scheme Hamdara of MISD Pattan.
Repairs to HT,LT Transformer at lift Irrigation Scheme Novla.
Mechanical works at Wanpora Lift Irrigation Scheme of MISD Sopore.
Electrical works at various Lift Irrigation schemes of MISD Sopore.
Angamaly BP Karukutty Kariamparambu Lift Irrigation Pipeline Extension (West Greenland)
Rewinding of 40 HP motor of lift irrigation scheme Novla
Renovation of Shri.Siddheshwar Lift Irrigation Scheme, Lahan shahada,Tal. Dist.Nandurbar