Loading…
Loading…
17,253 results • Best match
M/R to removal of deposited earth from canal bed in-between Ch. 66.00 and Ch. 170.00 of Dy. No.- 04 of D.B.B.C under Bonta (I) Section of Rampurhat (I) Sub Division within M.N.C.D during the year 2024-25
Crossing 250 mm Dia MS pipe under the canal in connection with source Augmentation of OCP based PWSS of Kajora (Ghanashampur OCP) including intake arrangement construction of Steel Truss Bridge, Guard Room, CWR Boundary wall, Laying of rising main,
Desiltation of Dy. 19 of Garbeta Branch Canal (G.B.C.) including repairing of Head Regulatory Structure in between Ch.0.00 to Ch.71.55, Amlagora HQ. Section of K.C. sub Division No. VII under K.C. Division No.-I, Amlagora, Paschim Medinipur.
RE EXCAVATION OF CANAL FROM GOTURA CREMATIRIUM TO SANGRAMPUR WATER TANK VIA MAJHERHAT AT BLOCK DIAMOND HARBOUR I MOUZA UTTAR DEARAK GP DEARAK JL NO 131 PLOT NO 1 648 OF SOUTH 24 PARGANAS DISTRICT UNDER CORE SECTOR PROGRAMME
REJUVENATION OF BIDYADHARI II CANAL FROM BANTALA TO BAJBARONTALA IN EAST KOLKATA WETLAND AT MOUZA DHAPA KHARKI BLOCK KMC SONARPUR WARD 108 IN THE DISTRICT OF S 24 PGS UNDER THE EE AI KOLKATA AI DIVISION UNDER JALATIRTHA PROGRAMME
RE EXCAVATION OF CANAL FROM BUNORHAT MORE TO ONGC KHAL AT BAGDA AND PATRA MOUZA UNDER DIAMOND HARBOUR II BLOCK IN THE DISTRICT OF S 24 PGS GP PATRA JL NO 106 PLOT NO 1579 UNDER CORE SECTOR PROGRAMME
Reexcavation of Canal and allied prote. works along with Institutional Delop. through formation of WUA from Sasati Rupnarayan Riv Side to Gajen Mollick Jamin via Bardajpur, Uddahbpur Damodar Riv, Sasati GP, Shyampur II Dev Block Hwh Core Sec 2526.
Construction of Concrete Road Including Guard Wall from Sub Canal to Firoja Begam house via Jatin Debnath to Bablu Debnath at Phansidewa III Sansad under Phansidewa Bansgaon Kismat G. P. of Phansidewa Development Block under 14th. F.C. fund. (A.A
Construction of Road from Pasang Girls High Scool to 6 S Canal via - Kanchangeria Pry. School at DUAN-I GP within DEBRA Block in the District of Paschim Medinipur. Length 2.21 Km. NIT No - N7 of 23-24 SL22
1) Renovation of Canal Purnapani Bandh to Phulbani Adibasi Para (57475.00) , 2) Repair of Tubewell near Bimal Hemrams house at Phulbani Adibasi Para (36947.00) 3) Repair of Submersible near Phulbani Danga ICDS Center (26154.00) 4) Repair of doors an
PROTECTION WALL OF ROAD OF CANAL SIDE FROM BANESWARPUR PURBA RUIDASPARA KALI MANDIR TO RUIDASPARA CULVERT AT BANESWARPUR PURBA UNDER BANESWARPUR - I GP UNDER SHYAMPUR-I PANCHAYAT SAMITY UNDER 15 TH FC UNTIED FUND 24- 25 ACTIVITY CODE - 97806164
Construction of Cement Concrete Drain with side concrete Road from the H/O i.)Putul Mal to Prasanta Sarkar, ii.) Tapas Mondal to Sundor Show, iii.) Chandan Sahani to Canal all are in Ward no-11, under Bolpur Municipality.
