Loading…
Loading…
9,469 results • Best match
Scraping of internal section of Manikpur Canal from Km. 0.000 to km. 5.850
Scraping of Internal Section Of Manikpur Canal from km.0.000 to km.5.850
RENEWAL OF SERVICE ROAD OF SHAKTESHGARH CANAL FROM KM. 0.800 TO KM. 3.500
Reconstruction of VRB (Box Culvert Type) at Km. 41.215 of Kishanpur Pump Canal
Reconstruction of VRB (Box Culvert Type) at Km. 11.900 of Kishanpur Pump Canal
Boundry wall of Ghunna inspection house of Upper Division Eastern Yamuna Canal Saharanpur
Reconstruction of VRB (Box Culvert Type) at Km. 34.900 of Kishanpur Pump Canal
Boundry wall of Meghchappar inspection house of Upper Division Eastern Yamuna Canal Saharanpur
Renovation of service road of Ghori main canal from Km. 0.000 to 1.500
Boundry wall of Tikrol inspection house of Upper Division Eastern Yamuna Canal Saharanpur
Rennovation of Canal service road of Mughalsarai Mr. km. 8.000 to Km. 8.600
Boundry wall of Ashawali inspection house of Upper Division Eastern Yamuna Canal Saharanpur
Restoring of pucca works of fall at chainage Km. 7.200 Sukhara Main Canal.
Silt Clearance / Scraping of Canal Section of Tinich Dy. ( Km. 17.000 to 29.900)
Restoring of pucca works of fall at chainage Km. 3.800 Sukhara Main Canal.
Reconstruction of VRB (Box Culvert Type) at Km. 19.945 of Kishanpur Pump Canal
Scrapping work of bed and side slope of Shivpati canal (0.00 to 21.000km).
Silt Clearance / Scraping of Canal Section of Tinich Dy. ( Km. 4.400 to 10.000)
Silt Clearance / Scraping of Canal Section of Betawa Minor ( Km. 0.000 to 9.900)
REPAIRING OF BITUMENOUS SERVICE ROAD OF KHARA CANAL FROM K.M. 4.240 TO 7.800
Scrapping work of bed and side slope of Bhesai canal (0.00 to 17.400km).
Renovation of service road of Kota Pump Canal from Km. 0.600 to 1.300
SEE IN TECHNICAL BOQ
Construction of C.C.Lining in Internal Section of Kulba Dy. from Km.3.600 to Km. 4.800 and Construction of 07 No. Kulabas
Restoration of lining work and capacity of Jullupur Sihour Mr. From Km. 0.000 to Km. 4.200
dismantling of old equipment
Construction of New Boundriwall for Protection of Nanau Jiledari Second and Third and development the Premises
FABRICATION, SAND BLASTING, EPOXY PAINTING, SHIFTING ERECTION OF NEW TRASH RACK (06 NO. SIDE 02 NO. TOP) MADE OF M.S. PLATE OF 12 MM AND 8 MM, DISMANTLING OF OLD WORN OUT TRASH RACK OF SUCTION SIDE OF PUMP NO. 3 4 INCLUDING ALL MATERIAL, LABOUR AND
Restoration of lining work and capacity of Harduaganj Dy. From Km. 10.000 to Km. 13.000
Restoration of lining work and capacity of Harduaganj Dy. From Km. 3.400 to Km. 7.600
SITC HIGH MAST
DISMANTLING OF OLD PUMP MOTOR ETC
Restoration of internal section of mat branch feeder from km 0.000 to km 11.000
Relaying of Water Supply works on Roof at E-in-C Office, Cantt Road, Lucknow. (Lot 07)
sitc dismantling joint
FABRICATION, SAND BLASTING, EPOXY PAINTING, SHIFTING ERECTION OF NEW TRASH RACK (06 NO. SIDE 02 NO. TOP) MADE OF M.S. PLATE OF 12 MM AND 8 MM, DISMANTLING OF OLD WORN OUT TRASH RACK OF SUCTION SIDE OF PUMP NO. 1 2 INCLUDING ALL MATERIAL, LABOUR
Restoration of lining work and capacity of Harduaganj Dy. From Km. 7.600 to Km. 10.000
Renewal and Repair Repair of Service Road of machua DY. from KM. 40.076 to 75.600
Renuvation of Gate no. 1, 2, 3 and Toilet of Room no.F2, F8, G3, G15 and G16 at Dr. Ram Manohar Lohiya Transit Hostel Telibagh, Lucknow. (Lot 05)
Fabrication and Erection of hand railing
New Brick Lining Work With Plaster
Restoration of lining work and capacity of Harduaganj Dy. From Km. 16.000 to Km. 18.000
Construction of C.C.Lining in Internal Section of Kulba Dy. from Km.2.400 to Km. 3.600 and Construction of 07 No. Kulabas
Construction of C.C.Lining in Internal Section of Kulba Dy. from Km.4.800 to Km. 6.000 and Construction of 06 No. Kulabas
remval of suction water
Maintenance and Repairing of Type-IV Residence No 2/4 at New Parikalp Vihar Colony, Telibagh, Lucknow. (Lot No.11)
SITC OF DISMANLTING JOINT
Manufacturing and erection of suitable indoor type Automatic Power Factor Corrector (APFC) Panel compatible with Scada/IOT
New Brick Lining Work With Plaste
FABRICATION, SAND BLASTING, EPOXY PAINTING, SHIFTING ERECTION OF NEW TRASH RACK (06 NO. SIDE 02 NO. TOP) MADE OF M.S. PLATE OF 12 MM AND 8 MM, DISMANTLING OF OLD WORN OUT TRASH RACK OF SUCTION SIDE OF PUMP NO. 7 8 INCLUDING ALL MATERIAL, LABOUR AND