Loading…
Loading…
166 live119 closing this weekmost from U P Irrigation Department (Civil) and Directorate of Local Bodies UP
166 results • Best match
New Construction of Barhan canal track from Gohila bridge to Nagla Haridasi
Construction of Nagla Taal Primary School, Shahalampur to canal bank Sarjanpur culvert
Repairing and Resurfacing Canal service road of Left bank of West Allahabad Branch from km 14.000 to 16.500
Work for pothole-free maintenance of the service road along the leftbank between Km 1.750 to Km. 5.000 of Gola main canal and Km 0.500 to Km 2.000 of Gola Branch Canal
Restoration bed, service road, dowla and bank at km 14.400 Gursarai main canal. Lot02
RENOVATION OF SERVICE ROAD OF GYANPUR MAIN CANAL FROM KM 52.300 TO KM 53.500
New construction work on the drain track from Fatehpur Sikri canal to Gadhima temple
LOT-09 Patch Repair work (Gaddhamukti) from Km 34.850 to 35.550 of Ranipur Main Canal.
LOT-10 Patch Repair work (Gaddhamukti) from Km 51.050 to 51.650 of Ranipur Main Canal.
PATCH WORK OF SERVICE ROAD OF GYANPUR MAIN CANAL FROM KM 47.000 TO KM 50.880
PATCH WORK OF SERVICE ROAD OF GYANPUR MAIN CANAL FROM KM 39.400 TO KM 43.900
Construction of a new road from Kota to Sonve Canal in Mauja Kota (Shankargarh Block)
17 CC construction work from the canal to the village in Gram Ghadi Khangar, Khanda
Restoration of bank of Betwa main canal along with parallel drain at km 4.600 Lot 01
Construction of the missing road link along the canal Patri from Samthar Mandi to Pahadpura Bridge
CONSTRUCTION OF BITUMINOUS ROAD FROM CRITICAL CARE HOSPITAL TO NH27 ALONG THE CANAL AT DIST UNNAO
Repairing and Resurfacing of service road on Umrahat pump canal from km 5.000 to km 6.410
Project for Reconstruction of Damaged Outlets(Kulaba) of Kotiya Dy under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Khopapar Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Bankati Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Dubauli Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Jagesra Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Bharoh Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Chauri Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Bimati Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Piprapathak Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Sultanpur Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Karuandi Minor under the Gola pump Canal System
Project for Reconstruction of Damaged Outlets(Kulaba) of Madraha Minor under the Gola pump Canal System
Construction of Office Buliding for 4th sub division under Irrigation Division 3rd Banda at District Banda Hedquater (LOT-01)
21- Eastern Yamuna Canal Road Renewal Work On The Right Bank From Km 111.376 To Km 112.756.
New construction work of G.T.Road to Purvamir Road via the canal bank (Including 05 years Maintenance Cost)
C/O Sitapur Branch Canal Patri Road Km 3 to Manikapur Link Road with five year maintenance
Repairing of Service Road Of Pathrai Left Main Canal from Km 0.00 to Km 5.240. (Lot-6)
PROVN OF IRRIGATION WATER CHANNELS IN FARM AREA AT EBS BABUGARH UNDER AGE B/R-II OF GE (NORTH) MEERUT CANTT
Laying of Interlocking and Construction of drain from Ramcharan house to the canal in village Rajepurkhurd, Block Aliya
Const. of Aurangabad Canal Road to Bhutha Gaon Link Road in Block Jhinjhak. (C.C. Work Including 05 Years Maintenance)
The Renovation Work of the Service Road From Km. 0.200 to Km. 19.850 of The Eastern Ganga Main Canal.
Construction of RCC drain from Paltadevi Marg to Purba Canal in Ward No. 10 Subhash Nagar, Nagar Panchayat Kapilvastu
Construction of road from Chainage 4.450 (Rajghat Road) of Left Lalitpur Canal Service Road upto NH-44 via RTO Office
Road Naveenikaran work of Farrukhabad Branch s canal service road from km. 30.000 to km. 31.413 for the year 2026.27
New Construction work of R.C.C drain with RCC Covers at Hardaulpura from Rajkumar light house Towards Canal in N.P Badagaon
In Ward No 15 Shaheed Kirtikar Nishad Nagar construction of a concrete road from Ram Milans house to the canal
New Construction work of Road from Kotana to Khandrawali Canal in the Baghpat District under the financial year 2026-27
Construction of the Khokhiya Mubarak to Dombarwa Canal Track link road in Dist Kushinagar under CMGSY Scheme in FY 2026-27
Road Naveenikaran Work of Bahota Dy s canal service road from km. 11.468 to km. 13.088 for the year 2026-27
15.Construction of CC road, drain, and slabs from Krishna Nagar service road to the canal (Bamba) in Ward No. 36.
Construction of RCC drain from the turn of village Chainpur to the canal in Nagar Panchayat Kapilvastu Ward No. 04 Gandhinagar
Road Naveenikaran work of Bahota Dy s canal service road from km. 11.468 to km. 13.088 for the year 2026-27
Road Naveenikaran work of Farrukhabad Branch s canal service road from km. 31.450 to km. 33.000 for the year 2026-27