Loading…
Loading…
9,440 results • Best match
Construction of Canal protection work between km-10.400 to 10.950 of B.S.F.C.
Renovation work of Kurahua Minor from Km. 0.00 to Km. 0.600 at Muradev Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department.
Bank Protection in River Bank From 20.50 Mtr. to 41.00 Mtr. at Manikpur Bhujana Pump canal including all cost of material excluding Cement, labour, T and P used. Complete in all respects as per drawing specifications provided by department.
Construction of Ramp and Stair Case for Delivery Pipline at Niyardih Pump Canal including all cost of material (excluding Cement and Boulder), labour, TANDP used complete in all respects as per drawing provided by department. as directed by Engineer
Costruction of Ramp and Staire Case at Newajganj East Pump Canal including all cost of material, (excluding Cement) labour, T and P used, Complete in all respect as per drawing provided by department. as directed by Engineer in Charge.
Concrete payment block interlocking work in Compound at Balua Pump Canal including all cost of material, (excluding Cement ) labour, T and P used, Complete in all respect as per drawing provided by department. as directed by Engineer in Charge.
Construction of Ramp and Stair at head of Sudav Pump Canal including all cost of material (excluding Cement ), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
Construction of Pucca service Road from km. 0.000 to km. 5.000 of Dhoba Pump Canal
Strip and Reservoir Area Survey of Panchnad Irrigation scheme in Auraiya District of Uttar Pradesh by Unmanned Aerial Vehicle (UAV)
First class brick lining work with 60pct. new brick with cement plaster on both side wall and cc work on canal bed at Naugawa pump canal in district Ayodhya.
Custom Bid for Services - Deployment of manpower for misc works at Dalmau Pump Canal DPC TFC and Sharda Sahayak Canal NTPC Unchahar Similar Category Operation and Maintenance Power House/Power Plant
NABARD Funded Modernization of Ch. Charan Singh Doharighat Pump Canal, Distt- Mau SGR BUILDING BOUNDARY WORK (145 MRT. LENGTH) with all requierd accessories, tool and tackle at doharighat pump canal mau
Providing manufacturing and fitting of Lifting Mechanism of Bay No 01 Bharna Cross Regulator Gate Size 6.00 Mtr.x2.50 Mtr. at 69 miles on Agra Canal for Upper Division Agra Canal, Mathura
NABARD FUNDED MODERNIZATION OFF CH. CHARAN SINGH GOLA PUMP CANAL GORAKHPUR. SUPPLY, INSTALLATION AND TESTING WITH PROPER LAYING OF 3Cx240 mm2 11 KV HT XLPE CABLE AT GOLA PUMMP CANAL, GORAKHPUR.
Construction/Renovation of Circle office building of Ken-Betwa Link Canal Construction Circle Mahoba and Division Office Building, Sub Division Office building of Ken-Betwa Link Canal Construction Division-1, Mahoba.
NABARD FUNDED MODERNIZATION OF CH. CHARAN SINGH DUMARIYAGANJ PUMP CANAL SIDDHARTH NAGAR. SUPPLY. INSTALLATION, TESTING AND COMMISSION OF DISMANTLING, JOINTS OF DELIVERY PIPLINE 1300MM DIA AT DUMARIGANJ PUMP CANAL SIDDHARTH NAGAR
Providing manufacturing and fitting of Lifting Mechanism of Bay No 03 Bharna Cross Regulator Gate Size 6.00 Mtr.x2.50 Mtr. at 69 miles on Agra Canal for Upper Division Agra Canal, Mathura
Bank Protection in River Bank From 0.00 Mtr. to 20.50 Mtr. at Manikpur Bhujana Pump canal including all cost of material excluding Cement, labour, T and P used. Complete in all respects as per drawing, specifications provided by department. As direct
Repairing of barge No-01 (old barge) at Balua Pump Canal including all cost of material, (excluding M.S. Plate) labour, T and P used, Complete in all respect as per drawing provided by department. as directed by Engineer in Charge.
