Loading…
Loading…
17,251 results • Best match
M/R to damaged 01 ONE no. Single vent sluice at Mouza-Bhubannagar, Block-Kakdwip under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division.
Refurbishment of Office Building at Penro Irrigation Campus in Block Udaynarayanpur, Howrah District, under Howrah Irrigation Division, I W Directorate Govt of West Bengal
Installation and setup Irrigation Shallow with Pump house and Irrigation Canel near LO Gouranga Barman at Sansad XV under Jateswar-II G.P. (2023-24)
Maintenance and repair to Ramchandrapur Irrigation Scheme by clearing water hyacinth and jungle cutting under Purulia Construction Division (Irrigation) during the year 2020-21.
MR to fall structure at Ch 85.00 OF Dy1 of Rupai Irrigation scheme under Purulia irrigation Division at Block JhaldaI P S Jhalda Purulia
M/R to sapkhali jora sluice including silt clearance of down stream side at Mouza - Sapkhali, underSagar Irrigation Sub-Division of Kakdwip Irrigation Division
Cutting and clearing jungles of Maliarajore Dam embankment in connection with Kharif Irrigation 2025 under P.S. Block Gangajalghati, Dist. Bankura of Asansol Irrigation Division
Construction of 2 Nos. CD structure at Ch.124 and Ch187.5 of LBMC respectively in connection with Patloi Irrigation Scheme under Purulia Irrigation division
Renovation to C1,C2,C3,C4,C5 quarter including allied works within Kakdwip Irrigation campus under Kakdwip Irrigation Division in connection with G.S.Mela-2026
Supply Installation Testing and Commissioning of Garden lights at Ukil Para Durga Mandir Bijoy Sangha Mandir Cornation School Ground Jagriti sangha Haribasar Para Uday Mohila Sangha Canal side and Municipal Park of Raiganj Municipality
Construction of Protection wall at bulan Canal near tipu pond at bara kadra mouza JL. No.-137 Plot No.32, of Goaltore Gram Panchayat Under Garhbeta-II Panchayat Samity, in the District Paschim Medinipur. Activity Code- 127547328
Keeping day to day record of Water Level at Barrage Pond and Water Supply Canal and also if requiredoperation of various gates at Head Regulator and Navigation Channel Durgapur for a period of 731 days.
Special repairs to the rest shed at Kirnahar I Sub-Division office campus in Block and P.S - Nanoor, Dist- Birbhum under Mayurakshi South Canals Division.
Urgent palliative measure at the right bank of river Babla near Suvasnagar RLI pump house under Salar I Sub Division of Mayurakshi South Canals Division.
Annual maintenance of Sarala Khal from 0.00 Km to 5.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.04.2025 to 31.05.2026
Back feeding of water throughBasulat Sluice (2 Vent) for Boro cultivation of the year 2022-23 under Diamond Harbour (I) Sub Division of Canals Division
Maintenance and Repairs to the 14 vent sluice over Bhangorekata Khal in Mouza Makhla, P.S and Block Haroa, District North 24 Parganas under Canals Division
Operating of Singhalganj Sluice Gate (6 Vent) throughout the rainy season during the year 2026-27 under Diamond Harbour(I) Sub-Division of Canals Division
Operating of Hanra Sluice Gate (6 Vent) throughout the rainy season during the year 2026-27 under Diamond Harbour(I) Sub-Division of Canals Division
Periodical maintenance of beautified area at Keorapukur Pumping Station at Kudhghat under Tollys Nullah Sub Division of Canals D for the period of 365 days
Construction of Portico in front of office building at Kangsabati Colony at Bishnupur under Kangsabati Canals Division No-III, Bishnupur Bankura during the year 202526
Annual maintenance of Chowreswar Khal from 0.235 Km to 6.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.04.2025 to 31.05.2026
Yearly maintenance of Uporkhara Mini Barrage including operation of gates under Bolpur ( I ) Sub-Division of Mayurakshi South Canals Division during the year 2023-24.