Construction Of Lined Field Channel With Allied Works from Ch 26.00 R B DY No 11 of Simlapal Branch Canal to Nutan Bundh At Mouza- Narottampur JL NO 49 PLOT NO 972 G.P Bibarda, Block Taldangra In Bankura District
Construction of concrete drain from main road to canal at Birsinghapur-II, Sansad- Birsinghapur, JL No.- 215, Plot no- 180, under Panchkhuri-I Gram Panchayat, Midnaproe Sadar Panchayat Samity, Name of Fund- XVFC, FY- 2025-26, Activity Id- 109609661
Construction of Slab Culvert near Jakub Canal Sahidul Haque at Purba Nararthali house Part No 143 under Khoardanga No II G.P within Kumargram Development Block at Alipurduar district for the year-2023 24 Fund 15th F C2023 24 2ND CALL
PAINTING TO WALL AND GRILL ALONG CANAL SOUTH ROAD FROM HANUMAN MONDIR TO 29, CANAL SOUTH ROAD AND DEPICTION OF PICTURE AND OTHER ANCILLARY WORK AT CANAL SOUTH AND MATHUR BABU LANE IN WARD NO. 57, BR. VII
Renovation of 18 no radial gates of cross regulators at of Bishnupur Branch canal and 2 no Head Regulator and 5 no escape canal gates of Indpur Main canal within Block and PS- Indpur,Onda, Bishnupur Dist- Bankura
Maintenance of canal T.S.M.C.(S) ( in between Ch. 460.00 And Ch. 560.00 ) including repair of canal bed over Cross drainage at ch. 556.00, erosion of canal banks and ghoges at different chain at G.P.- Heriyatara, Block-Kharagpur-I.
MR to Structures at Ch.91.00 of Dy 2 , at Ch.7.00 of MinorA of Dy 2, at Ch.25.00 of MinorA of Dy 3 and at Ch.300.00 of Dy 4 of B.B.C. for ensuing Rabi Irrigation under Bankura Irrigation Sub-Division of Bankura Irrigation Division.
MR to BMC between ch 88 and ch 188 ch 340 and ch 380 Dy1 of BMC between ch.18 and ch162 and Dy3 of BMC between ch108 ch205 during ensuing kharif irrigation of Onda Section under Bankura Irrigation Sub Division of Bankura Irrigation Division 23 24
SL 3 Drilling Installation and Maintenance of 150 mm dia Machine bored 4 Nos of Light Duty Solar Operated Tube well Scheme for irrigation and drinking water Mouza Singhapara Paschim Kasba Purba Ranipur Atghara JL No 219 81 253 170 Plot No 25161 303
ESTIMATE FOR INSTALLATION OF SOLAR SUBMERSIBLE (3HP AC OR SOLAR IRRIGATION PUMPING SYSTEM) NEAR CHAPER MATH AT IRSANDA UNDER CHANAK GP OUT OF CFCG(2024-25) ACTIVITY ID-97650405.(WITH 10 NOS OF 335 WP SOLAR MODULE AND 2 NOS OF MANUAL TRACKING STRUCTUR
i- Installation of Submersible with pipe line for irrigation at mouza-Amdahra, J.L. No. 147, Plot No. 4 at Bankadaha GP 15th FC TIED, ii- Installation of Mark-II Tubewell at Methena Lohar Para under Patrasayer Block under 15th F.C.-TIED fund at Banku
Construction of CC Irrigation drain from Joruli Sanko towards Sian Bandh Pukur North Side at Purba Islampur (Mouza -Purba Islampur ,Jl No-130) vide Supply(23-24), SL No-02,under the fund of 5th SFC (TIED)/23-24 ,under Sian Muluk Gram Panchayat unde
ESTIMATE FOR INSTALLATION OF SOLAR SUBMERSIBLE (3HP AC OR SOLAR IRRIGATION PUMPING SYSTEM) NEAR JOLAR MATH AT IRSANDA UNDER CHANAK GP OUT OF CFCG(2024-25) ACTIVITY ID-97651682.(WITH 10 NOS OF 335 WP SOLAR MODULE AND 2 NOS OF MANUAL TRACKING STRUCTURE
SL 5 Drilling Installation and Maintenance of 150 mm dia Machine bored 4 Nos of Light Duty Solar Operated Tube well Scheme for irrigation and drinking water Mouza Dhalsana Popra Tilbhog Sardarpurand Baniyal JLNo 49 68 72 100 Plot No 367 574 287 988
EXTENTION OF PIPE LINE (650 m) AND SPOUT CHAMBERS (4 Nos.) TO IRRIGATION FIELD WITHIN THE COMMAND AREA OF P.K.C PUR-II GOVT. OWNED AND OPERATED MAJOR RLI SCHEMES UNDER BONGAON-II (A-M) SUB-DIVISION UNDER BARASAT (A-M) DIVISION, NORTH 24 PARGANAS
Construction of one no. Hybridization Block of size 28x17 mtr, One no. Net House of size 10x8 Mtr, One no. Rat Proof Seed Godown f size 7.5x5 Mtr and connecting HDPE Pipe line for Subsurface Irrigation facilities at ICAR IIGR RRS, West Medinipur, West Bengal.
