Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x400 Sqm. size complete in all respects at Sudav Pump Canal As directed by Engineer in Charge
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x630 Sqm. size complete in all respects at Guraini Pump Canal as directed by Engineer in Charge
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x400 Sqm. size complete in all respects at Dhanaitpur Pump canal As directed by Engineer in Charge .
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x630 Sqm. size complete in all respects at Niyardih Pump canal As directed by Engineer in Charge .
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x240 Sqm. size complete in all respects at Naubatpur Pump Canal As directed by Engineer in Charge
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x240 Sqm. size complete in all respects at Chhitauni Pump canal As directed by Engineer in Charge .
Providing and Laying Aluminium Conductor P.V.C. Sheathed cable 1100 volts grouting with M.S. Clamps of 3.5x240 Sqm. size complete in all respects at Gopalpur Pump canal As directed by Engineer in Charge .
REPAIRING OF DAMAGED V.R.B. AND BRICK LINING AND STRENGTHENING BANKS OF RASOOLPUR CANAL IN RASOOLPUR CANAL SYSTEM IN DISTT. BIJNOR FOR THE YEAR 2021-22(LOT-07)
Renovation on Canal Service Road R/B from Km 8.080 to Km 8.800 of N.P.C.
New construction work of canal service road from km 1.410 to 1.820 of Rajwah Halwakhanda
1st class brick lining work with 100pc new brick and C.C 124 cm on bed from chainage 1.080 km to 1.400 km including all cost of material, labour, tool and plant etc. as per bill of quantity at Rudauli pump canal district Ayodhya
NABARD FUNDED MODERNIZATION OF CH. CHARAN SINGH DUMARIYAGANJ PUMP CANAL SIDDHARTH NAGAR. SUPPLY INSTALLATION AND TESTING OF LIGHTNING ARRESTER INCLUDING EARTHING AT DUMARIYAGANJ PUMP CANAL SIDDHARTHNAGAR.
Construction of Pucca Structures and E/w for construction of canal at various reaches in between km. 0.450 to km. 14.650 of Left Pandu Basin Canal.
Construction of boundary wall to keep the land of Unchauliyan Canal Kothi located under the third subdivision of Hardoi Division Sharda Canal Hardoi, free from encroachment
Under District Maharajganj, Construction of Road from Parsauni Canal Bridge Pitch to Canal Track from Barwa Madho to Chamania Pipra Munderi Link Road Lot No 4
NABARD Funded Modernization of Doharighat Shayak Pump Canal, Dist- Ballia. Supply, Installation, Testing and Commissioning of 30 KVA DG Set at Doharighat Shayak pump canal, Ballia.
New construction work of the connecting road from the culvert of Jamaluddin Patti Canal to Pakwainar Mahrupur via the canal track. (Including 5 years maintenance cost)
Restoration of the Internal section of the Bah Main Canal from Km 0.000 to Km 69.600 and installation of Outlet on the Bah Main Canal system.
Work of canal restoration and demarcation of canal land from km 0.000 to 35.000 (head to tail) of Sahar Dy in Kanpur Dehat and Auraiya District.
LOT- 04 Restoration work and demarcation of canal land from km 0.000 to 61.200 of Jalaun Dy. under Betwa Canal Division-Ist, Orai In district Jalaun.
Repairing of Bridges , Head regulator cum VRB of LRC (main canal), Ghisoly Dy, Chitra Minor, Aagar Minor, Nagwas Minor and Vinekamafi Minor at Lower Rajghat Canal.
Protection work of Damaged canal wing of Drainage- Xing of Siriya drain at Km.67.860 of Rapti main canal S/Road side (D/S), Distt- Balrampur
Nabard funded modernization of Doharighat Shayak Pump Canal, Dist-Ballia. Supply, Laying/Installation and testing of Lightning arrester including earthing at Doharighat Shayak pump canal, Ballia.
LOT-09, Construction of Pucca Service Road and Protection Works of Canal section from Km 25.700 to Km 30.900 of Betwa Main Canal in District Jhansi
Brick work ,cement plaster with all cost of material including Labour and Tool and Plant etc at with all cost of material including Labour and Tool and Plant etc at Manikpur Pump canal in District Sitapur .
RESTORATION AND REPAIRING OF RESIDENCE QTRS DRNT 1 TO DRNT 4 AND SC 1 TYPE I WATER PROOFING ROOF TREATMENT OF BLOCK NB HW AND EMPTYING OF SEPTIC TANKS AT CANAL COLONY OKHLA NEW DELHI 25
Construction of Fall at km. 6.800 and Construction of canal from km. 6.700 to km. 6.800 of Dingarpur Dy. under Madhya Ganga Canal stage-II.
Construction of V.R.B at km. 7.765 and Construction of canal from km. 7.700 to km. 7.800 of KUNDERKI DY under Madhya Ganga Canal stage-II.
Construction of D.R.B. cum fall at km. 26.640 and canal from km. 26.600 to km. 26.675 of Dingarpur Dy. under Madhya Ganga Canal stage-II.
Construction of D.R.B at km. 17.430 and Construction of canal from km. 17.400 to km. 17.450 of Dingarpur Dy. under Madhya Ganga Canal stage-II.
Protective works on both sides of the Super Passage constructed at Km 43.200 of the Meja Jirgo Link Canal, including strengthening of the canal banks.
Construction of D.R.B at km. 17.430 and Construction of canal from km. 17.400 to km. 17.450 of Dingarpur Dy. under Madhya Ganga Canal stage-II.
Part B Lot No. 02 The repair work of Foot Bridge at km. 33.509, 39.333, 43.072 of Tanda Main Canal and V.R.B. at km. 32.748, 35.635, 39.733, 40.781 and 44.342 of Tanda Main Canal and V.R.B. at km. 15.300 of Tanda Pump Canal.
Construction of inlet at km 3.300 of Barwar feeder canal Lot5
Construction of inlet at km 4.450 of Barwar feeder canal Lot7
Construction of inlet at km 1.150 of Barwar feeder canal Lot03
Construction of inlet at km 5.400 of Barwar feeder canal Lot09
Construction of inlet at km 5.200 of Barwar feeder canal Lot8
Construction of inlet at km 0.620 of Barwar feeder canal Lot02
Construction of inlet at km 1.675 of Barwar feeder canal Lot4
Repair or Renovation work of Inpection House at Sonbarsa in Irrigation Division Gorakhpur.
Renovation works of residential buildings at Irrigation Colony in District Banda. LOT-07
New Construction work of Deshraj Pehelwan Chauraha (Village Malav) to Bandha (Irrigation Dam)
Renovation work of Inspection house at Kasia Irrigation Division, Kushinagar in Distt.- Kushinagar.
Repair Renovation work Of Saryu Nahar Colony At 15th Cricle Irrigation Works ,Gonda
Construction of Divisional office Building of Irrigation Division Firozabad situated at Distt. -Firozabad
INSTALLATION OF TUBEWELL WITH PUMP HOUSE FOR IRRIGATION AT DISTRICT JAIL BARABANKI (U.P.)
Irrigation Equipment Sprinkler Pipes (V2) as per IS 14151 (Latest) (Q2) ( ( 3 3 ))
Atharha Canal from KM 05 to Chaptahi Tola Link Road
Retender Construction of Canal Service Road from Km. 0.000 to 10.200 of Nagina Branch cum Escape under Eastern Ganga Canal Construction Division-6, Najibabad in district Bijnor.