Construction of Ramp and Stair Case for Delivery Pipline at Kaithi Pump Canal including all cost of material (excluding Cement and Boulder), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer
Concrete payment block interlocking work in service road at Balua Pump Canal including all cost of material, (excluding Cement ) labour, T and P used, Complete in all respect as per drawing provided by department. as directed by Engineer in Charge
1st class Brick lining work of Kakrait minor from 0.900 km to 1.050 km. at Kakrait Pump Canal including all cost of material (excluding Cement), labour, T and P used complete in all respects as per drawing provided by department.
Construction of Boundary Wall, Retaining wall, Compound gate at Muradev Pump canal including all cost of material (excluding Cement and Bricks), labour, T AND P used complete in all respects as per drawing provided by department. as directed by EngG
Construction of Ramp at Slope of River Bank at Naubatpur Pump Canal including all cost of material (excluding Cement ), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
Construction of Ramp and Stair Case for Delivery Pipline at Bhagwanpur Pump Canal including all cost of material (excluding Cement and Boulder), labour, T AND P used complete in all respects as per drawing provided by department. as directed by Engin
First Class Brick lining work of Magraha Minor from 2.100 Km. to 2.500 Km. at Adalpura Pump canal including all cost of material excluding Cement labour T and P used complete in all respects as per drawing provided by department
Construction of Ramp and Stair at Slope Bank of Halua Pump Canal including all cost of material (excluding Cement ), labour, T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
Construction of Retaining wall and River bank Piching work at Bhusi South Pump Canal including all cost of material (excluding Cement), labour, Tand P used complete in all respects as per drawing provided by department. as directed by Engineer in C
Construction of Ramp and Stair Case for Delivery Pipline at Guraini Pump Canal including all cost of material excluding Cement labour T and P used complete in all respects as per drawing provided by department. as directed by Engineer in Charge.
Construction of Canal From km. 0.793 to 1.055 of Bhaita Mr.(Lot-25)
RR of Sharda Canal Hardoi Branch left Side Patari Chaudhari Salidra pul tak
Renovation /Repairing work for office of the sharda canal division in Distt. Shahjahnapur
CONSTRUCTION OF CAMP HOUSE AT DELIVERY TANK OF BABINA FEEDER CANAL LOT 1
Silt Clearance/Scrapping work of Banghoghwa Main Canal (Km. 0.000 to Km. 8.100)
Special repair work of Margupur Canal to Ucheda Koiri Tola via Kripa Nagar
Construction of Canal From km. 0.020 to 0.150 of Sikanderpur Mr.(Lot-04)
Widening of C.C. Road at Bank of the canal, Bypass road, NH19, Shikohabad.
Renewal work along with general repair of Jani Canal patri to Adheda road
Construction of Canal From km. 3.628 to 3.664 of Sherpur Mr.(Lot-16)
CONSTRUCTION OF INLET AT LAKHERI MAIN CANAL BETWEEN KM. 0.950 TO KM. 7.200
Construction of Pitch work form Sonaura Canal to village Bara. (Length- 2.00 KM)
Renewal work along with general repair of Pauta link road from Karagaina Canal
CC work from Malipur Canal towards Gauvapar Primary School Road in Vikaskhand Nagara
Renovation / Repairing on Canal Service Road of BMC from Km 1.900 to 4.000
Construction of R.C.C. tail gul for connecting Kachnauda left canal to Dulawan Dy.
Renovation / Repairing on Canal Service Road of BMC from Km 21.400 to 22.400
Saunha Parsauni pitch road Adrauna via to Pathardeva Head Khasrari canal pitch road
Construction of Canal From km. 5.080 to 5.150 of Panwasa Dy.(LOt-01)
Renovation/Repairing of Canal Serivce Road of NPC from Km 18.900 to 19.400
LOT-01 Renovation work of Ranipur main canal from Km 40.750 to 41.770