Construction of irrigation field channel from the L/o Prabir Biswas towards land of Balaram Biswas at Shibnibas , Sansad No- VI, under Shibnibas GP under 15th FC (Tied Fund), AC NO- 89769526/23-24, SAAP NO - 01/15th FC(Tied)/2023-24, GP G.B. Meeting
Construction of concrete road from Mandal Para bharatMunain house (Plot No. 55/157) To AsimMaity House near Canal Pul Via PrabirMaity House and RobaindranathMaity House JL No. 53 and JL No. 55 Plot No. ( 53/160) under Khirai GP
Construction of Brick paved road pilgrim road-6 at mouza- Kalinagar, P.S- Kakdwip under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga sagar mela-2022
Clearing and removing weeds floating water hyacinth at different Straches of Metekhal in between Ch. 0.00 and Ch. 760.00 under Champadanaga Irrigation Sub Division of Lower Damodar Irrigation Division.
Irrigation period maintenance on both bank of TJMC from 19.430km to 21.905km during boro Irrigation in Kranti Police Out Post, Block-Kranti, Dt.-Jalpaiguri during the year 2025-2026
Temporary approach cum ramp near Jetty no.-4 at Mouza - Kashtala of Kachuberia point under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in C/W G.S. Mela- 2023.
Irrigation period Running Maintenance works on Dy-3 and Dy-4 (including all of their Minors) of TMLC during Boro-Irrigation 2025 in Block -Rajganj Dist.- Jalpaiguri. (3rd Call)
Renovation of Kalinagar sluice at LB of river Ghatihara at Mouza Kalinagar in Block Sandeshkhali-I, District North 24 Parganas of Kalinagar Irrigation Sub-Division under Basirhat Irrigation Division.
M R to Small Regulator Gate structure at ch 120.00 R.B of Behula at Amadpurr G.P Amadpur of Memari Irrigation Section under Memari Irrigation Sub Division of LDI Divn.
M/R to damaged Palpara H.P sluice at mouza -Sumatinagar facing Sumatinagar khal under Sagar Irrigation Sub Division of Kakdwip Irrigation Division within Block- Sagar, Dist- South 24 Parganas
Maintenance and repair of Group A2 type quarter at Contai Irrigation Colony under contai Irrigation Sub- Division, in Block Contai -I, P.S.- Contai and Dist.- Purba Medinipur. (3rd call)
Construction of Temporary Camp Office at Kachuberia point, Mouza - Kashtala, P.S.- Sagar under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in C/W G.S. Mela2023, Near Jetty -5.
Annual Repairing and maintenance work of all electrical installations etc. at Champadanga Irrigation colony , Arambag irrigation colony and respective offices during the year 2024-25. (including procurement of material).
Supply of Welder and welding Machuine of Jetty No-4 during G.S. Mela under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with GANGA SAGAR MELA - 2023.
Providing Ordinary Security Guard Shifting basis at Digha Irrigation Inspection Bungalow, Old Digha Under Contai Irrigation Division for three months in Block - Ramnagar-I, P.S.- Digha, Dist Purba Medinipur
Repair Rehabilitation of Magurkhali Wooden bridge on the Maskata Khal at Mouza Jasaikati in Block Baduria, Dist North 24 Parganas under Basirhat Irrigation Sub Division of Basirhat Irrigation Division.
Compound Sanitary and Plumbing works of Chandannagar Irrigation sub Division office and Lichutala Irrigation colony for 210 days at Lichutala, Chandannagar within Chandannagar Municipal Corporation, Dist- Hooghly under LDID
Repair of brick Paved Road from Rail Line to NH-117 at Mouza Narayanpur under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division in Connection with Gangasagar Mela-2023.
Engagement of Electrical personnel for Repairing and maintenance of all electrical Installation at Chandannagar Irrigation colony,Chinsurah irrigation colony and respective offices under LDI division during 01.09.2022 to 31.03.2023.
Construction of Temporary Camp Office at Kachuberia point, Mouza - Kashtala, P.S.- Sagar under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in C/W G.S. Mela2023, Near Jetty -2.
Supply of flood fighting materials with utilisation as an when required basis for coming monsoon 2025 under the jurisdiction of Ranaghat Irrigation Section II under Ranaghat Irrigation Sub Division.
Providing Ordinary Security Guard ( Shifting basis) at Digha Irrigation Inspection Bungalow, Old Digha under Contai Irrigation Division for Seven Month in Block- Ramnagar-I, P.S.- Digha, Dist.- purba Medinipur.