2nd Call (Re eTender) for the Procurement of 10 Nos. Rowing-Boats, under the Health Department (KMC), for undertaking Larvicidal spray along the Mosquitogenic Canals
M/R to 1 no. residential quarter (Quarter No-A-West) at Shalbagan (I) colony of Bolpur (I) Sub Division within Mayurakshi South Canals Division.
M/R to Mollarpur Head Quarter(l) Section Office building of Mollarpur(l) Sub-Division at Block-Mayureswar-I, Birbhum under Mayurakshi North Canals Division.
Annual maintenance of Chowreswar Khal from 0.35 Km to 6.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Annual maintenance of Sarala Khal from 0.00 Km to 5.00 Km by clearing and removing water hyacinth etc. under Canals Division from 01.06.2026 to 31.05.2027
Repair and Maintainance of SDO Quarter and other different type of Quarters including Sub Division Office in Kangsabati Canals Sub-Division no XIII Bamda Jhargram.
Rehabilitation of Ramchandrapur Irrigation Project within Block PSSanturiDistrict Purulia
Rehabilitation of Ramchandrapur Irrigation Project, Block- Santuri, Dist- Purulia.
Survey of embankments under North East Irrigation Circle II
Periodical maintenance of Sepoy bundh for Khariff Irrigation 2023
Construction of Irrigation Channel at Fulta Bandh at Shyampur.
Five HP submerssible at Baisan danga for irrigation purpose
Installation of solar irrigation system 5HP solar surface pump
5HP OFF GRID SOLAR IRRIGATION PUMPING SYSTEM AT MUGURA
Rehabilation of Barabhum Irrigation Project within Block PSBarabazar DistrictPurulia
Installation of Submersible pump for irrigation at Jambedia village
Supplying Fitting and Fixing Irrigation Purpose Hume Pipe Work .
Renovation of electrical wiring and illumination of Digha Inspection Bungalow and compound and allied works including S.I.T.C of D.G. set within Block- Ramnagar-I, P.S.-Digha, Dist.- Purba Medinipur.
M/R to ghoges, bank cuts of Ajoy right Embankment including approach at 15.180km near village Majhkhara and at 16.850km near village Paschim Nabagram in Block Ps-Mongalkote under Bhedia (I) Section No. II of Guskara (I) Sub-Division of Damodar Head
M/R to rain cuts and earth slips in between 10.80km to 11.50km of Ajoy right embankment including repairing bank cuts and approach near 11.00 km of village Kathalbagan in Block and PS-Mongalkote under Bhedia (I) Section No II of Guskara (I) Sub-Divis
Providing Generator Set for TDD.Sub-Division and office compound at AMTA on monthly hire basis to facilitate continuous and steady supply to the said premises for smooth performing of regular official work under WBMIFMP NP_D3_How11
C. C Road Quarter Boundary Wall andother anxilliary work
Installation of off-grid solar Irrigation pumping system for (2x2Ha) 4 Ha (SPSIS) with 2x2H.P. Solar pumping system at Gayes-I (Gayes WHT) under Hanskhali (A.I) Sub-Division within the Jurisdiction of Krishnagar-II (A.I) Division under RIDF- XXIX Pro
Supply installation and commissioning of 46 nos of 2 HP solar surface irrigation pumping system at existing WDS at Patharpratima Gosaba and Canning I Block in the district of South 24 Parganas including maintenance for 5 years under DPMU Sout
Construction of different work at Purba Medinipur KVK campus, BCKV (1. Irrigation system, 2. Farm pond and allied works 3. Vehicle and Implement shed 4. Farm road 5. Storage Godown) under Tamluk Sub Division, PWD during the year 2023-24
Installation of Rigbore Tubewell 200mm X 150mm X 200 mtr Deep (By DTH Rigmachine) Irrigation Purpose including fitting fixing of Submerssible pump at Kanchanpur Hattala at Mouza Kanchanpur iJL No 245 Plot No under Purandarpur Gram Panchayat out of 1
Installation of Rigbore Tubewell 200mm X 150mm X 200 mtr Deep (By DTH Rigmachine) Irrigation Purpose including fitting fixing of Submerssible pump at Embankment of Kankar Sora Pukur at Mouza Sanbandha JL No 210 Plot No under Sanbandha Gram Panchayat